ESBD_369596_1721928918593_582-24-85596-ER ERIG and 582-24-86400-VW TxVEMP RFGA-FINAL-acc.pdf

PDF 786 KB Posted

Attached to
Emissions Reduction Incentive Grants Program (ERIG)
Solicitation number
582-24-85596-ER
Issued by
Travis County, Texas

About this file

This document is a Request for Grant Applications (RFGA) issued by the Texas Commission on Environmental Quality (TCEQ) for the Emissions Reduction Incentive Grants (ERIG) Program and the Texas Volkswagen Environmental Mitigation Program (TxVEMP). The ERIG program provides financial incentives to repower or replace older locomotives, marine vessels, stationary equipment, and select non-road equipment to reduce nitrogen oxides (NOX) emissions in nonattainment areas and affected counties in Texas. The TxVEMP program provides financial incentives to repower ferries and tugs, and replace or repower freight switchers in priority areas in Texas. The application submission deadline is October 29, 2024, and the request for reimbursement deadline is April 30, 2027.

The ERIG program has approximately $55 million in available funding, with grants covering up to 80% of the eligible incremental costs for replacement and repower projects. The TxVEMP program has approximately $13 million in available funding, with grants covering up to 100% of the incremental costs for governmental entities and up to 75% for non-governmental entities. Applicants may apply for eligible projects under both the ERIG and TxVEMP programs, but can only receive a single grant award. The grants are paid on a reimbursement basis, and grant recipients must comply with annual usage and reporting requirements during the contract's Activity Life.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

i

Request for Grant Applications (RFGA) Texas Commission on Environmental Quality (TCEQ)

Emissions Reduction Incentive Grants Program (ERIG) Texas Emissions Reduction Plan (TERP) ERIG Solicitation No. 582-24-85596-ER

Ferry, Tug, and Switcher Grant Program Texas Volkswagen Environmental Mitigation Program (TxVEMP)

TxVEMP Solicitation No. 582-24-86400-VW

Este documento es la Aplicación para Solicitud de Subvenciones (RFGA por sus siglas en inglés) para el Programa de Subvenciones de Incentivos para la Reducción de Emisiones y para el Programa de Mitigación Ambiental de Texas Volkswagen (ERIG y TxVEMP, por sus respectivas siglas en inglés). La información de este documento le ayudará a determinar si reúne los requisitos para recibir una subvención en virtud de cualquiera de estos programas. Comuníquese al 800-919-TERP (8377) para obtener ayuda con la información sobre ERIG o comuníquese al 833-215-TXVW (8989) para obtener ayuda con la información sobre TxVEMP.

Important Dates Date

Program Opening Date July 25, 2024

Application Submission Deadline Oct 29, 2024

Request for Reimbursement Deadline April 30, 2027

Contact Information

TCEQ

Air Grants Division, MC-204 (ERIG) P.O. Box 13087 Austin, TX 78711-3087

800-919-TERP (8377)

terpgrants.org

TCEQ

Air Grants Division, MC-204 (TxVEMP) P.O. Box 13087 Austin, TX 78711-3087

833-215-TXVW (8989)

txvwfund.org https://www.tceq.texas.gov/airquality/terp/index.html https://www.tceq.texas.gov/agency/trust/ i

Applications will only be accepted for consideration during this grant period if received no later than 5:00 p.m. Central Time on the application submission deadline listed on the cover page of this RFGA. Refer to Section 11.0 for detailed instructions for submission.

The award of a grant is dependent in part upon the availability of funding. Any changes to this solicitation will be made through an addendum in the Electronic State Business Daily (ESBD), posted on the TxVEMP website at texasvwfund.org, as well as posted on the TERP website at terpgrants.org.

There will not be a pre-proposal conference.

http://www.txvwfund.org/ ii

Table of Contents

1.0 Invitation

2.0 Purpose

3.0 Eligible Applicants

4.0 ERIG Program Requirements

4.1 Eligible Project Categories

4.2 Non-Road or Stationary Equipment Replacement Qualifications

4.3 Non-Road or Stationary Equipment Repower Qualifications

4.4 Marine Vessel Replacement Qualifications

4.5 Marine Vessel Repower Qualifications

4.6 Locomotive Replacement Qualifications

4.7 Locomotive Repower Qualifications

4.8 Refueling Infrastructure

4.9 Operation of the Grant-Funded Equipment

5.0 TxVEMP Program Requirements

5.1. Eligible Project Categories

5.2 Ferry and Tug Repower Qualifications

5.3 Freight Switcher Replacement and Repower Qualifications

5.4 Electric Charging Infrastructure

5.5 Operation of Grant Funded Equipment

6.0 Annual Usage Rates

7.0 Marketable Emissions Reductions Credits Requirements

8.0 ERIG Available Funding and Grant Amounts

8.1 Available Funding

8.2 Determining Eligible Grant Amounts

9.0 TxVEMP Available Funding and Grant Amounts

9.1 Available Funding

9.2 Determining Eligible Grant Amounts

10.0 Determining Eligible Costs

10.1 Incremental Costs

10.2 Eligible Costs

10.3 Ineligible Costs

11.0 Grant Application and Administration

11.1 Application Forms

11.2 Application Process

11.3 Selection Process

11.4 Scoring Criteria

11.5 Additional Considerations

11.6 Grant Award and Contracting

11.7 Reimbursement of Expenses

11.8 ERIG Disposition Requirements

11.9 TxVEMP Disposition Requirements

iii

11.10 Standard Method of Disposition

11.11 Alternative Methods of Disposition

11.12 Disposition Verification to TCEQ

11.13 ERIG Annual Usage and Reporting

11.14 TxVEMP Annual Usage and Reporting

12.0 Performance Evaluation

Appendix A: ERIG’s Map of Nonattainment and Affected Counties Appendix B: TxVEMP’s Map of Priority Areas Appendix C: Waivers of Requirements

