Environmental Checklist.pdf

PDF 226 KB Posted

Attached to
Meat and Poultry Processing Expansion Program Federal grant opportunity
Opportunity number
RD-RBS-22-01-MPPEP
Issued by
Department of Agriculture Rural Housing Service Washington Office Rural Business Cooperative Services

About this file

Environmental Checklist

View the file

Other files for this federal grant opportunity

Other files attached to Meat and Poultry Processing Expansion Program, newest first.
File Type Posted
MPPEP Summary Updates to the RFA 4-7-22.docx DOCX document
RFA_Meat and Poultry Processing Expansion Program 4-7-22.docx DOCX document
RFA_Meat and Poultry Processing Expansion Program 2-24-22.pdf PDF
MPPEP Application Template.pdf PDF
AD 2106.pdf PDF
RFA_Meat and Poultry Processing Expansion Program 2-24-22.pdf PDF
MPPEP Self-Screening Guide.pdf PDF
MPPEP Application Checklist.pdf PDF
Feasibility Study Guide.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

U.S. DEPARTMENT OF AGRICULTURE RURAL DEVELOPMENT

ENVIRONMENTAL INFORMATION

The purpose of this document is to assist RD staff in collecting adequate information to determine what level of environmental review is necessary. Depending on the information provided, the Agency may request additional information. All answers need to be supported by appropriate documentation, check marks are not sufficient support. Potentially helpful links are provided in blue, these are not an exhaustive or comprehensive list of resources. Yes No

1. APPLICANT NAME:

2 . ADDRESS: Physical location of the property (include legal description if farmland):

3. MAP. Please provide an aerial map showing the building /lot/exact location for all project types, please indicate on map any potential trenching or other ground disturbance, electrical connections, or other relevant information. Is map attached?

4. DETAILED PROJECT DESCRIPTION (Describe how proposed funds will be used. If project involves construction, whether interior or exterior or renovations, please describe in detail. For renewable energy systems such as solar panels be specific on type of system (fixed tilt, tracking, mounting & structure, i.e. ballasted, 3" pile driven, concrete, screws, etc.):

5. SIZE OF THE PROJECT & SITE: Please indicate the size (acres) of your project and how the project will impact the site including roads, right of ways, utilities, or other impacts. Example:

Renewable energy solar project should include sq. ft, linear ft, number of installed units/panels/buildings, and details regarding any trenching or ground disturbance to be completed.

6. Will the project involve construction without any ground disturbance? (i.e.

roof mounted solar)

6a. If no ground disturbance, please provide land use, land ownership, & description (i.e.

industrial, residential, wooded, grasslands, etc.).

6b. If ground disturbance is expected, provide descriptive info, including if the project site was previously disturbed (i.e. previous structure, excavation, cultivation).

7/29/20

7. What is the zoning for the project location?

8. Will the project be located in/on a building that is more than 50 years old? ☐ ☐

9. Will the project be located within the viewshed of a building that is a least 50+ years old?

10. Is the building or project site listed on the State/National Register of

Historic Places?

National Register: https://www.nps.gov/nr/research/

11. If yes to # 8, 9 or 10, has approval or concurrence been obtained from State

Historic Preservation Office?

12. Have any Tribes or Tribal Historic Preservation Officers’ been contacted? ☐ ☐

12a. If so, when?

12b. Were any responses received and if yes, provide details of responses.

Tribal contact TDAT: https://egis.hud.gov/tdat Tribal Lands: https://nationalmap.gov/small_scale/mld/indlanp.html

13. Will the project be located within a Historic District? If yes, please provide review/comments/approval from the local town historic district.

14. Are there threatened or endangered species or critical habitats within the project area? If present describe impact (IPAC report should be included):

14a. Is IPAC report attached? ☐ ☐

IPAC Official Species List: https://ecos.fws.gov/ipac/

15. Will the project involve cutting trees or trimming trees? If yes explain in detail below: how many, how large, tree type, etc.

15a. If yes to 15, can the applicant / project refrain from cutting, clearing, or trimming trees during habitat critical time frames? (Ex. 6/1 - 7/31 for long-eared bat)

16. Is the project located in or could the project effect a wetland? ☐ ☐

16a. Is Wetland map attached? ☐ ☐

NWI:- https://www.fws.gov/wetlands/data/Mapper.html WSS: https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm

NEPA Assist: https://www.epa.gov/nepa/nepassist

16b. If yes to 16, has an Army Corps or other permit been issued for the project site?

17. Is the project located in or could project effect a Floodplain(100 or 500 year floodplains)? If yes provide a FEMA map.

17a. Is FEMA map attached? ☐ ☐

FEMA: http://msc.fema.gov/portal

WSS: https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm

18. Is the project site on or in the vicinity of classified land, such as

State/Federal Parks, Monuments, Natural Landmarks, Wilderness Areas, Wild and Scenic Rivers, State Lands, National Forest, etc.?

USGS: https://nationalmap.gov/small_scale/mld/fedlanp.html

USGS: https://nationalmap.gov/small_scale/printable/fedlands.html NEPA Assist: https://www.epa.gov/nepa/nepassist

18a. If yes explain and indicate if the land managing agency has been contacted.

19. Does project affect Coastal Resources (including Great Lake area) including impact to a coral reef (Coastal Barrier Resources System or Coastal Zone Management Areas)? If your project is not located on the coast, you will likely check no.

CBRS - https://www.fws.gov/ecological-services/habitat-conservation/cbra/Maps/Mapper.html

CZMA - https://coast.noaa.gov/czm/mystate/

20. Is the proposal located on prime, important, unique or of local Importance

Farmland?

