This document is an Addendum to the Request for Bids (RFB) 2024-023 for the WMARSS Central WWTP Digester Cleaning and Improvements project, issued by the City of Waco, Texas. The project generally consists of the removal, screening, and disposal of accumulated digester contents, washing of tank walls and piping, replacement of the floating gasholder cover, plug valves, and digester gas piping modifications. Prequalification is required to bid on the project, with a non-mandatory pre-submittal meeting scheduled for July 10, 2024, at 2:00 P.M. Central Time. The bid closing date is August 22, 2024, at 2:00 P.M. Central Time, with bids to be submitted via Zoom and dial-in. The addendum provides responses to questions received, revisions to the contract documents and technical specifications, and updates to the project deadlines.
The addendum clarifies pricing terms, such as the contractor being responsible for tracking landfilled solid waste, with the City paying the associated tipping fees. It also confirms that this project is funded with local funds and is not subject to the Buy American or American Iron and Steel requirements. The addendum further provides details on the tank wall elevations, operating pressure ranges, and pressure relief valve settings for the digester cover design.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Purchasing Services Post Office Box 2570
Waco, Texas 76702-2570 Phone: 254-750-8098
Fax: 254-750-8063 melaniew@wacotx.gov
CITY OF WACO www.waco-texas.com
Date: 07/01/2024
RFB No: 2024-023 Commodity: WMARSS Central WWTP Digester Cleaning and Improvements Purchasing Agent: Melanie Wade
Closing Time: 2:00 P.M. CST, Thursday, August 22, 2024 Opening Time: 2:01 P.M. CST, Thursday, August 22, 2024
RFB Opening Location: Via Zoom and Dial In
Addendum No: 1
The above-mentioned RFB invitation has been changed in the following manner. Sign and return addendum to the Purchasing Office by the closing time and date with your RFB response. Returning this page signed by your authorized agent will serve to acknowledge this change. All other requirements of the invitation remain unchanged. If you have any questions, please call or stop by the Purchasing Office at the above address.
1. The following pages have revisions to the bidding process and deadlines, answers to questions asked, and revisions to the technical specifications. Please review and note the changes. Bids are to reflect these revisions.
2. An updated Zoom information sheet is attached. This replaces page 3 of the original bid package.
Firm:
Address
Signature of Person Authorized to Sign Bid:
Signor's Name and Title (print or type):
E-mail Address:
Date: Telephone: Fax:
mailto:melaniew@wacotx.gov http://www.waco-texas.com/
New Project Deadlines
Non-Mandatory Pre-Submittal Meeting, 2:00 p.m. CT Wednesday, July 10, 2024 Prequalification Submittals due by 5:00 p.m. CT Wednesday, July 17, 2024 Prequalification Review Period Wednesday, July 17, 2024 – Wednesday, July 24, 2024 Contractors notified of Prequalification Submittal Status (pass/fail)
Thursday, July 25, 2024
Complete Review of Contractor’s Fail Status – only if contractor provides a written request for said review
Thursday, August 1, 2024
Deadline for Questions, 5:00 p.m. CT Tuesday, August 13, 2024 Bid Closes, 2:00 p.m. CT Thursday, August 22, 2024 Bid Opening, 2:01 p.m. CT – Via Zoom and Dial In Thursday, August 22, 2024
CONTRACT DOCUMENTS AND TECHNICAL SPECIFICATIONS
CITY OF WACO
WACO METROPOLITAN AREA REGIONAL SEWERAGE SYSTEM
CENTRAL WASTEWATER TREATMENT PLANT DIGESTER CLEANING AND
IMPROVEMENTS PROJECT
ADDENDUM NO. 1
Date Issued: July 1, 2024
Prepared by Allen Woelke, PE 54386
CDM Smith Inc Texas Registration No. F-3043
Bidders on this project are hereby notified that this addendum shall be attached to and made a part of the above named Contract Documents and Technical Specifications, dated Friday April 26, 2024.
