ES-21-00334 SYR RTR Tower Replacement Scope of Work.pdf

PDF 68 KB Posted

Attached to
Syracuse, NY RTR Tower Project Federal contract opportunity
Solicitation number
6973GH-21-R-00066
Issued by
Department of Transportation Federal Aviation Administration Franchise Acquisition Services

About this file

This solicitation from the Federal Aviation Administration seeks proposals for a tower replacement project at Syracuse Hancock International Airport. Contractors are required to demolish four existing guyed towers and construct a new 40-foot self-supporting steel tower with a 16-foot by 24-foot platform, stairs, safety railings, cable ladder, obstruction light, lightning terminals, and antenna mounts. Additional requirements include soil boring, mapping underground cables, installing grounding protection, running cable between the new tower and existing building, and restoring the site upon completion. Proposals are due by 5:00pm CST on May 14, 2021 and should be submitted electronically to the point of contact. The anticipated contract type is firm-fixed-price.

View the file

Other files for this federal contract opportunity

Other files attached to Syracuse, NY RTR Tower Project, newest first.
File Type Posted
6973GH-21-R-00066.pdf PDF
SYR RTR Specs Final.pdf PDF
WAGE DETERMINATION.pdf PDF
SYR RTR Tower Replacement Drawings Final.pdf PDF
Payment Bond (08.31.1997).doc DOC document
Contractor Release Form DOT F 4220.4.pdf PDF
Experience Information Form.pdf PDF
Performance Bond (12.31.2004).pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

JCN: 1600912

Syracuse Hancock International Airport (SYR) RTR Tower Replacement Scope of Work

1) Provide ground mapping for existing cable on site.

2) Provide soil boring and design for one new tower 40’ tall 16’x24’ platform on site.

3) Install one new 40’ free-standing tower with a 16’x24’ platform, stairway with safety rail, cable ladder, obstruction light, lightning terminals and 14 antenna mounts.

4) Level and stone area surrounding tower.

5) Install grounding protection for new tower with down conductors to new counterpoise for tower. Attach new tower counterpoise systems to existing system.

6) Install 2 ice bridge overhead cable systems from the building to the new tower. These will accommodate 14 runs of LMR-900 each and 1 power conduit run.

7) Create new openings on front side of building to accommodate entry plates and boots.

8) Install a ground bars and 2 junction boxes on wall inside the existing RTR building. The ground bars will have polyphasers and grounding to existing counterpoise.

9) Install 2 new Stainless Steel 36”x36”x12” box on new tower with ground bar, polyphasers and grounding to existing counterpoise.

10) Provide and install 28 runs of new LMR -900 cable from new tower junction box to RTR building ground bar.

11) Provide and install LMR -400 from tower junction box to each antenna. (by FAA)

12) Provide and install LMR-400 from shelter to each radio with any additional cable tray as required

(by FAA)

13) Demolish 4 existing 50’ guyed tower to 2 foot below grade

14) Restore area to surrounding condition.