This document is an addendum to a solicitation issued by the Texas Department of Public Safety for the fabrication and installation of a steel canopy for the DPS Lubbock Office. The addendum provides answers to submitted questions, revises the Mandatory Pricing Schedule, extends the bid due date from August 12, 2024 to August 19, 2024, and includes a Mandatory Site Visit sign-in sheet. The solicitation covers the installation of a steel canopy, with options for a 16' x 73'-8" canopy extension, electrical service for lighting and power, asphalt paving, and removal and reinstallation of fencing to improve the feasibility of the canopy installation.
The Mandatory Pricing Schedule outlines the line items for the project, including the total project cost, add alternates, and unit pricing. The anticipated schedule of events includes a mandatory pre-bid site visit on July 25, 2024, the last day to submit written questions on July 30, 2024, and the bid due date of August 19, 2024. The contract award and start date are not specified in this document.
View the file
Other files
Show all 18
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ADDENDUM OF SOLICITATION
1. SOLICITATION NO.
405-24R0020719
2. ADDENDUM NO.
3. EFFECTIVE DATE
8/7/2024
4. ISSUED BY
Texas Department of Public Safety Procurement and Contract Services 5805 North Lamar Blvd. Bldg. A 1st floor Austin, Texas 78752
5. NAME AND ADDRESS OF OFFEROR
6. The above numbered solicitation is amended as set forth in Item 7. The hour and date specified for receipt of Offers is extended, is not extended.
Offers must acknowledge receipt of this addendum prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing Items 5 and 8, and returning 3 copies of the addendum; (b) By acknowledging receipt of this addendum on each copy of the offer submitted; or (c) By separate letter or e-mail which includes a reference to the solicitation and addendum numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by e-mail or letter, provided each e-mail or letter makes reference to the solicitation and this addendum, and is received prior to the opening hour and date specified.
7. DESCRIPTION OF ADDENDUM
Addendum One (1) to:
1. Provide answers to submitted questions,
2. Revise the Mandatory Pricing Schedule,
3. Extend the Bid Due Date from 5:00 PM 8/12/2024 to 5:00 PM on 8/19/2024,
4. And to provide Mandatory Site Visit sign in sheet.
Except as provided herein, all terms and conditions of the solicitation, as heretofore changed, remain unchanged and in full force and effect.
8a. NAME AND TITLE OF SIGNER (Type or Print)
8b. OFFEROR
(Signature of Person Authorized to Sign) Date Signed
Questions and Answers:
1. Would you please send me the pre-bid meeting attendees list for the "Fabrication and
Installation - Impound Lot Canopy - Department of Public Safety" project?
a. Please see Mandatory Site Visit sign in sheet attached to this Addendum.
2. At Lines 2 & 3 it is showing exterior wall panels on both walls but only 6" space between. One wall could be installed first before the steel on the other wall is erected but once the first wall is installed it is going to be dang near impossible to get the second set of wall sheets installed. How do you want to handle this?
a. Shift girts at these two grids inward to be flush with frame flange. Increase the dimension between grids by 6”. This will result in a 2’-4” dimension between grids. These two adjustments will allow more room to install the panels.
3. At the same FL 2-3 does this need to remain to separate Canopies or can it be combined into 1 and make a common frame at that location?
a. It is acceptable to combine the two canopies to one canopy. If that does occur ignore the answer to question 2 above.
4. Can X-bracing to the ground be utilized at the Low Side Wall to the ground for lateral bracing?
a. X-bracing to the ground is permitted.
5. Will the fence be removed during Construction?
a. The fencing is not planned to be removed. If removing a section of fence is going to improve the feasibility of the installation, feel free to include removal and installation as Add Alternate 4 in your bid.
6. Do inground junction boxes, stub up and electrical room or does building have to be penetrated?
a. Drawings included in the Statement of Work indicate for a new underground conduit run, from new canopy to existing building. In ground junction boxes will need to be provided as required for new run and contractor will need to penetrate building for new conduit entrance. If existing vault has room and is accessible to be used for new conduit entrance, then that is acceptable
7. Is aluminum service wire acceptable for the new panel or is copper required?
a. Please refer to Statement of Work section 26 05 13, Building Wire and Cable for acceptable wire.
B.4 MANDATORY PRICING SCHEDULE
Respondent must submit pricing within the Pricing Schedule Exhibit replicating, as necessary, in this exact format.
LINE
ITEM DESCRIPTION QTY UOM UNIT PRICE
1 Total Project Cost 1 JOB
2 Add Alternate 1: 16’ x 73’-8” canopy extension. 1 JOB
3 Add Alternate 2: Electrical service for lighting and power.
1 JOB
4 Add Alternate 3A: Asphalt paving below base bid canopy.
1 JOB
5 Add Alternate 3B: Asphalt paving below 16’ x 73’-8” canopy extension.
1 JOB
6 Add Alternate 4: Removal and Re-installation of fencing to improve the feasibility of the Canopy Installation.
1 JOB
D.11 ANTICIPATED SCHEDULE OF EVENTS
DPS currently anticipates that the selection of successful Bidder and award of this Contract, if any, will proceed according to the following schedule:
7/19/2024 Solicitation Posted to ESBD 7/25/2024 11:00 AM CT Mandatory Pre-Bid Site Visit
7/30/2024 5:00 PM CT Last day to submit written questions for clarification to DPS
8/1/2024 8/7/2024 5:00 PM CT Estimated date for DPS to post Question and
Answer (Q&A) document to ESBD 8/12/2024 8/19/2024 5:00 PM CT Deadline for DPS to receive Bids
DPS reserves the right, in its sole discretion, to change the above date(s). Notices of changes to items directly impacting the original solicitation process will be posted on the Electronic State Business Daily (ESBD) located at: http://www.txsmartbuy.com/esbd. Bidder should check the ESBD frequently for updates. Bidder is solely responsible for verifying receipt of its questions, if applicable, and responding by the deadlines stated. A Bidder’s failure to periodically check the ESBD for updates will in no way release the awarded Bidder from compliance with any requirements in posted “addenda or additional information” although such compliance may result in additional costs to meet the requirements.
Questions regarding this solicitation must be in writing and must be submitted to DPS’s Contract Administrator by the date and time noted in the table listed in this solicitation.
Telephone inquiries will not be accepted. Questions may only be submitted email. DPS intends to post answers to these questions on the ESBD on or before the date and time noted in the table listed in this solicitation. Bidder is solely responsible for verifying DPS’s timely receipt of its questions by the stated deadlines.
http://www.txsmartbuy.com/esbd
| SOLADD_1_405-24R0020719_909-22_old |
| B.4 MANDATORY PRICING SCHEDULE |
| D.11 ANTICIPATED SCHEDULE OF EVENTS |
PCONFSIS_405-24R0020719_909-22