Appx. C-1. Good Cause Waiver of Ownership and Use Requirements Appx. C-2. Good Cause Waiver of Ownership, Replacement and Disposition of Third-Party Equipment Appx. C-3. Submitting a Waiver Request Appx. C-4. TCEQ’s Consideration of Waivers Appx. C-5. Approval of Waiver Requests

Appendix D: List of Equipment Types Not Eligible Under this Solicitation

1.0 Invitation

TCEQ invites applications under the Texas Emissions Reduction Plan (TERP) Emissions Reduction Incentive Grants (ERIG) Program and Texas Volkswagen Environmental Mitigation Program (TxVEMP).

While separate grant programs, opportunities for funding both ERIG and certain TxVEMP projects are described in this RFGA. Note that for TxVEMP, this RFGA covers only marine and locomotive projects operating in the priority areas referenced in Appendix B. Additional projects are eligible under ERIG and will be fully described below.

Applicants applying for marine or locomotive projects meeting the eligibility requirements under both ERIG and TxVEMP may submit project applications under both programs. TCEQ will review and evaluate both applications but will only award a single grant under either ERIG or TxVEMP.

2.0 Purpose

The ERIG program provides financial incentives to repower or replace older locomotives, marine vessels, stationary equipment, and select non-road equipment in order to reduce nitrogen oxides (NOX) emissions in nonattainment areas and affected counties in Texas. The ERIG program is established under Texas Health and Safety Code (THSC), Chapter 386, Subchapter C, to implement a portion of TERP. Rules for the program have been adopted by TCEQ in Title 30 Texas Administrative Code, Chapter 114 (30 TAC 114), Subchapter K, Division 3. TCEQ has also adopted the Texas Emissions Reduction Plan: Guidelines for Emissions Reduction Incentive Grants (ERIG Guidelines, August 2020), which contain more specific standards governing this program.

This RFGA also implements a portion of TxVEMP. TxVEMP is established and administered by TCEQ and subject to the requirements of the Environmental Mitigation Trust Agreement for State Beneficiaries (Trust Agreement) and the Beneficiary Mitigation Plan for Texas (RG-537). The ferry, tug, and switcher grant program provide financial incentives to repower or replace older locomotive freight switchers and repower marine ferries or tugs in order to reduce NOX emissions in priority areas in Texas. Non-governmental entities applying under TxVEMP will be limited to replacement or repower projects that are all electric. Visit the TxVEMP website for more information on the background and purpose of the TxVEMP.

3.0 Eligible Applicants

All applicants must meet the eligibility requirements listed in this section at the time of application submittal to be considered for a grant.

a) Eligible applicants are individuals, state and local governments, corporations, or any other legal entity. This may include a corporation headquartered outside of the state of Texas that operates equipment primarily in an eligible county in Texas (See Appendix A and B).

b) All business entities such as corporations or partnerships must have an active registration with the Texas Secretary of State by the program opening date listed on the cover page of this RFGA. If awarded a contract, businesses must maintain an active registration throughout the contract period.

c) Applicants must disclose any known apparent, potential, or actual conflicts of interest to TCEQ in writing at the time the application is submitted. Businesses or other entities may be prohibited from receiving a grant if a TCEQ employee, spouse, or family member of a TCEQ employee has a direct or indirect interest, financial or otherwise, depending upon the nature of the interest.

https://texreg.sos.state.tx.us/public/readtac$ext.ViewTAC?tac_view=5&ti=30&pt=1&ch=114&sch=K&div=3&rl=Y https://texreg.sos.state.tx.us/public/readtac$ext.ViewTAC?tac_view=5&ti=30&pt=1&ch=114&sch=K&div=3&rl=Y https://www.tceq.texas.gov/downloads/air-quality/terp/publications/rg/rg-388.pdf https://www.tceq.texas.gov/agency/trust/about https://www.tceq.texas.gov/agency/trust/about https://www.tceq.texas.gov/agency/trust/about

4.0 ERIG Program Requirements

All activities must meet the eligibility requirements listed in this section at the time of application submittal to be considered for a grant.

TCEQ may waive the ownership and use requirements of this section upon a finding of good cause.

Applicants must submit waiver requests with the application to be considered. Please refer to Appendix C for instructions on completing and submitting a waiver request.

4.1 Eligible Project Categories

a) Replacement or repower emissions-reducing projects are eligible under ERIG for the categories listed below. A repower project refers to the replacement or upgrade of the engine on an existing piece of equipment with a new, rebuilt, or remanufactured engine.

1) Limited, specific non-road equipment or stationary equipment;

2) marine vessels; and

3) locomotives.

b) General information, definitions, and criteria for eligible activities are available in the ERIG Guidelines. This RFGA may contain additional requirements that apply to this application period. Potential applicants should review this RFGA, the ERIG Guidelines, and the application forms.

4.1.1 Non-Road or Stationary Equipment

Stationary equipment includes equipment used in non-mobile applications that converts fuel into mechanical motion, including turbines and other internal combustion devices. Stationary equipment is used either in a fixed application or in a portable (i.e., transportable) application in which it stays at a single site for at least a full year (12 consecutive months).

