Summary

This is a Request for Proposal (RFP No. 2025/2026/06) issued by the City of Gallup, New Mexico, for comprehensive engineering services to design, manage, and deliver a new 115kV to 13.2kV substation in the Carbon Coal Road area. The project encompasses full turnkey responsibility including engineering design, procurement support, construction coordination, testing, commissioning, and project closeout. The City released the RFP on April 17, 2026, with a deadline for questions on May 11, 2026, and a response deadline of May 26, 2026, at 2:00 p.m. local time via the City's electronic procurement portal at https://procurement.opengov.com/portal/gallupnm. All proposals must be submitted electronically; no alternative submission methods are accepted. The contract is indefinite in duration with potential renewal for three additional one-year periods. The selected contractor will serve as the primary point of contact through a dedicated Project Manager and will assume sole responsibility for coordination of all engineering disciplines, subconsultants, and vendors.

Pricing shall be submitted as a separate cost proposal file and will be evaluated on competitiveness and value rather than lowest bid alone, with the lowest-cost responsive offeror receiving 10 points and others receiving proportional points based on the established formula. A State of New Mexico Resident Business preference of up to 8 percent of total points and a Resident Veterans Business preference of up to 10 percent are available to qualified entities with appropriate certification; joint proposals will have preferences reduced proportionally based on the percentage of work performed by non-resident businesses. Evaluation criteria include firm history and experience (20 points), capacity and capability to provide services (20 points), past record of performance and references (20 points), qualifications of key personnel (30 points), cost (10 points), and local/state/veterans preference (10 points), for a total of 100 base points with potential adjustments for preferences. Mandatory qualifications require the lead electrical engineer to be licensed in New Mexico and the lead firm or principals to have minimum 10 years of continuous experience in distribution, substations, transmission, or generation with knowledge of state and federal power system regulations. The firm must maintain Worker's Compensation Insurance (statutory coverage), Comprehensive General Liability Insurance ($1,000,000 each occurrence), and Comprehensive Automobile Liability Insurance ($1,000,000 each person/each accident). Technical proposals are limited to 25 numbered pages (excluding cover materials, resumes, insurance certificates, tax forms, and cost proposals), and all communications regarding the procurement must be conducted through the OpenGov platform's Question/Answer section.

View the file

Other files

File Type Posted
Gallup_Sample_RFP_Contract_2026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR PROPOSAL

RFP No. 2025/2026/06

ENGINEERING SERVICES FOR NEW CARBON COAL SUBSTATION –

DESIGN, PROJECT MANAGEMENT, AND FULL PROJECT DELIVERY

City of Gallup

110 W Aztec Ave.

Gallup, NM 87305

RELEASE DATE: April 17, 2026

DEADLINE FOR QUESTIONS: May 11, 2026

RESPONSE DEADLINE: May 26, 2026, 2:00 pm

RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:

Request For Proposal #RFP No. 2025/2026/06 Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery https://procurement.opengov.com/portal/gallupnm

City of Gallup

REQUEST FOR PROPOSAL

Engineering Services for New Carbon Coal Substation – Design, Project

Management, and Full Project Delivery

I. ADVERTISEMENT FOR PROPOSALS

II. GENERAL CONDITIONS

III. SUPPLEMENTAL TERMS AND CONDITIONS

IV. ESCALATION CLAUSE

V. ADDTITIONAL TERMS AND CONDITIONS

VI. SPECIAL TERMS AND CONDITIONS

VII. BACKGROUND INFORMATION & SCOPE OF WORK

VIII. SCOPE OF SERVICES

IX. PROPOSAL EVALUATION

X. PROPOSAL EVALUATION CRITERIA

XI. VENDOR QUESTIONNAIRE/PROPOSAL SUBMISSION

Attachments:

A - Gallup Sample RFP Contract 2026

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

1. ADVERTISEMENT FOR PROPOSALS

CITY OF GALLUP

Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project

Delivery CITY OF GALLUP, NEW MEXICO

REQUEST FOR PROPOSAL NO. RFP No. 2025/2026/06

1.1. Public Noltice

Public notice is hereby given that the City of Gallup, New Mexico, is accepting sealed proposals for the following:

As more particularly set out in the RFP documents, copies of which may be obtained via the City's eProcurement Portal. Copies are also available for viewing

Electronically submitted proposals shall be received via electronic bidding platform before2:00 pm(LOCAL TIME) on or beforeTuesday, May 26, 2026 where proposals will be received and recorded by the City of Gallup Purchasing Department via virtual conference/video calls or through other virtual means.

