ES7034.pdf

PDF 10 KB Posted

Attached to
F-16 Initiators
Solicitation number
FA8213-26-R-3017
Issued by

About this file

This document is a federal contract clause (ES7034) addressing the rework and repair of nonconforming material, effective January 2012.

The clause establishes distinct processes for two categories of nonconforming material remediation. Rework involves reprocessing material to achieve complete conformance with drawings, specifications, and contract requirements, while repair reprocesses material to reduce but not eliminate nonconformance, bringing items to a usable condition without full compliance. Rework procedures and associated inspection procedures must be documented by the contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation, with procedures subject to QAR disapproval. Repair procedures require documentation on a DD Form 1694 (Request for Deviation/Waiver) and must be submitted to the Contracting Officer for written approval before implementation. Both rework and repair submissions must include a description of the cause for nonconformances and preventive actions taken or planned to prevent recurrence. Each procedure must contain reinspection provisions that take precedence over Technical Data Package requirements and provide Government assurance that reworked or repaired items meet reprocessing requirements. The clause applies as a supply chain flow-down requirement to contractors and their suppliers, vendors, and subcontractors.

View the file

Other files

File Type Posted
FA821326R3017_______0001.pdf PDF
DeliveryDetails.xlsx XLSX spreadsheet
FA821326R3017.pdf PDF
SPI_7161.pdf PDF
Section L CADPAD 29 April 2026.pdf PDF
SPI_6621.pdf PDF
ItemMarkingInstruction.pdf PDF
SOW_Packaging.pdf PDF
ADC_SOW.docx DOCX document
JFQR.pdf PDF
Section M CADPAD 29 April 2026.pdf PDF
REPSHIP.pdf PDF
EDL.pdf PDF
DeliveryDetails.xlsx XLSX spreadsheet
CDRL.pdf PDF
Statement_of_Objectives_SOO.pdf PDF
AirSpec.docx DOCX document
ItemDescriptionCombined.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for

Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the

Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)

(ES7034)