Non-road equipment includes a piece of equipment, excluding a motor vehicle or on-road heavy-duty vehicle, powered by a non-road engine subject to the United States (US) Environmental Protection Agency (EPA) emission standards for non-road engines. Non-road equipment categories included in the 2024 Rebate Grants program are not eligible for funding under this ERIG grant round. See Appendix D for a list of these ineligible non-road equipment types.

To be eligible for replacement or repower, the old non-road or stationary equipment must:

a) be powered by an engine, turbine, or other internal combustion device that is 25 horsepower

(hp) or greater;

Note: This requirement refers to the horsepower of the engine being replaced only and does not apply to the replacement engine or technology.

b) have been continuously owned and operated by the applicant in Texas for at least the two years immediately preceding the application signature date;

c) currently be used in its primary function in the routine operations of the applicant;

d) have been used in its primary function in the routine operations of the applicant in Texas for the two years immediately preceding the application signature date; and

e) be in operating condition with at least five years of useful life remaining.

4.1.2 Marine Vessels

Marine vessels eligible under this program must have at least one propulsion engine that is subject to the EPA emission standards for marine vessels. Marine vessels may have more than one propulsion or auxiliary engine. This category does not include marine vessels that are subject to the EPA recreational marine vessel standards or are otherwise used for sport purposes.

To be eligible for replacement or repower, the old marine vessel must:

a) contain one or more propulsion or auxiliary engines that is 25 hp or greater. Only engines that are 25 hp or greater are eligible in the consideration for and calculation of any grant award;

Note: This requirement refers to the horsepower of the engine being replaced and does not apply to the replacement engine or technology.

b) have been continuously owned and operated by the applicant in Texas for at least the two years immediately preceding the application signature date;

c) currently be used in its primary function in the routine operations of the applicant;

d) have been used in its primary function in the routine operations of the applicant in Texas for the two years immediately preceding the application signature date;

e) be in operating condition with at least five years of useful life remaining;

f) currently be registered in the applicant’s name for operation in Texas, where required under Texas boating regulations; and

g) have United States Coast Guard (USCG) registration of the vessel (if applicable) in the applicant's name.

4.1.3 Locomotives

Locomotives include linehaul or switcher locomotives that are subject to the EPA emission standards for locomotives.

To be eligible for replacement or repower, the old locomotive must:

a) have been continuously owned and operated by the applicant in Texas for at least the two years immediately preceding the application signature date;

b) currently be used in its primary function in the routine operations of the applicant;

c) have been used in its primary function in the routine operations of the applicant in Texas for the two years immediately preceding the application signature date; and

d) be in operating condition with at least five years of useful life remaining.

4.2 Non-Road or Stationary Equipment Replacement Qualifications This category is for the replacement of non-road or stationary equipment with newer models.

a) The engine on the replacement equipment must be certified or verified to the EPA emissions standards for non-road engines or is otherwise authorized by applicable rule or air permit.

b) The engine on the replacement equipment must be certified to emit at least 25% less NOX compared with the engine being replaced. TCEQ requires “Certification” by either the EPA, the California Air Resources Board (CARB), or another entity that has been deemed acceptable by

TCEQ.

c) The engine on the replacement equipment must have an engine manufacture year no more than three years older than the calendar year in which it was purchased.

d) The replacement equipment must be of the same type and intended for use in the same application or vocation as the equipment being replaced. On a case-by-case basis, TCEQ may accept equipment of a different type to account for the latest technology or equipment type used for a specific vocation. In addition, TCEQ may allow a different number of engines on the replacement equipment compared to the old equipment if the new equipment will have the same use as the equipment being replaced and the emissions reductions can be adequately documented.

4.3 Non-Road or Stationary Equipment Repower Qualifications

This category is for the replacement of an existing engine on a piece of non-road or stationary equipment with a new, used, rebuilt, or remanufactured engine, or electric motors, drives, or fuel cells.

a) Repower projects may also include the:

1) retrofit (or add-on of emissions reduction technology) of an existing engine on a piece of non-road or stationary equipment; or

2) the upgrade of an existing engine on a piece of non-road or stationary equipment with an emissions upgrade kit certified by the EPA or CARB.

b) The replacement engine must be certified or verified to the EPA emissions standards for non-road engines or otherwise authorized by applicable rule or air permit.

c) Rebuilt or remanufactured engines must use only components from the original engine manufacturer (OEM) and be purchased from the OEM or its authorized reseller unless otherwise approved by TCEQ on a case-by-case-basis.

d) The replacement engine or upgrade kit must be certified to emit at least 25% less NOX than the engine being replaced or upgraded. TCEQ requires “Certification” by either the EPA, the CARB, or another entity that has been deemed acceptable by TCEQ.

e) The retrofit (or add-on of emissions reduction technology) must be verified to emit at least 25% less NOX than the engine prior to the retrofit or add-on. “Verification” means approval by the EPA, the CARB, or another entity that has been deemed acceptable by TCEQ.

f) The new, rebuilt, or remanufactured engine must have an engine manufacture year no more than three years older than the calendar year in which the engine was purchased.