All solicitations will be released electronically through OpenGov; responses from must be submitted electronically through this online platform. By using OpenGov, prospective proponents will be provided with all information regarding a bid including addendums and changes to the project requirements. Register your company at City's eProcurement Portal;

OpenGov is a completely free service. Only ELECTRONICIALLY SUBMITTED PROPOSALS will now be accepted; system will not accept proposals submitted AFTER due date and time.

Plans, Specifications, and Proposal Documents may be examined at the office of the Purchasing

Director located at 110 West Aztec, Gallup, NM 87301, phone number (505) 863-1334.

Additional information regarding this bid may also be viewed at: https://procurement.opengov.com/portal/gallupnm/projects/256409.

Dated: 14th of April, 2026

By:/S/ By: Marc DePauli , Mayor

Classified Legal Column:

Albuquerque Journnal Publishing Date: Sunday-April 19,2026 https://procurement.opengov.com/portal/gallupnm/projects/256409

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

Gallup Sun Publishing Date: Sunday-April 17, 2026

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

2. GENERAL CONDITIONS

2.1. PROJECT

The City of Gallup is inviting qualified providers to submit proposals to provide Engineering Services for

New Carbon Coal Substation – Design, Project Management, and Full Project Delivery in Gallup NM.

2.2. ELECTRONIC PROPOSALS

All proposal must be submitted ELECTRONICIALLY via CIty's eProcurement Portal, the City of Gallup’s electronic bid/proposal platform at https://procurement.opengov.com/portal/gallupnm prior to the time specified for the proposal opening. System will not accept proposals submitted after due date and time. Proposal must be submitted using the proposal document forms furnished by the City of

Gallup. Receipt of proposals will be acknowledged and recorded electronically in the Purchasing

Department via virtual means. Meeting information will be posted via the City's eProcurement Portal in the timeline section of this specific solicitation, via addendum or notice posted to the eProcurement

Portal.

2.3. PROPOSAL OPENING DATE AND TIME

Proposla shall be received until Tuesday, May 26, 2026 at 5:00 pm local time via the City's eProcurement

Portal.

2.4. NON-DISCRIMINATION:

The City of Gallup does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in the employment or provision of services. Contractors shall be in compliance with ADA requirements.

2.5. MODIFICATIONS OR WITHDRAWAL

Proposals deposited with the City may be withdrawn or modified prior to the time set for opening of proposals via the City's eProcurement Portal. Offerors submitting proposals may be afforded an opportunity for discussion and revision after submission and prior to award for the purpose of obtaining best and final offers.

2.6. PROPOSAL OPENING

The opening of proposals shall be conducted in private to maintain the confidentiality of the contents of all proposals. Proposals will remain confidential during the negotiation process.

These documents constitute a “Request for Proposal” or RFP. It is a request for an offer. As such, it allows alternate offers or proposals to be considered and the terms and conditions may be subject to negotiations to reach best and final offers. All information requested for submittal should be included with the offer, and exceptions or alternates clearly noted.

2.7. INQUIRIES

Communications regarding this procurement, including issuance of amendments, may be conducted by electronic means via the City's eProcurement Platform. Electronic submittals of the proposal whether by fax or other electronic means are NOT acceptable; proposals shall ONLY be electronically submitted through the City's eProcurement Platform as previously stated in the General Conditions.

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

The only approved contact shall be with the above referenced purchasing individual via the Question/Answer process of the City's eProcurement Portal. Offerors making contact with any other City official, evaluation committee member, or other City employee regarding this RFP may be disqualified.

