ES7034.pdf

PDF 10 KB Posted

Attached to
C17 FEC Part
Solicitation number
FA8213-26-R-3054
Issued by

About this file

This is a federal contract clause (ES7034) establishing requirements for rework and repair of nonconforming material, effective January 2012.

The clause defines rework as reprocessing nonconforming material to achieve complete conformance with drawings, specifications, or contract requirements, while repair involves reprocessing to reduce but not eliminate nonconformance, bringing material to a usable condition without full conformance. Contractors must document rework procedures with associated inspection procedures and submit them to the Government Quality Assurance Representative (QAR) for review prior to implementation; rework procedures are subject to QAR disapproval. Repair procedures must be documented and submitted on DD Form 1694 (Request for Deviation/Waiver) to the Contracting Officer for review and written approval before implementation. All submissions for repair or rework procedures must include descriptions of the cause for nonconformances and actions taken or planned to prevent recurrence. Rework and repair procedures must include provisions for reinspection that take precedence over Technical Data Package requirements and provide government assurance that reworked or repaired items meet reprocessing requirements. This clause applies as a supply chain flow-down requirement to contractors and their suppliers, vendors, and subcontractors.

View the file

Other files

File Type Posted
FA821326R3054.pdf PDF
AirSpec.pdf PDF
JFQR_MD61.docx DOCX document
Statement_of_Objectives_SOO.pdf PDF
FA821326R3054.pdf PDF
SPI_F016729909.pdf PDF
CDRLS.pdf PDF
SectionMCADPAD_26May2026.pdf PDF
ADC_SOW.pdf PDF
ItemMarkingInstruction.pdf PDF
SectionLCADPAD_26May2026.pdf PDF
ID_1377013915415.pdf PDF
REPSHIP.pdf PDF
SPI_F012552382.pdf PDF
SOW_Packaging.pdf PDF
ID_1377016729909.pdf PDF
Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for

Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the

Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)

(ES7034)

File details come from the government source that posted it. Updated .