4.4 Marine Vessel Replacement Qualifications

Replacement projects include the replacement of a marine vessel with a new or newer marine vessel.

a) The combined NOX emissions of the engines on the replacement vessel must be certified to be at least 25% less than the combined NOX emissions of the engines on the vessel being replaced, based on the emissions standard for those engines. TCEQ requires “Certification” by either the EPA, the CARB, or another entity that has been deemed acceptable by TCEQ.

b) The replacement vessel must be of the same type and intended for use in the same application or vocation (for example, tug, fireboat, pusher) as the vessel being replaced. TCEQ may accept a vessel of a different type to account for the latest technology or vessel type used for a specific vocation. In addition, TCEQ may allow a different number of engines on the replacement vessel compared to the old vessel if the new vessel will have the same use as the vessel being replaced and the emissions reductions can be adequately documented.

c) The engine(s) in the replacement vessel must have an engine manufacture year no more than three years older than the calendar year in which it was purchased.

4.5 Marine Vessel Repower Qualifications

Repower projects include the replacement of an existing engine on a marine vessel with a new, used, rebuilt, or remanufactured engine, or electric motors, drives, or fuel cells.

a) Repower projects may also include:

1) the retrofit (or add-on of emissions reduction technology) of an existing engine on a marine vessel;

2) the upgrade of an existing engine on a marine vessel with an emissions upgrade kit certified by the EPA or CARB; or

3) a marine engine low-NOX rebuild kit that results in a new engine family code or test group number being assigned by the EPA and a new emissions information label being affixed to the rebuilt engine, subject to TCEQ approval.

b) Rebuilt or remanufactured engines must use only components from the OEM and be purchased from the OEM or its authorized reseller unless otherwise approved by TCEQ on a case-by-case-basis.

c) The replacement engine or upgrade kit must be certified to emit at least 25% less NOX than the engine being replaced or upgraded. TCEQ requires “Certification” by either the EPA, the CARB, or another entity that has been deemed acceptable by TCEQ.

d) The retrofit (or add-on of emissions reduction technology) must be verified to emit at least 25% less NOX than the engine prior to the retrofit or add-on. “Verification” means approval by the EPA, the CARB, or another entity that has been deemed acceptable by TCEQ.

4.6 Locomotive Replacement Qualifications

This category is for the replacement of a locomotive with a new or newer locomotive. Replacement projects include maintaining the frame rails and wheels of the original locomotive.

a) The engine on the replacement locomotive must be certified to emit at least 25% less NOx (in other words, no more than 75% as much NOX) compared with the engine being replaced.

TCEQ requires “Certification” by either the EPA, the CARB, or another entity that has been deemed acceptable by TCEQ.

b) The replacement locomotive must be of the same locomotive type and be intended for the same or similar purpose as the locomotive being replaced. On a case-by-case basis, TCEQ may accept locomotives of a different type to account for the latest technology used for a specific vocation. In addition, TCEQ may allow a different number of engines on the replacement locomotive compared to the old locomotive if the new locomotive will have the same use as the locomotive being replaced and the emissions reductions can be adequately documented.

c) Replacement of a locomotive over 1,005 hp with a locomotive 1,005 or less hp may be considered by TCEQ, on a case-by-case basis, if it is shown that the design of the lower horsepower locomotive allows it to perform the same switcher functions that the higher horsepower locomotive was performing.

d) The engine in the replacement locomotive must have an engine manufacture year that is no more than three years older than the calendar year in which the locomotive is purchased.

4.7 Locomotive Repower Qualifications

This category is for the replacement of an existing engine on a locomotive with a new, rebuilt, or remanufactured engine, or one or more electric motors, drives, or fuel cells. Repower projects include only the replacement of the engine and all necessary associated drivetrain components.

a) Repower projects may also include:

1) the retrofit (or add-on of emissions reduction technology) of an existing engine on a locomotive; or

2) the upgrade of an existing engine on a locomotive with an emissions upgrade kit certified by the EPA or CARB.

b) Rebuilt or remanufactured engines must use only components from the OEM and be purchased from the OEM or its authorized dealers and distributors.

c) The replacement engine or upgrade kit must be certified to emit at least 25% less NOX than the engine being replaced or upgraded. TCEQ requires “Certification” by either the EPA, the CARB, or another entity that has been deemed acceptable by TCEQ.

d) The retrofit (or add-on of emissions reduction technology) must be verified to emit at least 25% less NOX than the engine prior to the retrofit or add-on. “Verification” means approval by the EPA, the CARB, or another entity that has been deemed acceptable by TCEQ.

4.8 Refueling Infrastructure

Applicants purchasing a qualifying select non-road or stationary piece of equipment, marine vessel, or locomotive powered by an alternative fuel may request additional funding for on-site refueling infrastructure.

a) Allowable alternative fuels are as follows:

1) Electricity

2) Hydrogen

3) Compressed Natural Gas (CNG)

4) Liquefied Natural Gas (LNG)

5) Propane (LPG)

6) Methanol

b) Applicants may only include one refueling infrastructure project site and one type of alternative fuel per application.

c) The refueling infrastructure must provide, at a minimum, refueling capacity to the non-road or stationary equipment, marine vessel, or locomotive replaced or repowered through this grant program.

d) Applicants may expand existing onsite refueling infrastructure to accommodate the additional new grant-funded equipment in lieu of installing new service.

e) Applicants are required to be the owner of the site where the refueling infrastructure equipment will be installed or be able to demonstrate the ability to install, operate, and maintain the refueling infrastructure at the proposed site for the duration of the contract. If an applicant does not own the property where the refueling infrastructure equipment will be installed, the Refueling Infrastructure Project Certifications under Section 7: Refueling Infrastructure (Optional) of the project application must be completed and signed by the property owner.

f) Applicants are required to be the owner of the refueling infrastructure equipment.

