Statement of Work
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPERTY OF THE UNITED STATES GOVERNMENT COPYING, DISSEMINATION, OR DISTRIBUTION OF THESE DRAWINGS, PLANS, SPECIFICATIONS OR MATERIALS TO UNAUTHORIZED USERS IS PROHIBITED
SOW FCH Historic Paint and Plaster Renovations page 1 of 13
Albany Field Office 11A Clinton Ave Albany, New York 12207
GSA Northeast & Caribbean Region U.S. General Services Administration
April 12, 2018
Scope of Work
Prepared by Thomas Lucas
RE: Historic Paint and Plaster Renovations
Location of Work: James T. Foley Federal Courthouse, 445 Broadway, Albany NY 12207
Building no: NY0002ZZ
PART 1 - GENERAL
1.1 PROJECT IDENTIFICATION
Project Summary Description: The project will consist of the following; supply all labor, supervision, tools, material to complete the work identified. All work is to be performed per industry standards, state and local codes and manufacturer specifications to restore the ceiling areas identified. See attached sketch and photographs for area of works. The project includes but is not limited to the following three areas of work.
A. Scope: This project for the restoration of historic ceilings shall repair damaged plaster and repaint ceilings to visually represent the original building construction. Work shall include but not be limited to creating a replica of the historic ornate moldings and inserting them into areas where existing damage is present. It will be the burden of the contractor to use proper techniques and installation methods, pigments, color, etc., to create and install the replacement moldings. Provide proper restoration techniques and methods, installation of dust protection, installation of protection to guard against damage to other equipment or areas of the building, demolition of damaged ceiling, restoration of molding and ceiling, repainting of ceiling and trim (as applicable), final cleaning of work area.
• Areas of work: see attached sketches o First floor corridor south ceiling
Plaster repair as needed Paint entire area of ceiling Work activity and associated scaffold shall not impede pedestrian traffic flow o Fifth floor stairwell ceiling – south Plaster repair as needed
SOW FCH Historic Paint and Plaster Renovations page 2 of 13
Paint entire area of stairwell ceiling Block off stairwell (floors 4 to 5) for use during o Fifth floor stairwell ceiling – north Plaster repair as needed Paint entire area of stairwell ceiling Block off stairwell (floors 4 to 5) for use during
• Scaffold: Assembly and disassembly to be performed during normal business hours.
Scaffold construction to incorporate measures that will allow daily work by contractor on ceiling surface above while pedestrian traffic below will not be impeded in any direction.
Completed scaffold construction to be certified by competent person prior to use and daily before work activity begins. Scaffold access shall be locked secure restricting access during periods of contractor inactivity such as but not limited to nights, weekends, lunch breaks etc. The scaffold shall be encapsulated for the purposes of containing any loose or peeling lead paint on the ceiling applying standard methods for work about peeling lead based in addition to dust control from the work areas.
• Paint being removed: (only the minor amount of peeling paint is intended to be removed, see photos attached for extent) o Removed paint shall be treated as lead containing and disposed of according to the.
The Subcontractor shall provide all labor, materials, equipment, services, supervision and incidentals necessary to perform work of lead paint abatement under this contract in accordance with the following specifications. After abatement and cleanup by the subcontractor, the affected areas shall be visually inspected and surface tested by the Government’s third party monitoring consultant.
o The Subcontractor shall collect and package removed lead containing waste in the manner specified herein and as required by EPA, OSHA and the State of New York.
• Prepare the ceiling surface to a drywall finish level 4 with similar materials equal to native ceiling construction (i.e. plaster) per manufacturers recommendations. All construction debris removed shall be transported from the work area and off premise within a sealed, closed container (i.e. bag) to limit casual dispersion of materials removed.
• Furnish and apply one primer and two coats of finish paint onto entire ceiling area surface.
Colors of finish paint to be selected by Building Manager. All paint to be commercial/industrial grade, latex based, zero VOC with flat matching finish. Note: It is the intent of this repair to match as close as possible the existing ceiling color and appearance.
B. The project was designed by the GSA
C. Project Manager is: Thomas Lucas, Construction Representative, PM/COR
D. Building Manager is: Ferg Foley
E. Contracting Officer is: Matthew Murphy
SOW FCH Historic Paint and Plaster Renovations page 3 of 13
1.2 WORK SEQUENCE
A. The following work shall be completed, including the time to order materials and equipment, within 90 calendar days after notice to proceed. All work (except for lead paint removal) shall be performed during normal business hours 7 am to 5 pm unless otherwise prearranged with the Building Manager.