The following items are issued to add to, modify, and clarify the Contract Documents and Technical Specifications and Drawings. These items shall have full force and effect as the Contract Documents and Technical Specifications, and cost involved shall be included in bid prices. Bids to be submitted on the specific bid date shall conform to the additions and revisions listed herein.
Acknowledge receipt of this addendum by designating receipt of the addendum on the first page of the Bid Proposal. Failure to do so may subject bidder to disqualification.
RESPONSES TO QUESTIONS RECEIVED:
1. Spec 09 96 11 High performance Coatings - 3.6C2 call for coating on interior and exterior digester covers. Spec 467317 Digester Covers 3.1 A Calls for silicone coating or polyurethane foam. 3.1D calls for foam insulation and silicone coating above the domed tops of digesters.
2.4 11- calls for heat trace and 1" thick FRP jacket on PRV and flame arresters. I cannot find spec for these materials or notes on plans if these are required. Please confirm and clarify use and type of material.
Response: Provide coatings as detailed in Section 099676.33 paragraph 3.6.C. 1-inch FRP jacket on PRVs are required, Section 467317 paragraph 2.4.G.11 details the material of construction as “silicon impregnated woven glass cloth lining with a one-inch thick, six-pound density fiber glass insulating material”
2. The owner or engineer has software system. Spec requires contractor to purchase system for 7 license users. Is the contractor required to purchase website management software for this project?
Response: The contractor is to purchase one license of the software. This will allow multiple users access, but not all at the same time.
3. Apparently, the corbel elevations for tanks 1A&2A are different from the corbel elevations for tanks 3A & B. We need confirmation of the top of the tank wall elevation and the corbel elevation for the tank we are to design the gasholder cover (Digester B).
Response: The top of tank elevation for Digester B is EL 396.00, and the top of corbel elevation is EL 380.875 ft as shown on drawings D-4 and M-3, respectively.
4. Please clarify if AIS or BABA requirements apply.
Response: This is not a BABA or AIS project. It is funded with local funds that do not have these federal requirements.
5. Confirm if prices should be valid until September 2024, as stated on RFP pages 6 and 15.
Response: Per page 6, the final decision will be made, and submitters notified by October 2024. Per page 15, the bids are to be valid for 90 days after the bids have been opened.
6. Note that there is a discrepancy in total side sheet length between sections 2.3 C 5 and 2.3 F 3.
Confirm the required length.
Response: The required side sheet length is 13.83 ft.
7. Clarify the operating pressure for storing 65,800 ft3 of gas, as sections 2.3 C 7 & 10 are unclear. Confirm the PRVB relief and escape pressures on page 9 of the specification for cover design purposes.
Response: The normal operating pressure range of Digester B is 8.5-10 in w.c. The PRVB relief and escape pressures should be set at 12 in w.c.
8. Confirm if the listed 304SS vertical slide guide MOC applies to both: the guide (mounted on the tank) and slider (mounted on the cover) or if a standard MOC can be used for the slide guide (HDG).
Response: Provide 304SS for both the guide and slider.
REVISIONS TO CONTRACT DOCUMENTS AND TECHNICAL
SPECIFICATIONS
SECTION 011000 – SUMMARY OF WORK
a) Page 011000-2, Add the following paragraph after paragraph 1.5.E.1, and renumber the numbered list from 1.5.E.2-1.5.E.5 accordingly:
“2. If damage is found during the Engineer’s inspection, perform work necessary to repair structural damage to the digester.”
b) Page 011000-2, Page 011000-2, Add the following paragraph after paragraph 1.5.F.2, and renumber the numbered list from 1.5.F.3-1.5.F.8 accordingly:
“3. If damage is found during the Engineer’s inspection, perform work necessary to repair structural damage to the digester.”
SECTION 015000 – TEMPORARY FACILITIES AND CONTROLS
a) Page 015000-1, Revise paragraph 1.3.C., “Meter water and non-potable water usage throughout the project. Owner will pay water-service use charges for water used by all entities for construction operations."
b) Page 015000-1, Add paragraph 1.3.G.:
“G. Landfill Service: Track weight of landfilled solid waste. Owner will pay for landfill tipping fees at the City owned landfill site.”