4.9 Operation of the Grant-Funded Equipment

a) At least 55% of the grant-funded equipment operation must occur in one or more of the nonattainment areas and affected counties (see Appendix A).

1) At the time of application, applicants may elect to increase this commitment up to a maximum of 95% of their operation in these same areas.

2) Higher usage commitments may increase the competitiveness of a project and will increase the maximum amount of grant funds that can be requested.

3) Usage is a binding commitment in any grant award.

b) For marine vessels, eligible operation must occur within eligible counties or within the coastal county lines of eligible counties which is approximately 3 leagues (10.35 miles) offshore.

Marine vessels may operate in the intercoastal waterways or bays adjacent to a nonattainment area or affected county in Texas. Operation in these intercoastal waterways or bays outside of eligible counties may be used to meet the 55% requirement but will not be considered in any emissions reduction calculations for scoring purposes.

c) Annual operation may be measured through miles traveled, hours of engine operation, or fuel consumed. For determining the total annual operation, only one type of measurement (e.g., miles traveled) can be used. Applicants receiving a grant must be prepared to keep and maintain records of their annual operation in the unit of measurement they choose on their application.

d) Refueling infrastructure must be owned, operated, and maintained for the duration of its annual usage reporting requirement as defined in Section 11.13 of this RFGA.

5.0 TxVEMP Program Requirements

All activities must meet the eligibility requirements listed in this section at the time of application submittal to be considered for a grant.

TCEQ may waive the ownership and use requirements of this section upon a finding of good cause.

Applicants must submit waiver requests with the application to be considered. Please refer to Appendix C for instructions on completing and submitting a waiver request.

5.1. Eligible Project Categories

a) The following emissions-reducing project categories are eligible under TxVEMP:

1) Repower of ferries and tugs; and

2) Replacement or repower of freight switchers.

b) General information, definitions, and criteria for eligible activities are available in the Trust Agreement and Beneficiary Mitigation Plan for Texas. This RFGA may contain additional requirements that apply to this application period. Potential applicants should review this RFGA, the Trust Agreement, Beneficiary Mitigation Plan for Texas, and the application forms.

5.1.1 Ferries and Tugs

A ferry includes any vessel that is being used to provide transportation only between places that are no more than 300 miles apart, and to transport only passengers, vehicles, or railroad cars which are being used, or have been used, in transporting passengers or goods.

A tug includes any dedicated vessels that push or pull other vessels in ports, harbors, and inland waterways (e.g., tugboats and towboats).

To be eligible for repower, the old ferry or tug must:

a) include unregulated, Tier 1, or Tier 2 marine engines;

b) be owned by the applicant at the time of application and have been continuously owned by the applicant for a minimum of two years immediately preceding the application signature date;

c) currently be used in its primary function in the routine operations of the applicant;

d) have been used in its primary function in the routine operations of the applicant in Texas for the two years immediately preceding the application signature date;

e) be in operating condition with at least five years of useful life remaining; and

f) currently be registered in the applicant’s name for operation in Texas, where required under Texas boating regulations. Any United States Coast Guard documentation of the vessel must also be in the applicant's name.

5.1.2 Freight Switchers

Freight switchers include locomotives that move rail cars within a rail yard as compared to a line-haul engine that moves freight long distances.

To be eligible for replacement or repower, the old freight switcher must:

a) be a pre-Tier 4 switcher locomotive that operates 1,000 or more hours per year;

b) be owned by the applicant at the time of application and have been continuously owned by the applicant for a minimum of two years immediately preceding the application signature date;

c) currently be used in its primary function in the routine operations of the applicant;

d) have been used in its primary function in the routine operations of the applicant in Texas for the two years immediately preceding the application signature date; and

e) be in operating condition with at least five years of useful life remaining.

5.2 Ferry and Tug Repower Qualifications

This category is for the replacement of an existing engine on a ferry or tug with a newer, cleaner engine or power source.

a) Government-owned ferries and tugs may be repowered with:

1) any new Tier 3 or Tier 4 diesel or alternative fuel engines;

2) with new all-electric engines; or

3) may be upgraded with an EPA Certified Remanufacture System or an EPA Verified Engine Upgrade.

b) Non-government-owned ferries and tugs must be repowered with new all-electric engines.

c) The engine in the repowered ferry or tug may not have a model year more than one year older than the calendar year in which it was purchased.

5.3 Freight Switcher Replacement and Repower Qualifications

a) Eligible government-owned freight switchers may:

1) be repowered with any new diesel or alternative fuel or all-electric engine(s) (including generator sets); or

2) be replaced with any new diesel or alternative fuel or all-electric (including generator sets) freight switcher.

The replacement or repowered freight switcher must be certified to meet the applicable EPA emissions standards as published in the Code of Federal Regulations for the engine model year in which the grant equipment is purchased.

b) Eligible non-government-owned freight switchers may:

1) be repowered with any new all-electric engine(s) (including generator sets); or

2) be replaced with any new all-electric (including generator sets) freight switcher.

c) The engine in the replacement or repowered freight switcher may not have a model year more than one year older than the calendar year in which it was purchased.

d) The replacement freight switcher must be of the same type and intended for the same use in the same application or vocation.