B. Any lead paint shall be removed outside of normal working hours stated above.
1.3 WORK UNDER OTHER CONTRACTS
A. The Contractor shall cooperate with other contractors performing related work in the building, including providing labor, materials and other costs necessary to satisfactorily coordinate the Contract work with work performed under other contracts. This includes such things as utility shutdowns, and use of service elevator and loading dock
1.4 SCHEDULE OF GOVERNMENT-FURNISHED PROPERTY
A. The project includes the following Government furnished property to be installed by the Contractor.
• None
1.5 MISCELLANEOUS PROVISIONS
A. Work in the extension of existing conditions shall correspond in all respects with the existing conditions to which it connects, or to similar existing conditions, in materials, workmanship and finish.
B. Alterations to Existing Conditions: Existing conditions shall be cut, drilled, removed, temporarily removed, or removed and replaced, as necessary for performance of Work under the Contract.
a. Replacements of existing conditions that are removed shall match similar existing conditions.
b. Unless otherwise indicated, existing structural members shall not be cut or altered without authorization by the Contracting Officer.
c. Conditions remaining in place, which are damaged or defaced during the Work, shall be restored to the condition existing at time of award of Contract.
d. Discolored or unfinished surfaces exposed by removal of existing conditions, that are indicated to be final exposed surfaces, shall be refinished or replaced as necessary to produce uniform and harmonious contiguous surfaces
C. Existing utility services with related meters shall remain intact
SOW FCH Historic Paint and Plaster Renovations page 4 of 13
PART 2 - PRODUCTS
• Scaffold layout
• Worker certifications
• Work Schedule (days and hours to work)
• Paint color selections (First floor and stairwells)
• Lead paint abatement plan for the small amount of paint being disturbed
PART 3 – QUALITY ASSURANCE
3.1 Contractor shall furnish all labor, tools, materials and equipment to perform this work. Any building components or systems disturbed must be restored and patched to original condition. All work must comply with all applicable building codes, regulations and standards. The area shall be broom cleaned before final inspection. The contractor shall dispose of all trash daily.
PART 4 - SKETCHES
• See attachment below
PART 5 - SECURITY
• See attachment below
-------..__J
H H
First Floor South - Area of Work ------4----+-��
Area: 260 SF approx.
Ceiling Height: 17'-6" approx.
Maintain open pedestrian � passage both directions c 106 ) c 102 ) _____,....__r----,...__.r,....___...,__, __,,_ _ ____,..,__,---------' ___,..,____�......., H
TOILET
H
ELE'
H
ThomasELucas SBU Dwg
ThomasELucas Pencil
ThomasELucas Oval
I ._�v --�)J v.._ __ .-�)J
I LJ 554
ELEV. LOBBY
North Stairwell Ceiling - Area of Work --+-----�
Area: 450 SF approx.
Ceiling Height: 25' approx.
H cot
H
SBU Dwg
-=--+=-+-+----r- South Stairwell Ceiling - Area of Work Area: 450 SF approx.
Ceiling Height: 25' approx.
H H
1. First Floor corridor ceiling
2. First Floor corridor ceiling
3. First Floor corridor ceiling
4. North stairwell ceiling
5. North stairwell ceiling
6. North stairwell ceiling
7. South stairwell ceiling
8. South stairwell ceiling
9. South stairwell ceiling
10. South stairwell ceiling
Attachment A HSPD-12 Security and Credentialing Requirements
PART 1 - SECURITY REQUIREMENTS AND PERSONAL IDENTITY VERIFICATION AND
CREDENTIALING PROCEDURES FOR CONTRACTORS
(NON-CLASSIFIED CONTRACT)
1.1 The General Services Administration (GSA) reserves the right to verify the identities of Contractor personnel with routine, unaccompanied access to GSA facilities or Information Technology (IT) systems and networks, to make contract employment suitability determinations based on background investigations, and control access to GSA facilities and IT systems and networks based on the suitability determinations. The term ‘Contractor’ refers to the General/Prime Contractor Company or lessor on a GSA contract and any related Subcontractor(s) company and Vendor(s). The term ‘Contractor Personnel’ refers to any Contractor personnel supporting GSA contracts. The Contractor and their Contractor Personnel shall comply with the GSA Personal Identity Verification (PIV) procedures outlined below, that implement Homeland Security Presidential Directive-12 (HSPD-12), Office of Management and Budget (OMB) guidance M-05-24, and the Federal Information Processing Standards Publication (FIPS PUB) Number 201, as amended. HSPD-12 requires Federal agencies to issue standardized PIV credentials to Federal employees and contractors and use the credentials for access to Federal facilities and IT networks and systems. GSA branded the PIV card that GSA issues to its personnel as the GSA Access Card. The GSA Access Card enables routine, unescorted access to GSA facilities and IT systems and networks.
