CLIN 0002, Scope of Work Remove Vinyl Wall, Fairbanks Federal Building
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| AMEND_002_SF_30.pdf | ||
| Const_Wage_Determ_6_26_18.pdf | ||
| FFB_Glass_Wall_and_Door_Drawing_RFI.pdf | ||
| Amend_001_EQ10PCB-1-18-0031.pdf | ||
| FFB_Paint_Restrooms_Drawing.pdf | ||
| Representations_&_Certifications.docx | DOCX document | |
| FFB_Paint_Garage_Foyers_Drawings.pdf | ||
| FFB_Glass_Wall_and_Door_SOW.pdf | ||
| Solicitation_EQ10PCB-1-18-0031.pdf | ||
| FFB_USPO_Door_Install_Drawing.pdf | ||
| FFB_USPO_Door_Install_SOW.pdf | ||
| FFB_Remove_Vinyl_Wall_Drawing.pdf | ||
| FFB_Paint_Restrooms_SOW.pdf | ||
| FFB_Glass_Wall_and_Door_Drawing.pdf | ||
| Const_Wage_Determ_5-23-18.pdf | ||
| FFB_Paint_Garage_Foyers_SOW.pdf | ||
| EQ10PCB-1-18-0031_Agreement_.pdf | ||
| SF1442__EQ10PCB-1-18-0031.pdf |
Show all 18
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FFB Remove Vinyl Wall Scope of Work
U U.S. GENERAL SERVICES ADMINISTRATION, NORTHWEST/ARCTIC REGION 10
Section 1:
Project Location & Building Number
Section 2:
Background
Section 3:
Work Hours
Section 4:
Parking/ Loading Dock
Section 5:
General Information
Fairbanks Federal Building 101 12th Ave Fairbanks, AK 99701
AK0029ZZ
The United States General Services Administration (GSA) requests removal of vinyl wall covering from the basement corridor walls of the Fairbanks Federal Building. After removal of the vinyl wall covering; prepare, patch, and paint the walls, and install new cove base.
This project shall be accomplished outside normal FFB weekday working hours of 7:00 AM to 5:00 PM. Contractor shall schedule the work in writing at least 5 business days in advance with the GSA Project Manager (PM).
Contractor parking at the FFB is available on first-come-first-serve basis only.
Access to the loading dock requires advance coordination with the GSA PM.
1. All work shall comply with the latest versions of GSA’s PBS-P100, Facility Standards for the Public Buildings Service http://www.gsa.gov/portal/content/104821, and GSA Region 10 Fire Alarm Design, Installation and Testing Policy
2. Specific attention should be given to PBS P-100 Chapter One requirements including Laws, Regulations, Codes and Standards, and Key Sustainable Product requirements for carpet, interior paint, gyp board, ceiling tiles, and concrete.
3. Contractor shall provide all supplies, equipment, materials, services, and labor to perform the work.
4. Contractor shall be responsible for obtaining all necessary local, state, and federal permits, licenses, and clearances.
5. Field Verification: All work dimensions, quantities, and locations shall be field verified by the contractor.
6. Contractor Use of Premises: The Contractor shall coordinate with the GSA
PM to arrange a schedule for site access during construction. Construction processes disruptive to normal facility operations shall be coordinated with the GSA PM in writing at least 5 business days in advance. The Contractor shall be authorized to use building restrooms.
http://www.gsa.gov/portal/content/104821
Section 6:
Description
7. Utilities: Contractor shall be authorized to use utilities during the course of this project. The contractor is responsible for making connections to the existing utility systems. Temporary electrical work shall meet the requirements of NFPA
70. When temporary connections are removed, the Contractor is responsible for restoring existing utility services to their original condition.
8. Utility Outages and Locates: No utility outages will be approved without the written consent and approval of the GSA PM. Requests for utility outages shall be coordinated in writing at least 5 business days in advance with the GSA PM.
9. Protection of Public: The building site will continue to be used by tenants.
The contractor shall fence, barricade, or otherwise block off the immediate work area to prevent unauthorized entry.
10. Housekeeping: The project site shall be kept in a neat, orderly, and safe condition at all times and all work areas shall be cleaned at the end of each work day. A final cleaning of the entire construction area will be required at substantial completion of the project. Final Cleaning to include (1) Removal of all tools, equipment, surplus material, and rubbish/debris; (2) Restore or refinish, to original condition, surfaces that are damaged due to the work of this contract; (3) Removal of grease, dirt, stains, foreign materials, and labels from finished surfaces; and (4) thoroughly clean building interiors.
11. Disposal: Ensure all waste materials and debris is disposed at an Alaska
Department of Environmental Conservation (DEC) approved disposal site, in accordance with applicable environmental regulations. Unless otherwise specified, all material(s) removed becomes the property of the Contractor.
12. Painting/Staining: If necessary, all painting, staining, or other activity which may cause noxious or undesirable fumes must be performed outside of the normal working hours of 8AM-5PM. Painting/Staining shall be coordinated in writing with the GSA Project Manager at least 5 business days in advance. The Contractor is responsible for using “low or no VOC” paints and stains.
13. Communications: Contractor project designee must be available to provide project status updates to GSA each work day.
Contractor shall execute the project as follows:
1. Remove and dispose of all vinyl wall covering, oak chair rail, and cove base in the FFB basement corridor. See attached FFB Remove Vinyl Wall Floorplan; and reference enclosed photo of the basement corridor.
2. Prepare, patch, prime coat, and paint walls. Apply two coats of paint to ensure full coverage; match existing paint and finish.
3. Painting of the doors and door frames are not required in this project.
4. Provide and install cove base. Install cove base in lengths as long as practicable without gaps at seams and with tops of adjacent pieces aligned.
5. Provide and install stainless steel corner guards on all wall corners throughout the basement corridor.
Section 7:
Submittals
Section 8:
Attachments
Salient Characteristics:
Paint:
Walls: Sherwin-Williams acrylic semi-gloss, low or no VOC, or GSA Contracting Officer approved equal
Door Frames: Sherwin-Williams, low or no VOC, or GSA Contracting Officer approved equal
Colors TBD
Drawdowns required
Cove Base:
4” rubber cove base
Color TBD
Corner Guards:
Stainless steel
36” Height
Submittals: Submittals verify design intent; however, approved submittals DO NOT automatically constitute a waiver to the contract document requirements. If a waiver or deviation from the contract document requirements is required the Contractor must submit a Request for Information (RFI) to the Contracting Officer. The Contracting Officer will determine if a waiver is permitted and respond to the RFI.
Submittals required by this contract are the following:
1. Paint, cove base, and corner guard product info.
Attachments:
1. FFB Remove Vinyl Wall Covering Floorplan
-End of Scope of Work-