ESBD_368984_1721425241097_bwd electric sow.docx
DOCX document 14 KB Posted
- Attached to
- FY25_bwd_wh_electrical
- Solicitation number
- FY25_bwd_wh_electrical
- Issued by
- Brown County, Texas
About this file
This document is a Scope of Work (SOW) for an electrical upgrade project at a secure correctional facility in Brownwood, Texas. The scope includes installing a new 50 kW diesel generator, a 200-amp Automatic Transfer Switch (ATS), and a new 42-space panel board. The contractor will be required to pour a concrete pad for the generator, build a fence around the generator, run new feeder conduits and copper wiring from the generator to the ATS and from the main panel to the new panel board, and connect new equipment like a walk-in freezer, cooler, and pallet lift. All work must comply with state and local codes per the National Electrical Code (NEC).
The related state and local contract opportunity is for the FY25 electrical upgrades at the Brownwood warehouse facility. The contract is open to bidders in the state of Texas. Pricing terms, funding sources, and other salient details are not provided in the SOW document.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_368984_1721425206702_bwd electrical ifb.doc | DOC document | |
| ESBD_368984_1721425278760_bwd warehouse floor plan.jpg | JPG image | |
| ESBD_368984_1721425301809_bwd warehouse photo.jpg | JPG image | |
| ESBD_368984_1721425278760_bwd warehouse floor plan.jpg | JPG image | |
| ESBD_368984_1721425241097_bwd electric sow.docx | DOCX document | |
| ESBD_368984_1721425206702_bwd electrical ifb.doc | DOC document | |
| ESBD_368984_1721425301809_bwd warehouse photo.jpg | JPG image |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Brownwood Electrical SOW
1. Install a 50 KW Diesel generator 120-208-volt 3 phase.
2. Install 200-amp ATS, ATS to be mounded next to new panel board in storage area.
3. Pour a concrete pad for generator. Pad must be per spec by manufacture instructions.
4. Run a feeder conduit and copper feeders from generator to ATS.
5. Build a fence per spec around generator with a walk gate, 6’ tall with 3 strands of barbwire at top 45 outward, also allow 4’ clearance around generator.
6. Run a feeder conduit and copper feeders from main panel to a 42-space panel board to be located in the storage area. Approximately 45’ away.
7. Run feeder conduits from new panel for a walk-in freezer, cooler, and pallet lift. Approximately 70’ to pallet lift from new panel.
8. Center lights in storage room will be disconnected from main panel and reconnected into new panel.
9. Please refer to building drawing or visit site for more details.
10. All wiring shall be copper.
11. Install disconnects for LOTO at each piece of equipment.
12. Generator will power new panel only.
13. All work shall meet all state and local codes per the NEC.