Enlcosure 6 Evaluation Factors.pdf

PDF 150 KB Posted

Attached to
Data Server Space - USACE
Solicitation number
1122334455
Issued by

About this file

This document is the Enclosure 6 to Solicitation No. DACW57-5-24-0066, which outlines the Evaluation Factors for a federal contract opportunity to lease approximately 1,600 square feet of data center space for the Army Corps of Engineers, Information Technology (ACE-IT) Department.

The key evaluation factors include: 1) Cost, based on rental rates, construction costs, and relocation expenses; 2) Technical factors such as availability of high bandwidth connections, redundant power and cooling, contiguous space and growth potential, and power flexibility; and 3) Physical factors such as floor plan/layout, security, ease of access, location in relation to power, neighborhood, and overall building appearance. The cost/price factor is approximately equal in importance to the combined non-cost factors. The related federal contract opportunity seeks to lease the data center space within the city limits of Hillsboro, Beaverton or Portland, Oregon for a 5-year term with 4 optional 1-year renewals.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ENCLOSURE 6 to SFO NO. DACW57-5-24-0066

EVALUATION FACTORS

1. COST – Based on best rental consideration on a fully-serviced lease (e.g. rent, janitorial services and supplies, utilities, and parking) and construction cost to include any potential Lessor contribution toward build out factored over the duration of the lease term. The Government will consider costs likely to be incurred through relocating, such as physical move costs, replication of tenant improvements and telecommunication infrastructure, and non-productive agency downtime.

2. TECHNICAL FACTORS – Applicant will be evaluated on their ability to meet the minimum required criteria outlined in the lease requirements which specifically include:

a. AVAILABILITY OF HIGH BANDWIDTH CONNECTIONS - Applicant will be evaluated on their ability to provide connectivity and access loops to Verizon Business, AT&T, Windstream , and Centurylink/Qwest circuits.

b. REDUNDANT POWER AND COOLING – Ability to provide redundant power and cooling as well as the method by which redundancy is provided.

c. CONTIGUOUS SPACE AND GROWTH POTENTIAL – Flexibility of data rack configuration and ability to support potential future growth.

d. POWER FLEXIBILITY – Ability of the applicant on the provisioning flexibility of 3-phase 208v and single phase 240v power.

3. PHYSICAL FACTORS

a. FLOOR PLAN/LAYOUT – An overall assessment of the efficiency and practicality of the floor plan. Ease of moving equipment from loading dock to leased space.

b. SECURITY - Physical security of the facility.

c. EASE OF ACCESS TO BUILDING – Ease of access to the site. Accessibility from a major street or distance from a major street.

d. LOCATION IN RELATION TO POWER – Location of facility i n relation to a major power substation reducing the probability of a loss of the main power supply.

e. NEIGHBORHOOD – Overall feel for the neighborhood around the site.

Consideration will be given to the known crime rate for the area, and the overall appearance of the neighborhood (i.e. presence of graffiti, vacant buildings, surrounding property upkeep, etc.).

f. OVERALL APPEARANCE OF BUILDING – Appearance of the exterior and common areas (parking lots, sidewalks, etc.) of the facility in relation to the general standards for similar properties in the community.

NOTE: All evaluation factors other than cost or price, when combined, are approximately equal in importance to cost or price.