Amendment A0003-EP2972-24.pdf
PDF 297 KB Posted
- Attached to
- Van Conversion to 4x4
- Solicitation number
- EP2972-24
About this file
This document is an Amendment to a Solicitation issued by UNICOR, FPI Central Office for a van conversion to 4x4 contract. The amendment modifies the Statement of Work to add specifications such as a 3-inch ride height increase, protective aluminum skid plates, and other requirements related to the 4x4 conversion. It also clarifies that the vendor must use General Motors Original Equipment components wherever possible. The closing date for submitting proposals has been extended to March 25, 2024 at 2:00 PM PST. All other terms and conditions of the original solicitation remain the same.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment A0002 - EP2972-24.pdf | ||
| Amendment A0001 - EP2972-24.pdf | ||
| Business Management Questionnaire Forms.pdf | ||
| Solicitation EP2972-24.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT
1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NO.
3. EFFECTIVE DATE
4. REQUISITION/PURCHASE REQ. NO.
5. PROJECT NO. (If applicable)
A0003 3/26/2024
6. ISSUED BY CODE
7. ADMINISTERED BY (If other than Item 6) CODE
UNICOR, FPI CENTRAL OFFICE
400 1ST ST NW
WASHINGTON DC 20534-0004
See Block 6
8. NAME AND ADDRESS OF CONTRACTOR (No., street, country, State and Zip Code) (x)
9A. AMENDMENT OF SOLICITATION NO.
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NO.
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE 3/26/2024
11. THIS ITEM ONLY APPLIES TO AMENDMENT OF SOLICITATIONS
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, Appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103 (b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF :
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return 1 copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
This amendment is to add the following specifications:
PROTECTIVE AFTERMARKET OR FABRICATED ALUMINUM SKID PLATES
3” RIDE HEIGHT INCREASE
CENTER OF GRAVITY RAISED NO MORE THAN 1”
Also changing the following sections under the Statement of Work:
iii. Convert 4X2 van 4.3Liter Gas, 6.6 Liter Gas, or 2.8 Liter Diesel engine van to 4X4 with 3” lift option.
iv. Install replacement tires, BF Goodrich LT 245/75R 16E All Terrain TA/KO 2 Tires or equal, Quantity 4, with OEM Tire Exchange.
vi. Install aftermarket Rear Sway Bar, Hellwig Sway Bar for Van only or equal.
viii. Install aftermarket bump stops
ix. Install aftermarket or fabricated protective steel rocker guards.
x. Install aftermarket or fabricated protective aluminum skid plates
xi. Transport GFM vans to and from 4X4 Van Conversion Vendor location from the designated UNICOR upfit factory.
**Continued on page 2**
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
Omar Sanchez, Contracting Officer 15B. CONTRACTOR/OFFEROR 15C. DATE SIGNED 16B. UNITED STATES OF AMERICA 16C. DATE SIGNED
3/26/2024(Signature of the person authorized to sign) (Signature of contracting officer)
NSN 7540-01-152-8070
PREVIOUS EDITION UNUSABLE
30-105
STANDARD FORM 30 (REV. 10-83)
Prescribed by GSA
FAR(48 CFR) 53.243
X
X The above numbered solicitation is amended as set forth in Item 14. The hour and the date specified for receipt of Offers is extended, x is not extended. Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods: (a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or telegram which includes a reference to the solicitation and amendment number. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
EP2972-24
Vendor must use General Motors Original Equipment Components:
The Four Wheel(4X4) Drive Conversion Vendor must use General Motors Original Equipment wherever possible for the 4x4 Converted GM van whether the component is standard to the GM Van or a standard GM component from their K-Series model line; Vendor engineers, shall design and manufacture the 4x4 system with as many GM OE components as possible, for ease of service. All non-proprietary components purchased shall be new, direct from GM or the GM supplier. Whether proprietary or not, various moun�ng brackets, adapters and other components shall be engineered and designed in accordance with SAE specifica�ons. All components shall be manufactured in-house or purchased from approved vendors. All vehicles shall be built to U.S. standards only.
Van Conversion 4x4 System shall include:
• Torsion Bar IFS (4100/4600lbs)
• Manual Shi�er
• 4x4 Indicator Light
• protec�ve a�ermarket or fabricated Steel Rocker Guards
• Protec�ve a�ermarket or fabricated aluminum skid plates
• 3” increase in ride height, s�pula�ng that the resul�ng Center of gravity shall not be raised more than 1”
All other terms and condi�ons remain the same.
| Amendment A0003 - EP2972-24 |
| AMENDMENT OF SOLICITATION/ MODIFICATION OF CONTRACT |
123456
File details come from the government source that posted it. Updated .