AIR SPEC.docx

DOCX document 28 KB Posted

Attached to
UWARS Battery Kits
Solicitation number
FA8213-25-R-3010
Issued by

About this file

This document is an Ammunition Specification (AirSpec) for a military contract related to inert ammunition items. The specification provides detailed technical requirements for manufacturing, shipping, and testing ammunition components, with a focus on energetic materials, lot numbering, marking, and quality control. Key requirements include providing advanced Reports of Shipment (REPSHIP), contacting the Defense Contract Management Agency (DCMA) for transportation guidance, and adhering to specific marking and lot acceptance test protocols.

Critical technical specifications include a 24-month age limit for energetic materials and components, mandatory traceability to DoD-qualified manufacturers, and compliance with ITAR regulations. The specification outlines strict requirements for material handling, testing, and reporting, including provisions for Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request for Variances (RFVs). The document is associated with the Department of the Air Force Materiel Command Lifecycle Management Center at Hill Air Force Base, with a contract number of FD2020-25-50019/50020 and an NSN of 1377-01-571-5244ES.

View the file

Other files

File Type Posted
FA821325R3010.pdf PDF
ES7034.pdf PDF
SOW Packaging.pdf PDF
ID-015715244.pdf PDF
ID-016525022.pdf PDF
REPSHIP.pdf PDF
CDRLS 25-50019_25-50020.pdf PDF
CADPAD Item Marking Instruction Ver 1.6.pdf PDF
Statement of Objectives.pdf PDF
Section L CADPAD.pdf PDF
Section M CADPAD.pdf PDF
ADC SOW Jan2018.docx DOCX document
Show all 12

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIRMUNITION SPECIFICATION

DATE: 10OCT2024

FD2020-25-50019/50020

NSN: 1377-01-571-5244ES

ALT NSN: 1377-01-652-5022ES

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with Attached REPSHIP.

2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to: AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.

3. Department of Defense Identification Code (DODIC): JN18

4. Ammunition lot numbering shall be accomplished. Reference MIL-STD-1168C for guidance. Each energetic ingredient and component used in production lot(s) shall be from a single material lot.

5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.6, dated 6 March 2023, reference attachment.

6. Shelf Life Code marking NOT required per MIL-STD-129R (C3).

7. Items are Inert.

8. Hazard Classification Information: INERT Hazard Class/Division:

Compatibility Group:

DOT Marking/EX Number:

DOT Shipping Labels UN Number:

Proper Shipping Name:

Net Explosive Weight per item (NEW):

NEW Unit of Measurement:

NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

9. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the: COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639E)
NORs – CDRL (DI-SESS-80642E)
RFVs – CDRL (DI-SESS-80640E)

Distribution Statement: _B_, Reason: Controlled Technical Information (ref. DoD 5230.24)

10. Lot Acceptance Test Requirements are: IAW latest government approved ATP

11. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF

CDRL: (DI-NDTI-80809B)

12. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization: EBHJ Organization E-mail: alyson.weber.ctr@us.af.mil

13. In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255B)

14. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).

15. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan. Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

16. Percussion primers shall have been certified /recertified by performing sensitivity (all-fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2-year certification. Primers shall be stored in a temperature and humidity-controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item. All primers shall be X-rayed in top and side views for critical defects prior to use.

17. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: Section E – Production LOT Test

18. The contractor is allowed to pre-select no more than 30% of the required production lot test samples per lot which have external cosmetic defects such as nicks, dings, scratches, paint blemishes, plating blemishes, and small burrs. These units can be used as pre-selected production lot test samples as long as the units do not create an interference with the test fixture. The selection of those samples shall be noted in a discrepancy report that shall identify the item part number, DODIC, contract, lot number, serial numbers of the pre-selected units, and the cosmetic defect of each serial number. DCMA shall be notified in advance by submission of the discrepancy report of the preselected production lot test samples with external cosmetic defects prior to submission of the production lot for random sample selection. LAT units preselected under this premise shall be noted in the Lot Acceptance Test Report.

19. Any Rework or repair on nonconforming material, beyond approved operation procedures and/ or after product has been submitted to the government shall be approved by EBH procurement engineering authority prior to rework and repair of the nonconforming material. (See Attachment #5, ES7034).

20. DoD Preferred Methods for Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. All references to MIL-STD-105, MIL-STD-414, MIL-STD-1235, and ANSI Z1.4 appearing in the Technical Data Package (TDP) are replaced by MIL-STD-1916. Verification Levels (VL) shall replace AQLs and shall be VL IV for major characteristics and VL II for minor characteristics.

21. Contractor shall provide an Obsolescence Alert Notice that a pending and/or emergent obsolescence issue exists.

22. Contractor shall provide Diminishing Manufacturing Sources and Material Shortages (DMSMS) Metrics Data to support reporting on DMSMS management activities as a part of the Governments’ Total System Life Cycle Management responsibilities. CDRL (DI-MGMT-82275)

File details come from the government source that posted it. Updated .