20a. Has NRCS completed a LESA? ☐ ☐

WSS: https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm

FPPA guidance available from NRCS:

https://www.nrcs.usda.gov/wps/portal/nrcs/main/national/landuse/fppa/ 20b. If yes to 20, is the project expected to benefit by saving or offsetting energy for a farm or agricultural producer?

21. Is the project expected to house, store, reclaim, recycle or involve the handling of hazardous materials, e.g. waste storage, disposal recovery, incineration or waste treatment actions? If yes explain.

https://websoilsurvey.sc.egov.usda.gov/App/HomePage.htm

22. Has a Phase 1 ESA been prepared for this site? Generally needed for all projects over $100,000 in which the agency takes a security interest in the property.

22a. If prepared, is Phase I ESA attached? ☐ ☐

23. Does the property contain any areas where regulated hazardous substances or petroleum products appear to have been released? If yes explain.

24. Does the property contain an underground storage tank (UST)? If yes explain and include: type, size, age, date of last state certification.

25. Does the property contain any aboveground storage tanks (AST)? If yes, are the ASTs in secondary containment?

26. Will or could the project have any emissions or cause uncontrolled or unpermitted releases of hazardous substances, pollutants, contaminants, petroleum or natural gas products? If yes explain.

27. Will the project affect any Water Resources (Sole Source Aquifers, Well-head protection areas, Watershed Protection Areas, etc.)? If yes, explain.

NEPA Assist: https://www.epa.gov/nepa/nepassist

EPA Sole Source Aquafers:

https://epa.maps.arcgis.com/apps/webappviewer/index.html?id=9ebb047ba3ec41ada1

877155fe31356b

28. Is there any controversy that you are aware of or about the project for environmental reason? If yes, explain.

29. Does the proposal have any concerns or disproportionately high and or adverse human health or environmental effects on minority populations or low-income populations? If yes, explain.

USDA policy: https://www.rd.usda.gov/files/1970e.pdf EJ Screen: https://www.epa.gov/ejscreen

30. Is the subject business facility connected to a municipal wastewater system?

If no, describe the existing on-site system, including capacity.

31. Is the subject business facility connected to a municipal water system?

If no, describe the existing on-site system, including capacity.

32. Is the project located in a county that has been designated by EPA as a Non-

Attainment or Maintenance for any of the National Ambient Air Quality Standards?

NEPA Assist: https://www.epa.gov/nepa/nepassist

EPA Greenbook: https://www3.epa.gov/airquality/greenbook/anayo_ak.html

33. SIGNATURE, DATE, & TITLE OF PREPARER

1 APPLICANT NAMERow1:
2 ADDRESS Physical location of the property include legal description if farmlandRow1:
4 DETAILED PROJECT DESCRIPTION Describe how proposed funds will be used If project involves construction whether interior or exterior or renovations please describe in detail For renewable energy systems such as solar panels be specific on type of system fixed tilt tracking mounting structure ie ballasted 3 pile driven concrete screws etcRow1:
5 SIZE OF THE PROJECT SITE Please indicate the size acres of your project and how the project will impact the site including roads right of ways utilities or other impacts Example Renewable energy solar project should include sq ft linear ft number of installed unitspanelsbuildings and details regarding any trenching or ground disturbance to be completedRow1:
6a If no ground disturbance please provide land use land ownership description ie industrial residential wooded grasslands etcRow1:
7 What is the zoning for the project locationRow1:
12a If so whenRow1:
12b Were any responses received and if yes provide details of responsesRow1:
13 Will the project be located within a Historic District If yes please provide reviewcommentsapproval from the local town historic districtRow1:
14a Is IPAC report attached:
detail below how many how large tree type etc:
18a If yes explain and indicate if the land managing agency has been contactedRow1:
22 Has a Phase 1 ESA been prepared for this site Generally needed for all:
24 Does the property contain an underground storage tank UST If yes:
undefined_6:
26 Will or could the project have any emissions or cause uncontrolled or:
undefined_8:
NEPA Assist httpswwwepagovnepanepassist:
undefined_9:
USDA policy httpswwwrdusdagovfiles1970epdf:
31 Is the subject business facility connected to a municipal water system:
MapN: Off
GroundDisturbanceY: Off
GroundDisturbanceN: Off
50YrsY: Off
50YrsN: Off
View50+Y: Off
View50+N: Off
HistoricY: Off
HistoricN: Off
SHPOY: Off
SHPON: Off
THPOY: Off
THPON: Off
HDY: Off
HDN: Off
EndSpeciesY: Off
EndSpeciesN: Off
IPACY: Off
IPACN: Off
TreesY: Off
TreesN: Off
TreeWaitY: Off
TreeWaitN: Off
WetlandY: Off
WetlandN: Off
WLMapY: Off
WLMapN: Off
ACY: Off
ACN: Off
FloodplainY: Off
FloodplainN: Off
FPMapY: Off
FPMapN: Off
ClassLandY: Off
ClassLandN: Off
CoastalY: Off
CoastalN: Off
FarmlandY: Off
FarmlandN: Off
NRCSY: Off
NRCSN: Off
20bY: Off
20bN: Off
21Y: Off
21N: Off
22Y: Off
22N: Off
22aY: Off
22aN: Off
23Y: Off
23N: Off
24Y: Off
24N: Off
25Y: Off
25N: Off
26Y: Off
26N: Off
27Y: Off
27N: Off
28Y: Off
28N: Off
29Y: Off
29N: Off
30Y: Off
30N: Off
31Y: Off
31N: Off
MapY: Off
32Y: Off
32N: Off
Date:
Title:
Text1:

File details come from the government source that posted it. Updated .