This document is an Addendum for the solicitation MR11493 issued by the Texas Parks and Wildlife Department (TPWD) for the Mother Neff State Park Headquarters (HQ) HVAC Renovation project. The addendum addresses questions and answers, revisions to the bid schedule, and changes to the drawings. Key details include that factory startup for the 7 carrier units is required, third-party commissioning is not required, and a certified test and balance contractor will be needed. The addendum also notes that the HQ building will remain partially open during the replacement process, and partnering with a local HVAC contractor is allowed. The bid due date is June 11, 2024, at 2:00 PM. A pre-bid meeting was held on May 2, 2024.
The revised bid schedule includes an owner's allowance for temporary cooling during the HVAC replacement, if necessary. The addendum also provides details on the replacement and reuse of electrical conduits, breakers, and copper piping for the various HVAC systems. Respondents are advised to check the Comptroller's website for any further updates, addenda, and proposal opening date changes.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Texas Parks and Wildlife Department Infrastructure Division
4200 Smith School Road Austin, Texas 78744
ADDENDUM
Addendum Number: 03 Dated: 05/31/2024
Solicitation Number: MR11493
Solicitation Title: Mother Neff State Park Headquarters (HQ) Renovation
Due Date/Deadline: June 11, 2024, at 2:00 PM
Contract Manager: Misty K. Wyatt, CTCD, CTCM
PURPOSE OF ADDENDUM: Address Questions and Answers, Revisions to Bid Schedule and Drawings
Except as provided herein, all terms and conditions of the document referenced herein, remain unchanged and in full force and effect. The following are official revisions, specifications and/or clarifications to this solicitation.
This Addendum shall be attached to and form a part of the referenced solicitation document and any resulting awarded contract and must be considered in your response.
Respondents are advised to check for updates, addenda issuance, and proposal opening date changes through the Comptroller’s website under Electronic State Business Daily (ESBD) at https://www.txsmartbuy.com/esbd.
Questions and Answers
Q1: Would you please post the Prebid Sign in Sheet?
A1: As the Pre-Bid Conference was not mandatory, a sign-in sheet will not be posted.
Q2: ARE FACTORY START UPS REQUIRED?
A2: Factory startup for the (7) carrier units are required.
Q3: WILL THIS PROJECT REQUIRE A 3RD PARTY COMMISSIONING TEST? IF SO, PLEASE DESCRIBE THE
NATURE OF THE TEST TO BE PERFORMED.
A3: Third party commissioning is not required for this size of project.
Q4: ONCE PROJECT IS AWARDED, IS TP&W PROJECT MGR GOING TO REQUIRE WEEKLY TEAMS
MEETING?
A4: Yes, there will be a weekly Teams meeting. In addition, one weekly meeting will be combined with the monthly progress meeting that is required to be on site versus TEAMS.
Q5: IS A CERTIFIED TEST AND BALANCE REQUIRED FOR THIS PROJECT?
A5: A certified Test and Balance contractor will be required to ensure diffusers are balanced as noted on the plans and that units are running as intended.
Q6: IS A TEMPORARY AC REQUIRED FOR THIS PROJECT? IF SO, PLEASE INDICATE TONNAGES, SIZE, AND VOLTAGES.
A6: The HQ will be open for business during the replacement process. Staggering the replacement of the units will allow for the building to remain partially conditioned. Refer to the revised Bid Schedule for Owner’s Allowance for temporary cooling, should it be necessary.
Addendum No. 3 Project Number: MR11493 Page 2 of 3
Addendum OF 113 (5/5/2022)
Q7: WHAT ARE THE BASES OF THE FIRE ALARM IN REGARD TO EXSISTING HVAC SYSTEM? PROVIDE
PREFERD AND OR LAST CONTRACTOR TO SERVICE FIRE ALARM SYSTEM.
A7: No fire alarm related work.
Q8: DUE TO CALL BACK AND OR SERVICE RESPONSE TIME, ARE WE ABLE TO PARTNER WITH A LOCAL
HVAC CONTRACTOR?
A8: Yes, partnering with a local HVAC contractor is allowed for maintenance and service requirements. Refer to qualification requirements per the Notice to Bidders.
Q9: CAN ELECTRICAL CONTRCATOR REUSED CONDUIT PIPE IS FEASABLE?
A9: Contractor to provide pricing for full replacement of electrical conduit.
Q10: CAN ELECTRICAL BREAKERS BE REUSED IF AMPS ARE CORRECT?
A10: Contractor to provide pricing for full replacement of existing circuits or as indicated on E1.0 demolition note 1.
Q11: IS EXSISTING COPPER TO BE REMOVED AND REPLACED?
A11: Existing copper is to be removed and replaced for FCU systems 2 through 8. FCU-1 piping shall be reused, reference Mechanical Drawings. New pipe to be ACR copper pipe per M1.0 & M2.0.
Q12: PLEASE ADVISE ON REPLACEMENT OF COPPER FOR SYSTEM 1 AND SYSTEM 2. NOTE, NO DIRECT
PATH DUE TO FLAT ROOF.
A12: System 1 or FCU-1 piping shall be reused, reference Mechanical drawings. System 2 or FCU-2 will require new ACR copper piping due to different pipe size requirements. Refer to Keyed Note 3 on M2.0 for directions on routing.
Q13: What is your anticipated start date?
A13: The start date will be determined during the Pre-Construction meeting with the awarded contractor.
Revisions to Bid Schedule
The Bid Scope in the Bid Portal has been revised as follows:
Added section for Owners Allowance for temporary cooling during HVAC replacement if required.
Revisions to Drawings
Delete Original Sheet 1 in Drawings issued in solicitation dated April 25, 2024, and replace with AD3 Sheet 1 dated May 29, 2024.
Delete Original Sheet 3 in Drawings issued in solicitation dated April 25, 2024, and replace with AD3 Sheet 3 dated May 29, 2024.
Delete Original Sheet 4 in Drawings issued in solicitation dated April 25, 2024, and replace with AD3 Sheet 4 dated May 29, 2024.
Delete Original Sheet 6 in Drawings issued in solicitation dated April 25, 2024, and replace with AD3 Sheet 6 dated May 29, 2024.
Addendum No. 3 Project Number: MR11493 Page 3 of 3
Addendum OF 113 (5/5/2022)
Delete Original Sheet 7 in Drawings issued in solicitation dated April 25, 2024, and replace with AD3 Sheet 7 dated May 29, 2024.
Respondents are to acknowledge receipt of this Addendum via the Bid Portal.