This document is an Enclosure to a Solicitation for Offer (SFO) for a data center space lease. The key requirements include:
The Government is seeking to lease approximately 1,600 square feet of data center space to accommodate data processing equipment for the Army Corps of Engineers, Information Technology (ACE-IT) Department. The lease term is five (5) years, with one (1) year firm and four (4) rights to renew each subsequent year. The leased space must be located within the city limits of Hillsboro, Beaverton or Portland, Oregon and must meet specific technical and security requirements, such as full physical security, controlled building access, freight elevator, backup power and HVAC capabilities, fire suppression system, and carrier-neutral fiber connectivity. The Government requires the space to be fully secured, properly acclimated, and with power distribution units that can support up to 250 kWh/month. Progressive occupancy may be requested during the first year of the lease. The solicitation includes additional enclosures such as a Lease Proposal Worksheet, Sample U.S. Government Lease, and General Clauses.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ENCLOSURE 2 to SFO NO. DACW57-5-24-0066 Initial
ENCLOSURE 2 to SFO NO. DACW57-5-24-0066
LEASE REQUIREMENTS
Facility Requirements
1. General
a. Complete physical security is required for the entire facility at ALL times. This shall include, but is not limited to physical access control, cabling, facility monitoring, power equipment, transmission medium, HVAC and air quality systems, and fire protection and suppression systems.
b. Controlled building access must be provided at A LL times and government employees with proper credentials shall be permitted access at ANY time. Access reports shall be made available to the Government upon request.
c. If Government leased space is not on a ground level floor, a freight elevator capable of lifting a minimum of 3,000 lbs. is required. Elevator opening shall be a minim um of 48" wide x 90" tall and shall have a floor area of no less than 6' x 4'.
d. Floors should be able to support a minimum of 300 lbs per square foot.
e. Facility shall have facility maintenance point of contact accessible at ALL times to report building maintenance issues.
f. Facility shall support package and parcel delivery during normal business hours. Packages will be signed for, secured within an area accessible by the recipient, and recipient notified.
g. Facility shall have a small non-public conference room available to hold temporary vendor meetings on an infrequent basis. Conference room must have a telephone capable of conducting a conference call.
h. Facility must have a temporary staging area for equipment. A secured area is preferred.
Temporary staging area shall be provided with lighting capable of supplying a light level of 100 FC throughout the room.
i. Vendor must provide, at a minimum, one parking spot on the premises as needed by the Government.
j. Facility must provide full, continuous back up power and Uninterruptable Power Supply capabilities. Backup power shall have the capability to support all equipment for a minimum of, but not limited to, 72 hours without commercial power. The backup generator shall be capable of providing extended days of emergency power thru refueling from multiple suppliers without any interruptions of emergency power. The facility shall be capable of being placed on a priority fuel list, second to only hospitals, emergency response and law facilities. It is also required that the facility be provided with N+ 1 generating capability. Facility must inform the Government 7 days ahead of time of Generator test(s) being performed.
k. The facility must have a restroom available, at ALL times to, employees or representatives of the Government with access to the building.
l. All areas of the facility shall be made accessible to cellular signal through the use of cellular signal boosting systems unless cellular signal adequately penetrates the facility.
m. A loading dock, with access of sufficient size to accommodate vehicles from small trucks to semi-trailers is required. Loading dock and access shall be incorporated so it does not require blocking of street traffic lanes. Loading dock shall be connected to the data facility so equipment can be moved through interior hallways or passages. Hallways and passages shall be suitable for moving large, pallet mounted equipment.
n. Vendor must provide trash service.
o. The facility should comply with all current seismic codes and regulations in the area.
p. Vendor shall be capable of providing access to multi-vendor commercial fiber in a carrier neutral fashion. Vendor also must be located in an area that has sufficient access to major telecommunication providers and must allow at a minimum the following providers to service the Government Leased Space (GLS) with the following requirements.
• AT&T 500mb MPLS service delivered over Ethernet and 1 Gigabit Internet service delivered over Ethernet.
• Verizon Business 1 Gigabit MPLS service delivered over Ethernet.
• Centurylink I Qwest Long Distance, Toll Free ISDN PRI, and analog phone service.
• Windstream Communications local ISDN PRI service.
Hosting service shall provide fiber connectivity to the USACE incumbent local exchange carrier.
The hosting service shall also provide additional fiber connectivity to an alternate facilities based carrier authorized to provide "last mile" local loop facilities. Current service is provided by AT&T and Verizon Business.
2. Government Leased Space (GLS) Requirements
a. Vendor must provide approximately 1,600 SF of contiguous data center space to support approximately 50 equipment racks for the WPC Server Space and 6 racks for the NWP Server space. An additional 200 SF of non-exclusive storage space is required for equipment unpacking, setup and storage.
b. Space must be located on a single floor at ground level or higher.
c. Data center space leased to the Government must be fully secured (floor to ceiling) either by a locked cage or segregated in a locked and secured area accessible only by permitted personnel.
In facilities which a raised floor system is used, the cage must extend all the way to the solid floor.
d. GLS must be properly acclimated at ALL times as considered acceptable by industry standards for data center space.
e. Vendor shall furnish GLS with AC power distribution units with 208v, 3 phase power, with a capacity of no less than 250 kWh/mo.
f. GLS shall be provided with lighting capable of supplying a light level of 100 FC throughout the room.
g. GLS must have fire suppression which is a pre-action, dry pipe system. Smoke detection shall be accomplished using aspirating smoke detection. This is done using VESDA ® (Very Early Smoke Detection Apparatus).
h. Facility shall provide power supply cables to Government furnished equipment racks from redundant diverse circuits. The following should be used as a guideline for what is needed.
Racks Electrical (Each Rack is dual fed from separate power buses) 8 2 Post, Single phase 20 Amp
21 2 Post, Single phase 30 Amp 11 3 phase 30 Amp 5 3 phase 60 Amp 3 3 phase 80 Amp
8 additional full racks 19 additional circuits directly feed individual equipment. Majority are 2 post single phase 20 amp circuits-Need to be dual fed from separate power buses.