5.4 Electric Charging Infrastructure

Applicants purchasing a qualifying ferry, tug, or freight switcher powered by electricity may request additional funding for on-site electric charging infrastructure.

a) Applicants may only include one electric charging infrastructure project site per application.

b) The electric charging infrastructure must provide, at a minimum, refueling capacity to the ferries, tugs, or freight switchers replaced or repowered through this grant program.

c) Applicants may expand existing on-site charging infrastructure to accommodate the additional new grant-funded equipment in lieu of installing new service.

d) Applicants are required to be the owner of the site where the charging infrastructure equipment will be installed or be able to demonstrate the ability to install, operate, and maintain the charging infrastructure at the proposed site for the duration of the contract. If an applicant does not own the property where the charging infrastructure equipment will be installed, the Charging Infrastructure Project Certifications under Section 7: Refueling Infrastructure (Optional) of the project application must be completed and signed by the property owner.

e) Applicants are required to be the owner of the charging infrastructure equipment.

5.5 Operation of Grant Funded Equipment

a) At least 51% of the grant-funded equipment operation must occur in one of the priority area counties (see Appendix B).

1) At the time of application, applicants may elect to increase this commitment up to a maximum of 95% of their operation in these same areas.

2) Higher usage commitments may increase the competitiveness of a project and may increase the maximum amount of grant funds that can be requested.

3) Usage is a binding commitment in any grant award.

b) For marine vessels, eligible operation must occur within eligible counties or within the coastal county lines of eligible counties which is approximately 3 leagues (10.35 miles) offshore.

c) Annual operation will be considered as miles traveled, hours of engine operation, or fuel consumed. For determining the total annual operation, a single unit of measurement (e.g., miles traveled) must be used. Applicants receiving a grant should be prepared to keep and maintain records of their annual operation in the unit of measurement they choose on their application.

d) Charging infrastructure must be owned, operated, and maintained for the duration of its annual usage reporting requirement as defined in Section 11.13 of this RFGA.

6.0 Annual Usage Rates

Standard default annual usage rates are used by TCEQ to calculate the NOX emissions reductions that are achieved by each activity, and are measured either in miles, hours, or fuel use, depending on the equipment type. Annual usage rates are applied to each activity for the duration of the Activity Life.

a) Standard Usage

1) The applicant should identify the Standard Usage rate established for each type of equipment in the application’s technical supplement, and list it in the application.

2) The Standard Usage rate will be used for emissions reduction calculations only. The grant recipient will not be obligated to use the equipment for the exact number of annual miles, hours, or fuel use listed as the Standard Usage rate.

b) Non-Standard Usage

1) If a Standard Usage rate is not listed in the application’s technical supplement for a particular type of equipment, or if the applicant elects to apply using the historical annual usage rate (average annual use for the two years immediately preceding the application signature date), a Non-Standard Usage rate may be applied. TCEQ will consider non-standard usage on a case-by-case basis. Refer to Supplemental Form 2:

Non-Standard Annual Usage Rates for more information and to apply under this option.

c) Non-Standard Usage is not available for locomotive projects, which may be applied for only using a Standard Usage rate.

7.0 Marketable Emissions Reductions Credits Requirements

A project that would otherwise generate marketable credits under state or federal emissions reduction credit averaging, banking, or trading programs is not eligible for funding under the ERIG or TxVEMP program unless:

a) the project includes the transfer of the reductions that would otherwise be marketable credits to the state implementation plan, or to the project owner or operator as provided by THSC, Section 386.055; and

b) the reductions are permanently retired.

8.0 ERIG Available Funding and Grant Amounts

8.1 Available Funding

a) The total amount to be awarded under this RFGA will depend upon the amount of revenue received in the TERP Trust Fund but is initially anticipated to be $55 million.

b) Depending on demand and the requested grant amounts of eligible ERIG applications received, TCEQ may redistribute funds to best meet the purposes of ERIG and other TERP programs. This may include, but is not limited to, moving funds to another TERP grant program, or allocating additional funds to ERIG. Funding will not be redistributed between ERIG and TxVEMP programs.

8.2 Determining Eligible Grant Amounts

8.2.1 Replacement and Repower Projects

a) For replacement and repower projects, grant recipients may be eligible for reimbursement of up to 80% of the eligible incremental costs associated with the purchase or lease of the replacement equipment, not to exceed an incentive amount that results in a cost per ton (CPT) of NOX reduced as specified below:

1) Marine and Locomotive Projects: $20,000 CPT

2) Stationary Projects: $35,000 CPT

3) Non-Road Equipment Projects: $35,000 CPT

b) Individual activities submitted in a project application may exceed the cost per ton limits so long as the cost per ton of the overall project remains at or under the established cost per ton limitations associated with each project category.

8.2.2 Refueling Infrastructure Projects

a) Applicants may apply for refueling infrastructure associated with replacement or repower projects. Applicants will be reimbursed up to 50% of the eligible incremental cost of the refueling infrastructure project, not to exceed an incentive amount that results in an overall project CPT of NOX reduced as specified below:

1) Marine and Locomotive Projects with Infrastructure: $20,000 CPT

2) Stationary Projects with Infrastructure: $35,000 CPT

3) Non-Road Equipment Projects with Infrastructure: $35,000 CPT

b) For the purposes of determining if a project including refueling infrastructure meets these limits, the requested grant amount for the refueling infrastructure will be added to any other requested grant amounts in an application with no additional NOX emissions reductions. The overall CPT of the project cannot exceed the CPT limit.