1.2 In accordance with FAR 52.204-9 (Personal Identity Verification of Contractor Personnel (Jan 2011). the Contractor shall account for all GSA credentials issued to Contractor Personnel in connection with the performance under this contract. The Contractor Personnel shall immediately return credentials issued by GSA under any of the following conditions, as stipulated in FAR 52204-9:
All Contractor Personnel who will perform work on a GSA contract and will require routine access to GSA facilities or IT systems and networks may be required to obtain a GSA Access Card. The GSA Contracting Officer or their Designated Representative and/or the Security Officer will define routine access. Contractors must receive a favorable result on their Federal Bureau of Investigation (FBI) Fingerprint Check and GSA must have initiated a minimum of a National Agency Check with Written Inquiries (NACI) before GSA can issue an Access Card to them. GSA will revoke the Access Card for a Contractor who receives an unfavorable final suitability determination based on the NACI or higher background investigation. GSA may also remove the Contractor from the GSA contract and restrict access to GSA facilities and IT systems and networks if the Contractor receives an unfavorable final suitability determination.
A. GSA has full and complete control over granting, denying, withholding or terminating suitability determinations for Contractor Personnel supporting GSA contracts. GSA may authorize and grant temporary suitability to Contractor Personnel. A temporary or preliminary suitability determination by GSA does not guarantee that GSA will grant a favorable final suitability determination. A favorable temporary, preliminary or final suitability determination by GSA shall not prevent, preclude, or bar GSA from withdrawing or terminating a suitability determination.
B. HSPD-12 establishes the minimum background requirements for GSA to issue an Access Card. GSA may require Contractor Personnel to obtain a higher background investigation level than the minimum required background investigation for an Access Card based on the Contractor Personnel’s contract employment job duties.
C. Contractor Personnel may be required to submit additional personnel information to other Government Agencies affected by the contract work and based on working within that Agency’s space.
1.3. GSA may require Contractor Personnel who need less than routine access to GSA facilities or IT systems and networks to receive a favorable result on a National Agency Check (NAC) to access GSA facilities or IT systems and networks. The GSA Contracting Officer or their Designated Representative and/or the Security Officer will define the level of access to GSA facilities or IT systems and networks from a favorable NAC and will define how long the access is valid. Contractor Personnel that are not required to receive a favorable suitability determination may be required to be escorted at all times while in non-public GSA space.
1.4. The Contractor shall account for all GSA credentials issued to Contractor Personnel in connection with the performance under this contract. The Contractor Personnel shall immediately return credentials issued by GSA under any of the following conditions:
A. When the Contractor Personnel is no longer required for contract performance.
B. Upon completion of the Contractor Personnel’s employment.
C. Upon contract completion or termination.
D. If the Contractor Personnel is removed from the contractor based on an unfavorable determination on any suitability check.
1.5. The Contracting Officer may delay final payment or execute an equitable adjustment under the contract, if the Contractor and their Contractor Personnel fail to comply with the requirements in paragraph 1.4.
1.6. Contractor shall insert these requirements in all subcontracts. It shall be the responsibility of the Contractor to return all credentials issued by GSA in accordance with the terms set forth in paragraph 1.4, above of this section.
PART 2 - FEDERAL DEBT REDUCTION AND OVERSIGHT OF FEDERAL FUNDS
2.1 The GSA has a fiduciary responsibility to provide oversight of federal funding. The Contractor will work with the GSA to reduce expenditures, and assure oversight of federal tax dollars when requesting background checks. In order to reduce expenses and ensure prudent use of federal funds, the Contractor will make every effort to pre-screen or interview prospective personnel to help ensure they are suitable for employment, and are able to pass a background check prior to submitting employee applications to GSA.