Offerors shall have no claim against the City for failure to obtain information made available by the City which the Offeror could have remedied through the exercise of due diligence.

2.8. AMENDMENTS:

If any questions or responses require revision to the solicitation as originally published, such revisions will be by Formal Addendum only. If the solicitation includes a contact person for technical information, Offerors are cautioned that any oral or written presentations made by this or any person that appear to change materially any portion of the solicitation shall nor be relied upon unless subsequently ratified by a Written Amendment to this solicitation issued by the Purchasing Office. For determination as to whether any representation made requires that an amendment be issued, contact the Purchasing

Office.

2.9. CONFIDENTIALITY

Offerors may request in writing non-disclosure of confidential data. Such data should accompany the proposal and be readily separable from the proposal in order to facilitate eventual public inspection of the non-confidential portion of the data.

2.10. NEGOTIATIONS:

Negotiations may be conducted with all responsible Offerors who submit proposals found to be reasonably likely to be selected for award. Offerors submitting proposals may be afforded an opportunity for discussion and revision after submission and prior to award for the purpose of obtaining best and final offers. After obtaining best and final offers, the award shall be made to the responsible

Offeror(s) whose proposals are most advantageous to the City of Gallup.

Proposals shall be evaluated on the basis of demonstrated competence and qualification for the type of service required, and based on the criteria set forth in the Request for Proposal. For purposes of conducting discussions, proposals may initially be classified as:

A. Acceptable

B. Potentially acceptable, that is, reasonably likely of being made acceptable or;

C. Unacceptable

The review committee will evaluate all proposals, determine the need for, and conduct any negotiations. Negotiations may be conducted to:

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

A. Promote understanding of the City’s requirements and the Offeror’s proposal.

B. Obtaining best and final offers.

C. Facilitate arrival at a contract that will be most advantageous to the City of Gallup taking into account the factors set forth in the proposal.

The City is under no obligation to conduct any negotiations or discussions with an Offeror.

The City of Gallup’s designee shall negotiate a contract with the Highest Qualified Offeror at compensation determined in writing to be fair and reasonable, taking into account the estimated value of the services and the scope, complexity and nature of the services.

Should the designee be unable to negotiate a satisfactory contract with the Offerors considered to be the most qualified at a price determined to be fair and reasonable, negotiations with that business shall be terminated. Negotiations shall then be undertaken with the second most qualified business. This process shall continue until a satisfactory contract is negotiated with a qualified business or the procurement process is terminated and a new Request for Proposal is initiated.

If the highest ranked Offeror cannot fulfill the conditions as outlined the award will go to the next highest ranked responsible Offeror whose offer was judged responsive.

This request and all attachments will be considered part of the resultant contract and/or purchase order.

2.11. TAXES

The proposal total shall exclude all applicable taxes. The City will pay any taxes due on the contract based upon billing submitted by the contractor, at the applicable tax rate. Taxes shall be shown as a separate amount on any billing or request for payment. The City of Gallup is non-taxable on tangible goods.

2.12. APPROPRIATIONS

The terms of this agreement are contingent upon sufficient monies being made available by the City of Gallup for the performance of this agreement. If sufficient appropriations and authorizations are not made by the City of Gallup, this agreement shall terminate upon written notice being given by the City to the contractor. The City’s decision as to whether sufficient appropriations are available shall be accepted by the contractor and shall be final.

2.13. MANDATORY REQUIREMENTS:

Mandatory requirements may be waived by the evaluation committee if all the otherwise responsive

Offerors failed to comply with the same mandatory requirement and the failure to do so does not

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery otherwise materially affect the procurement. The evaluation committee shall have the right to request subsequent information from the otherwise responsive Offerors.

2.14. SPECIFICATIONS:

If, in the opinion of the evaluation committee a specification is poorly worded or confusing, the evaluation committee may waive the specification for all Offerors, and if points were assigned reduce the total points by the number of points assigned to the specification.

