ES7034.pdf
PDF 36 KB Posted
- Attached to
- Arm Fire Initiator Remanufacture
- Solicitation number
- FA821326R3030
About this file
This is a federal contract clause (ES7034) governing the rework and repair of nonconforming material for government contracts, effective January 2012.
The clause establishes definitions and procedural requirements for two distinct processes: rework, which involves reprocessing nonconforming material to achieve complete conformance with drawings, specifications, and contract requirements; and repair, which reprocesses nonconforming material using approved written procedures to reduce but not eliminate nonconformance, resulting in usable material that still does not fully meet all applicable requirements. Contractors must document rework procedures along with associated inspection procedures and submit them to the Government Quality Assurance Representative (QAR) for review prior to implementation, with rework procedures subject to the QAR's disapproval. Repair procedures require submission on a DD Form 1694 (Request for Deviation/Waiver) to the Contracting Officer for written approval before implementation. All submissions for repair or rework procedures must include a description of the cause of nonconformances and preventive actions taken or planned. Both rework and repair procedures must contain reinspection provisions that take precedence over Technical Data Package requirements and provide government assurance that items meet reprocessing requirements. The clause applies as a supply chain flow-down requirement to contractors and their suppliers, vendors, and subcontractors.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Solicitation.pdf | ||
| CADPAD Item Marking Instruction - Ver 1.6.pdf | ||
| Item_Description.pdf | ||
| REPSHIP.doc | DOC document | |
| SOW ADC.docx | DOCX document | |
| Appendix_A_SOW.docx | DOCX document | |
| CDRLs.pdf | ||
| Section M.pdf | ||
| Statement of Objectives.pdf | ||
| Section L.pdf | ||
| SPI.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 5
(ES7034)
REWORK AND REPAIR OF NONCONFORMING MATERIAL
Jan 2012 (version)
(a) Rework and Repair are defined as follows:
(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.
(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.
(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.
(c) Repair procedures shall be documented by the Contractor and submitted on a Request for
Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.
(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.
(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the
Government assurance that the reworked or repaired items have met reprocessing requirements.
(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.
(End of clause)