9.0 TxVEMP Available Funding and Grant Amounts

9.1 Available Funding

a) The total amount to be awarded under this RFGA will depend upon the amount of funds available to TCEQ under the Trust Agreement but is initially anticipated to be $13 million.

b) Depending on demand and the requested grant amounts of eligible TxVEMP applications received, TCEQ may redistribute funds to best meet the purposes of TxVEMP. This may include, but is not limited to, moving funds to another TxVEMP grant program, or allocating additional funds to this TxVEMP solicitation. Funding will not be redistributed between TxVEMP and ERIG or other TERP programs.

9.2 Determining Eligible Grant Amounts

9.2.1 Replacement and Repower Projects

a) Governmental entities may request up to 100% of the incremental cost of an eligible replacement or repower project.

Governmental entities include a state or local government agency (including school district, municipality, city, county, special district, joint powers authority, or port authority owning fleets purchased with government funds), and a tribal government or native village. A federal government agency or entity is not included in this definition and will be considered a private entity for this grant program.

b) Non-governmental entities may request up to 75% of the incremental cost of an eligible all-electric replacement or repower project.

9.2.2 Charging Infrastructure

a) Applicants may apply for electric charging infrastructure associated with an eligible replacement or repower project.

b) Governmental entities may request up to 100% of the incremental cost of the charging infrastructure.

c) Non-governmental entities may request up to 75% of the incremental cost of the charging infrastructure.

10.0 Determining Eligible Costs

10.1 Incremental Costs

The incremental cost of any proposed project must be reduced by the value of any existing financial incentive that directly reduces the cost of the proposed project, including tax credits or deductions, other grants, or any other public financial assistance.

a) Replacement Projects for Non-Road Equipment

The incremental cost is the eligible cost to purchase the replacement equipment minus the scrap value of the equipment being replaced. TERP utilizes a default scrap value of $1,000.

b) Repower Projects for Non-Road Equipment

The incremental cost is the eligible cost to purchase and install the replacement engine and associated equipment, minus the scrap value of the old engine. TERP uses a default scrap value of $250.

c) Replacement Projects for Stationary Equipment, Marine Vessels, and Locomotives

The incremental cost is the eligible cost to purchase the replacement equipment minus the scrap value of the equipment being replaced. Applicants must submit documentation with the application to show the scrap value of the equipment being replaced.

d) Repower Projects for Stationary Equipment, Marine Vessels, and Locomotives

The incremental cost is the eligible cost to purchase and install the replacement engine and associated equipment minus the scrap value of the engine being replaced. Applicants must submit documentation with the application to show the scrap value of the equipment being replaced.

e) Refueling or Charging Infrastructure

The incremental cost is the eligible cost to purchase and install the refueling or charging infrastructure and associated equipment.

10.2 Eligible Costs

a) Eligible costs for replacement projects include:

1) cost(s) of the grant-funded equipment, i.e.:

• Invoice purchase price;

• Capital lease cost basis; or

• Sum of operating lease* payments over the contract’s Activity Life.

*A regular lease is not eligible for reimbursement under TxVEMP. The grant funded equipment must be purchased, or leased with the obligation to purchase and own the equipment.

2) taxes and government fees;

3) protective in-transit insurance;

4) delivery and shipping fees;

5) factory and/or extended warranties;

6) maintenance and service contracts;

7) mechanic and safety inspections;

8) cooperative fees;

9) manufacturer or dealer processing fees not related to financing; and

10) purchase and installation of a dedicated global positioning system (GPS) for tracking and monitoring the use of grant-funded equipment during the Activity Life.

b) Eligible costs for repower projects include:

1) cost of the new engine or upgrade, including sales tax, protective in-transit insurance, and delivery charges;

2) cost(s) of additional equipment that must be installed with the new engine or upgrade;

3) associated supplies directly related to the installation of the engine or system;

4) the cost to remove and dispose of the old engine, if applicable;

5) installation costs;

6) reengineering costs, if the equipment must be modified for the new engine to fit (including technical design, testing, and other engineering services required as part of the installation); and

7) other ancillary costs, which include shipping costs, factory and/or extended warranties, mechanic and safety inspections, cooperative fees, and dealer or manufacturer fees.

c) Eligible Costs for Refueling or Charging Infrastructure include:

1) Equipment includes tangible personal property having a unit acquisition cost of $5,000 or more (including sales tax and delivery) with an estimated useful life of over one year. Equipment purchased with grant funds should be budgeted as equipment if the sum of the separate component parts (including tax and delivery) has an original value of $5,000 or more. TCEQ will require an itemized invoice and proof of payment for reimbursement of all equipment costs.

• Eligible equipment costs for natural gas and alternative fuel dispensing equipment include natural gas and alternative fuel storage tanks, compressors, electrical infrastructure, and other equipment at the facility directly needed to store and dispense eligible alternative fuels.

• Eligible equipment-related costs include contractual costs, and supplies and non-capital items necessary for the installation of the equipment.

2) Supplies and Materials includes non-construction related costs for goods and materials having a unit acquisition cost (including sales tax and delivery) of less than $5,000 per unit. An itemized invoice and proof of payment will be required for reimbursement of all supplies and materials costs.

3) Construction includes the costs for the enhancement or building of permanent facilities. Construction costs include:

• Planning, designing, and engineering;

• Materials and labor;

• Subcontracts for services in connection with the construction; and

• Facility improvements, such as paving, foundations, and covers.