SECTION 460200 – TANK AND STRUCTURE CLEANING
a) Page 460200-4, Delete paragraph 1.6.B.
b) Page 460200-4, Amend the following to the end of paragraph 1.6.F. “Set up an account under the City’s solid waste department to transport waste materials for this Work. Owner will pay the required landfill tipping fees.”
c) Page 460200-7, Add paragraphs 3.3.J and 3.3.K:
“J. Provide adequate explosion-proof lighting for the inspection that meets OSHA Standard
1926.56 at minimum.
K. Provide a way for inspector to check the entire wall, including the portions of the tank wall that would typically be covered by the digester cover side skirt.”
SECTION 467317 – FLOATING GASHOLDER DIGESTER COVERS
a) Page 467317-6, Revise paragraph 2.3.C.7, “Installed weight of the cover, including the roof, all appurtenances, insulation and required ballast shall be sufficient to provide Internal Operating Gas Pressure at 12 inches water column.”
b) Page 467317-7, Revise paragraph 2.3.F.3, “Side sheets for the cover shall extend from the roof plates to a depth of 13.83 feet maximum. Side sheets shall consist of ¼-inch plates with reinforcing members adequate to support the weight of the cover and live, snow, and vacuum loads”.
c) Page 497317-9, Revise paragraph 2.4.G.5, “Pressure relief: Set at 12-inch w.c. with 25-percent allowable overpressure. Minimum pressure relieving capacity of 19,000 SCFH at 15-in w.c.
Pressure setting must be adjustable 8.5-in to 10-in w.c. range to provide weights in ½-inch increments. Emergency vent shall have a maximum leakage rate of 1 SCFH at 90% of set pressure point.”
d) Page 467317-12, Delete paragraph 3.1.A and subparagraphs 3.1.A.1 though 7, in their entirety.
e) Page 467317-12, Revise paragraph 3.1.B, “Furnish and install all wall pipes, pipe sleeves, inserts, anchor bolts as required to install the digester covers after each digester tank has been cleaned.”
f) Page 467317-12, Delete paragraph 3.1.D.5.
REVISIONS TO DRAWINGS
N/A
END OF ADDENDUM NO. 1
BID NUMBER:
DATE:
TIME: CENTRAL
QUICK LINK:
MEETING ID:
DIAL IN NUMBER:
PASS CODE:
ADDITONAL
INFORMATION:
BID NUMBER:
DATE:
TIME: CENTRAL
QUICK LINK:
MEETING ID:
DIAL IN NUMBER:
PASS CODE:
ADDITONAL
INFORMATION:
PRE BID/ PROPOSAL
BID/ PROPOSAL OPENING
ZOOM ACCESS INSTRUCTIONS & ADDITIONAL INFORMATION
Rev. 1 https://wacotx.zoomgov.com/j/1608488889?
| ZOOM Info. FORM Rev 1.pdf |
| Sheet1 |
| BID NUMBER: RFB 2024-023 |
| MM/DD/YY: 07/10/24 |
| TIME CENTRAL: 2:00 P.M. (CT) |
| QUICK LINK: |
| MEETING ID: |
| DIAL IN NUMBER: |
| PASS CODE: |
| FREE COMMENT TEXT: Non-Mandatory Pre-Submittal Meeting |
WMARSS, 1147 Treatment Plant Rd., Waco, TX 76706
| BID NUMBER_2: RFB 2024-023 |
| MM/DD/YY2: 08/22/24 |
| TIME CENTRAL: 2:00 P.M. (CT) |
| QUICK LINK_2: https://wacotx.zoomgov.com/j/1608488889? |
| MEETING ID_2: 160 848 8889 |
| DIAL IN NUMBER_2: 1 551 285 1373 |
| PASS CODE_2: 559323 |
| FREE COMMENT TEXT_2: Via Zoom and Dial In |