AMD_01_EP2008-17.pdf
PDF 1007 KB Posted
- Attached to
- PV Solar Array Federal contract opportunity
- Solicitation number
- EP2008-17
- Issued by
- Department of Justice Bureau of Prisons
About this file
AMD 01 EP2008-17
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EP2008-17.pdf | ||
| SF24-16.pdf | ||
| SF25A-16.pdf | ||
| SF25-16.pdf | ||
| Business_Mgmt_Quest._EBG.pdf | ||
| Browning_PV_Array_Siting.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P a g e | 3
Can the Government if the solar gain of 75WK is DC or AC?
Use nameplate DC power rating of panels.
In the SOW section C.4.b – where are both sites. We can only find one site within the solicitation?
Only one site: FRANK M. BROWNING ARC/LTA 1380 N 1200 WEST OGDEN, UT 84404-3448. Disregard any reference to an additional site.
Can the Government provide one line drawings for the electrical panels where the Contractor will connect PV power?
A one line electrical diagram is attached with Amendment 01.
Do contractors need to be certified/verified as an SDVOSB firm through the VA or is it sufficient to be a self-certified SDVOSB
Contractors must be registered and certified in Sam (www.sam.gov)
The solicitation number on fbo.gov is EP2008-17; however, the solicitation number on the SF 1442 is 6200008605. Can you please confirm, which is correct
They are both correct.
How many copies of our proposal are we required to submit? Is it an Original only?
One Copy is all that is required.
Do we need to complete and submit Section K – Representations, Certifications and Other Statements of Offerors with our proposal?
Yes, please complete all sections of the RFP.
Page 5 of 40 mentions we need to provide an Alternate Project Manager. Are we required to provide a resume for our Alternate Project Manager with our proposal
Yes, Alternate Project Manager Resume is required with proposal.
Could you post the electrical one line drawings for the switchgear denoting the voltages the government would like to connect?
A one line electrical diagram is attached with Amendment 01.
Are there any geo-tech reports for the solar field area that we can look at?
No geotechnical information is available.
Does the current aerial with some noted utilizes identify all utilities in these areas?