4) Contractual includes non-construction related costs for subcontracted or hired out professional services or tasks provided by a firm or individual who is not employed by the applicant. List each subcontractor/consultant separately.

10.3 Ineligible Costs

Ineligible costs include, but are not limited to:

a) Insurance premiums;

b) Finance fees and charges;

c) Salaries and travel expenses for employees of the grantee;

d) Expenses of any lobbyist registered in Texas;

e) Costs associated with the preparation and submission of the grant application;

f) Administrative costs of the grantee, including overhead and indirect costs (e.g., office supplies, rent, marketing, and advertising);

g) Costs that do not involve an arm’s-length transaction, such as the use of existing inventory without a proof of purchase or a transaction with a related business affiliate;

1) Transactions between related businesses (subsidiary, sister, or parent companies) are not considered arm’s length transactions, but indicate a potential conflict of interest.

TCEQ will consider costs between business affiliates ineligible unless sufficient documentation is provided demonstrating that procedures were in place to mitigate any conflict of interest. Grantees should seek approval from TCEQ prior to incurring and paying expenses of this nature;

h) Food and drink; and

i) Any costs incurred prior to the opening of the grant round.

Grant funds must be spent consistent with all applicable cost principles from 30 TAC 14.10 and the Texas Grant Management Standards (TxGMS). TxGMS documents are available on the Texas Comptroller of Public Accounts website.

11.0 Grant Application and Administration

11.1 Application Forms

a) The application and this RFGA may be downloaded from the TCEQ website at terpgrants.org or www.txvwfund.org.

b) A Portable Document Format (PDF) version of the draft contract may be viewed and downloaded from the TCEQ website at terpgrants.org or www.txvwfund.org. The draft contract is for reference only and contains terms and conditions that are standard provisions for grants awarded under this program. Any requested changes to the draft contract must be submitted to TCEQ in writing at the time the application is submitted. However, the applicant further understands that TCEQ will not normally change the contract language in response to individual requests from grant recipients and is under no obligation to do so.

TCEQ reserves the right to modify the draft contract terms as necessary due to statutory https://comptroller.texas.gov/purchasing/grant-management/ https://comptroller.texas.gov/purchasing/grant-management/ https://www.tceq.texas.gov/airquality/terp/index.html rule, or policy changes. Modifications will be posted to the TCEQ website at terpgrants.org and www.txvwfund.org and the ESBD.

c) All applications for funding must be submitted by the application deadline listed on the cover of the RFGA. If an application is found to be incomplete, TCEQ will notify the applicant in writing and provide details about what is missing from the application. Applicants will be provided a deadline to submit the missing information to TCEQ. A complete application must include:

1) all pages of the application;

2) all required attachments;

3) applicant’s contact information;

4) all required signatures; and

5) all the information necessary for TCEQ to score and rank the project according to the scoring criteria listed in this RFGA.

d) TCEQ reserves the right to limit the award of more than $10 million to a single applicant per program. For the purposes of this limitation, an “applicant” includes an individual or business and all of its associated legal affiliates. At the sole discretion of TCEQ, this may include reducing the requested grant amount of one or more applications from an applicant.

e) Applicants may not submit more than 10 activities in a single application. If an applicant has more than 10 activities, additional applications may be submitted. Marine replacement or repower projects may not include activities for more than one vessel in a single application.

f) A project application may only include activities involving one type of emission source, project category, and Activity Life. Projects involving different emission sources, project categories, or activity lives must be applied for on separate applications.

g) Applicants will be required to submit documentation and photographs with the application to demonstrate the eligibility of the equipment being replaced or repowered, including color photographs of the equipment and its associated engine(s).

h) The applicant must provide proof of ownership, which may include a copy of the bill of sale, maintenance records, or in some cases a title.

i) Where required under Texas boating regulations, a marine vessel must currently be registered in the applicant’s name for operation in Texas. Any USCG documentation of the vessel must also be in the applicant’s name.

j) Applicants with projects that include refueling or charging infrastructure must provide documentation that includes:

1) a site plan (including a scaled map which could be a photograph, satellite map, drawing, or similar graphic of the proposed site) that shows the planning and design of the proposed facility (not just an arrow on a map). The site plan must:

• demonstrate how the locomotive, marine vessel, or equipment may access the proposed facility; and

• provide the location of the facility within the property and include any easements, set-back requirements, and property boundaries.

2) a demonstration of their ability to install, operate, and maintain the refueling infrastructure at the proposed site, such as property ownership records, lease agreements, or other legal agreements, that can show the following:

• the ability to complete any required construction on the proposed site; and

• the ability to operate on the proposed property for a length of time equal to the Activity Life of the grant-funded equipment.

k) Applicants must request TCEQ’s preauthorization of an alternative method of disposition for the equipment, and/or engine being replaced by completing Section 9 of the application. If approved, the alternative method of disposition will be included in the Special Conditions of the contract; otherwise, the standard methods described in Section 11.10 of this RFGA will be required.

l) Private consultants may be available to assist an applicant with completing and submitting an application. TCEQ neither encourages nor discourages the use of a consultant to assist with the application process. Consultants do not represent TCEQ, and TCEQ has no agreements where applications submitted by a particular consultant will receive more favorable treatment than other applications.

m) The applicant must indicate in the application if the application was prepared by a third-party (someone other than the applicant or an employee of an applicant). If a third-party prepares the application, the third-party must also sign the application and certify that the information provided in the application is true and correct and as represented to the third-party by the applicant.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .