Amendment No. 2.pdf
PDF 19 KB Posted
- Attached to
- Architect-Engineer Services for the USEPA in Regions 6 through 10 Federal contract opportunity
- Solicitation number
- EPA-CPOD-022
About this file
Amendment No. 2 to Announcement EPA-CPOD-022 Architect-Engineer Services for the USEPA in Regions 6 through 10 March 21 2011
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Justification_for_Exception_3_23_16.docx | DOCX document | |
| Amendment No. 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Amendment No. 2 to Announcement EPA-CPOD-022 Architect-Engineer Services for the USEPA in Regions 6 through 10
March 21, 2011
Q1. Firms are requested to keep the total page count of the SF 330, Part I submission to no more than 30 pages of text. Note that if pages are double-sided, 15 double-sided sheets would count as 30 pages. Also note that the Part II portions of the SF330 are NOT included in the 30-page limit.
Only fifteen (15) letter size sheets may be attached to the SF 330, Part I submission as supplemental information (photographic and/or technical material), specifically responding to the above criteria. All projects listed in the SF 330 package must have been performed by the office/branch/individual team members which would be performing the work under any resulting EPA contract. Does the text in bold indicate that Part I of the SF330 may be 30 pages in length i.e. resumes/projects and we have an additional 15 pages for supplemental information for section H; therefore, we’d actually be allowed a maximum of 45 pages?
A1. Yes.