About this file

This document contains a federal contract solicitation for cabin decompression sensors, hatch remover cartridges, and time delay initiators for the B-1 aircraft. The solicitation was issued by the Department of the Air Force Materiel Command Lifecycle Management Center located at Hill Air Force Base. Interested vendors must submit quotes by email to the points of contact no later than 5pm MST on June 30, 2023. The solicitation seeks these products to support the B-1 aircraft.

View the file

Other files

File Type Posted
JFQR.pdf PDF
AIR SPEC 27 Mar 2023.pdf PDF
Item Descriptions.pdf PDF
CADPAD Item Marking Instruction - Ver 1.6.pdf PDF
SPIs Combined.pdf PDF
CDRLs.pdf PDF
EDLs.pdf PDF
ADC SOW Jan 2018.pdf PDF
REPSHIP 11 Mar 14.pdf PDF
SOW.pdf PDF
Solicitation.pdf PDF
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

i(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)

(ES7034)

File details come from the government source that posted it. Updated .