2.15. CONTRACT TERMS AND CONDITIONS

The contract between the City and Offeror will follow the format specified by the City and contain the terms and conditions set forth in this RFP. The contents of this RFP, as revised and/or supplemented, and the successful Offeror’s proposal will be incorporated into the contract. Should an Offeror object to any of the City’s terms and conditions, that offeror must propose specific alternative language that would be acceptable to the City. Offerors must provide a brief discussion of the purpose and impact, if any, of each proposed change followed by the specific proposed alternate wording. General references to the Offeror’s terms and conditions or attempts at complete substitutions are not acceptable to the

City and will result in disqualification of the Offeror’s proposal.

2.16. OFFEROR’S TERMS AND CONDITIONS:

Offerors must submit with the proposal a complete set of any additional terms and conditions which they expect to have included in a contract negotiated with the City. Any additional terms and conditions which may be the subject of negotiation, will be discussed only between the City and the selected Offeror and shall not be deemed an opportunity to amend the Offeror’s proposal.

2.17. PROCUREMENT CODE VIOLATIONS

The Procurement Code imposes civil and criminal penalties for its violation. In addition, the New Mexico

Statutes impose felony penalties for illegal bribes, gratuities, and kick-backs.

2.18. AWARD

The award shall be made to the responsible and responsive Offeror of Offerors whose proposal is most advantageous to the City of Gallup, taking into consideration the evaluation factors set forth in the Request for Proposals.

2.19. PREFERENCES

A preference of the total points used in evaluating the Request for Proposal shall be awarded to a City of Gallup Resident Business in accordance with the City of Gallup Resident Business Ordinance.

A preference of the total points used in evaluating the Request for Proposal shall be awarded to a business that has registered with the State of New Mexico Department of Taxation and Revenue as a resident New Mexico business or Resident New Mexico Veteran’s business, and in any case shall be applied in accordance with the provisions of New Mexico Statute 13-1-21 and 13-1-22 NMSA 1978.

The City of Gallup Resident Business preference, State of New Mexico Resident Business Preference, or State of New Mexico Resident Veteran’s Business will be factored into the Request for Proposal scores where applicable. However, the preferences are not cumulative and no offeror will receive more than one of the applicable preferences.

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

For information on State of New Mexico resident business or veteran’s resident business bidder’s certification call 505‐827‐0951 or to download applications at:

http://www.tax.newmexico.gov/Businesses/in-state-veteran-preference- certification.aspx

You must submit a copy of your NM Resident Business or Resident Veteran’s Business Certificate with proposal in order to qualify for the New Mexico Residence preference.

2.20. PROTESTS

Any bidder or offeror who is aggrieved in connection with a solicitation or award of a contract may protest to the central purchasing office. The protest must be submitted in writing within seven (7) calendar days after knowledge of the facts or occurrences giving rise thereto. Any protest based on the terms of this Request for Competitive Sealed Bid Proposals will be conclusively deemed waived if an Offeror does not specifically raise and address the protest its bid proposal submitted to the City’s Procurement Office. All Offerors will be conclusively deemed to have knowledge of the facts or occurrences giving rise to a protest respecting an award at the time a contract is awarded by the City to an Offeror or Offeror.

2.21. NOTICE TO OFFERORS

Unnecessarily elaborate responses beyond that sufficient to present a complete and effective response to the solicitations are not desired and may be construed as an indication of the Offeror’s lack of cost consciousness. Unless specifically requested in the solicitation, elaborate art work, corporate brochures, lengthy narratives, expensive paper, specialized binding, and other extraneous presentation materials are neither necessary nor desired.

THE CITY RESERVES THE RIGHT TO REJECT ANY OR ALL PROPOSALS IN WHOLE OR IN PART, TO WAIVE INFORMALITIES OR TECHNICALITIES AT ITS OPTION, AND TO ACCEPT THE PROPOSAL IT DEEMS TO BE

IN THE BEST INTEREST OF THE CITY OF GALLUP.

2.22. NOTICE TO BIDDERS

As of October 5, 2011 applications for Resident New Mexico in-state bidders will no longer be processed through the State Purchasing Division. All resident business and contractors will have to obtain a new preference number with the New Mexico Department of Taxation and Revenue as of January 1, 2012.

