ES7034.pdf

PDF 10 KB Posted

Attached to
UWARS Battery Kits
Solicitation number
FA8213-25-R-3010
Issued by

About this file

This document is a federal contract clause titled "Rework and Repair of Nonconforming Material" dated January 2012. The clause defines and provides detailed procedures for addressing nonconforming materials during contract performance, with two primary categories: rework and repair. Rework involves completely reprocessing nonconforming material to meet all contract requirements, while repair involves partially addressing nonconformances to bring material into a usable condition without fully meeting all original specifications.

The clause outlines specific administrative requirements for contractors, including documenting and submitting rework and repair procedures to government representatives for review and approval. Contractors must provide detailed documentation including the cause of nonconformances and preventive actions. The requirements apply across the entire supply chain, including contractors, suppliers, vendors, and subcontractors. Each procedure must include a reinspection provision that takes precedence over standard technical data package requirements and provides government assurance that reprocessed items meet necessary standards.

View the file

Other files

File Type Posted
REPSHIP.pdf PDF
CDRLS 25-50019_25-50020.pdf PDF
CADPAD Item Marking Instruction Ver 1.6.pdf PDF
Statement of Objectives.pdf PDF
FA821325R3010.pdf PDF
SOW Packaging.pdf PDF
ID-015715244.pdf PDF
ID-016525022.pdf PDF
AIR SPEC.docx DOCX document
Section L CADPAD.pdf PDF
Section M CADPAD.pdf PDF
ADC SOW Jan2018.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for

Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the

Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(End of clause)