2.2 The Contractor company shall assign and dedicate a single Point of Contact (POC) for the overall control, management, and oversight of all suitability investigation applications for its Contractor employees. The Contractor POC is responsible for collecting all of the Contractor employee background investigation documents and submitting them to the Contracting Officer or their Designated Representative to ensure the completion of the background investigation request. The Contractor POC shall follow the method identified by the GSA Contracting Officer or their Designated Representative and/or the Security Officer to submit the background investigation documents to GSA. The Contractor POC must provide follow-up and monitoring to ensure that the Contractor Personnel who needs an investigation responds to requested information and completes all required forms within the prescribed times allowed so as not to delay the project schedule or project completion date.
2.3 The Adjudicating Office of the Federal Protective Service may forward a written notification to contractor personnel for clarification information that pertains to the background investigation requesting additional information or supporting documentation. The POC shall ensure the Contractor responds to such inquiries so as not to cause delay, or consider submitting an alternate applicant so as not to cause delay with the project schedule or project completion date.
PART 3 - ADJUDICATION AUTHORITY
3.1 GSA and its Authorized Agent, the Federal Protective Services (FPS) or any other named designee, will be responsible for conducting the HSPD-12 background investigations, and credentialing of Contractor Personnel. GSA has the final authority to process the HSPD-12 background investigations, as directed by the Office of Personnel Management (OPM).
PART 4 -PROCESSING OF HSPD-12 INVESTIGATIONS AND CREDENTIIAL PROCEDURES
4.1 Submission of Forms: All Contractor Personnel requiring facility or IT system and network access may be responsible to fill out and complete security HSPD-12 forms and fingerprint cards or electronic fingerprint scans prior to being allowed access. GSA will provide detailed instructions on the HSPD-12 process, the forms to be submitted, and the handling of the forms after the contract has been awarded. Depending on the level of responsiveness and timeliness of individual Contractor personnel, a maximum of fifteen (15) days is expected for the completion and submission of all forms by the applicant for review through the GSA. More importantly, however, the Contractor and the single Contractor Point of Contact (POC) managing all Contractor Personnel has the responsibility to submit applications in a timely fashion so as not to delay any project activities or the overall project schedule. Complete submissions of all suitability investigation forms are required to be provided for all applicants a minimum, thirty (30) days prior to access being required without the need for a HSPD-12 credential or sixty (60) days prior to access being required when a HSPD-12 credential is required. Access requirements by Contractor Personnel shall be based on the contract time performance requirements, and the planned activities on the approved project schedule. The Contracting Officer or their Designated Representative and/or Security Officer will notify the Contractor POC in writing if any Contractor Personnel receive an unfavorable decision on their background investigation, and effective immediately; the individual will no longer be allowed to work on the project. The Contractor Personnel shall be responsible for planning and scheduling its work in such a manner as to account for the facility or IT access requirements. Difficulties encountered by the Contractor Personnel in gaining access when required by not fulfilling application requirements in a timely manner shall not be an excuse for Contractor non-performance under the contract, or the granting of any time extensions.
A. Throughout the life of the contract, the Contractor shall be responsible to follow these same procedures for any new Contractor personnel, who will require access to GSA’s space or IT systems and networks.
B. Also throughout the life of the contract, the Contractor shall maintain a listing of current/active personnel and their subcontractors’ personnel that have received a favorable suitability investigation and/or have a GSA credential. The Contractor shall provide the Contracting Officer or their Designated Representative, an updated listing of current/active personnel or subcontractors’ personnel when requested.
4.2. Unsuitable Personnel: If the Contracting Officer receives an unsuitable report on any Contract Personnel after the processing their application, or if the GSA finds a prospective Contractor Personnel to be unsuitable or unfit for their assigned duties the Contractor POC shall be advised immediately by the Contracting Officer or their Designated Representative and/or the Security Officer that the Contractor Personnel cannot continue to work or be assigned to work under the contract. The Contractor must then take action to remove the Contractor Personnel from the GSA contract.
4.3 Criteria for Eligibility: Refer to GSA Order 9732.1 or 5 CFR 731 which outlines the disqualifying and mitigating factors for personnel acceptance.
4.4 Prior Background Investigation: Contractor Personnel background investigations obtained through this process may be acceptable if the investigation can be validated to be equal to or higher level than required of the contract, and there is no break in service from when the suitability was provided. The Contracting Officer or their Designated Representative and/or the Security Officer in consultation with the FPS will determine whether there is a break in service and whether a prior background investigation meets GSA’s requirements to grant access to GSA facilities and IT systems and networks. GSA requires the Contractor Personnel to submit required background investigation documents for GSA to determine whether a prior investigation meet’s GSA requirements to grant access to GSA facilities and IT systems and networks.
4.5. Identification Credential: The following paragraphs describes GSA’s requirements for Contractor Personnel to display GSA credentials, follow GSA building screening procedures, and follow procedures to report lost GSA credentials.
A. Contractor Personnel with GSA credentials shall be required to comply with all applicable access security screening procedures applicable to Government or other personnel possessing similar credentials, or as determined by the building practices as defined by the Facility Security Committee.
B. All Contractor Personnel possessing credentials (Access Card, other agency-issued PIV credentials, or other credentials) shall visibly display their credentials at all times while in the building(s) where work is being performed.
C. The Contractor shall be responsible for ensuring that all GSA identification credentials are returned to the GSA when Contactor Personnel are no longer employed, providing service under the contract, the contract ends or the Contractor Personnel is removed as a result of an unfavorable determination on any suitability check.
D. The Contractor Personnel shall notify the GSA when credentials are lost. If the Contractor Personnel is determined to be negligent, the Contractor may be responsible for reimbursing the Government for its cost in issuing a replacement credential.
PART 5 - GSA ACCESS CARD: CONTRACTOR’S TRAVEL COSTS
5.1. Contractor personnel who require routine access to GSA-controlled facilities and/or access to GSA IT systems must receive a preliminary favorable HSPD-12 security background investigation, before receiving a GSA Access Card.
5.2. Following a favorable HSPD-12 security background investigation, Contractor Personnel may be required to enroll and activate a GSA credential card at a designated location. The credential card is also a photo Identification card, which includes biometric information. The following information is provided to assist the Contractor in estimating the costs that may be associated with this requirement. The Contractor Personnel will be expected to utilize the nearest credentialing site to their offices or place of contract performance. The credentialing station may be a mobile station in the area, or as a fixed station whose location(s) can be located through the following source:
http://www.fedidcard.gov/centerlocator.aspx. Credentialing centers that are listed as “Open to all Agency personnel” are open to all customer agencies including GSA Contractors. Credentialing centers that are listed as “For use by personnel from this Agency only” mean that they are only open to personnel of that specific agency that is hosting that credentialing center. Currently a minimum of two visits to a credentialing center may be required to enroll and activate the GSA credential. The first visit is to enroll for the credential, and the second visit may be required to pick-up and activate the credential. Travel distance to a credentialing center will vary based on availability of enrollment and activation stations identified in the link above. Additional visits to a credentialing center may also be required if the card holder needs to recertify their credential certificate (every 3 years), or when the employee will need to renew their GSA credential that has expired (every 5 years). Additional visits may also be required for lost or damaged credentials needing replacement.
5.3. If a GSA credential card is required, the Contractor would be responsible for all travel and labor costs associated with fingerprinting to meet the background investigation along with the credential card enrollment and activation steps to meet HSPD-12 requirements unless stated otherwise elsewhere in the contract. Travel costs may be comprised of mileage, vehicle rental, or other modes of transportation, per diem, and lodging. These costs are considered reasonable to the extent that they do not exceed, on a daily basis, the maximum rates in effect at the time of travel, as set forth in the Federal Travel Regulation, Chapter 301 – Temporary Duty (TDY) Travel Allowances, which can be accessed at the following website: http://www.gsa.gov/ftr.
Information on Privately Owned Vehicle (POV) Mileage Reimbursement Rates can be accessed at the following website: http://www.gsa.gov/travelpolicy.
5.4 Any annual training requirements associated with IT access that may be required for continued use of the GSA credential is expected to be completed within a timely fashion.
Otherwise, the Contractor Personnel’s access may be revoked and the credential taken away.