It will be the sole responsibility of the Bidders requesting consideration for the New Mexico Resident Business Preference to obtain approval and a certification from the New Mexico Department of Taxation & Revenue prior to the bid opening date. You must furnish a copy of the Resident Business Certificate with each proposal in order to be considered for the in-state preference.

As of July 1, 2012 a New Mexico Resident Veteran’s Business preference number may be obtained from the New Mexico Department Taxation and Revenue Department. In order to be considered for the New Mexico Veteran’s Business preference a copy of the Certificate must be included with each proposal as per Sections 13-1-22 (A) NMSA 1978.

http://www.tax.newmexico.gov/Businesses/in-state-veteran-preference-%20%20%20%20certification.aspx

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

For additional information please call 505-827-0951, or to download applications log on at:

http://www.tax.newmexico.gov/Businesses/in-state-veteran-preference-certification.aspx http://www.tax.newmexico.gov/Businesses/in-state-veteran-preference-certification.aspx

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

3. SUPPLEMENTAL TERMS AND CONDITIONS

3.1. ELECTRONIC COMMUNICATIONS

Communications regarding this procurement, including issuance of any amendments, shall submitted through the OpenGov eProcurement Portal Q&A section: eProcurement Portal. However, electronic submittals of the proposal whether by fax or other electronic means are not acceptable as noted in the

General Conditions.

3.2. UNIT PRICES

Typographical errors, errors in extending unit prices, arithmetic errors or errors clearly evident on the face of the bid document may be corrected in accordance with the Procurement Ordinance and

Procurement Regulations. Discrepancies involving the incorrect extension of unit prices shall be resolved in favor of unit prices as unit prices cannot be corrected.

3.3. CONTRACT TERM RENEWAL

This is an indefinite quantity contract from the date of contract acceptance and may renew for three

(3) additional one (1) year period unless sooner terminated in accordance with the terms and conditions of this bid. If the lowest qualified bidder is unable to fulfill an order or bidder’s prices exceed market prices the City reserves the right to surpass this bid and order from the best available source.

3.4. QUANTITIES

This is an indefinite quantity contract from which the City may place orders on an as needed basis.

Quantities listed are estimates of the City's needs on an annual basis. Actual usage may vary. The City does not guarantee the purchase of any specific minimum quantities, nor may any material be shipped or delivered without a valid purchase order number issued by the City.

3.5. EXISTING AGREEMENT

Under the terms and conditions of this bid, all public bodies allowed by law may procure the supplies or services under this bid as described herein. The terms and conditions of this bid shall form a part of each order issued herein. Each public body shall be responsible for their own orders and the City of Gallup accepts no responsibility for other entities.

3.6. ACKNOWLEDGEMENT OF RECIEPT

The Acknowledgment of Receipt should be signed and returned to the Purchasing Office as soon as possible but no later than 5:00 pmlocal time on Monday, May 11, 2026. Only potential bidders who elect to return this form completed with the indicated intention of submitting a bid will receive copies of all written questions and the City’s written responses to those questions as well as copies of

Amendments, if any are issued.

3.7. REQUEST FOR PROPOSAL DOCUMENTS

RFP documents may be retrieved by accessing the Purchasing page of the City of Gallup bidding website

OpenGov https://procurement.opengov.com/portal/gallupnm/projects/256409, by calling (505) 863-

1334 or visiting the Central Purchasing Office at 110 West Aztec, Gallup, NM 87301.

https://procurement.opengov.com/portal/gallupnm/projects/256409

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

The City of Gallup will notify vendors of record of amendments/addenda that are issued via City's eprocurement software OpenGov. If not a vendor of record or if solicitation was downloaded through

City of Gallup website, it shall be vendor’s responsibility to check website frequently for copies of any addenda/amendments or correspondence concerning the solicitation. Failure to acknowledge all addenda could result in rejection of your bid/proposal as non-responsive. In the case of an inconsistency between information on this site and the Purchasing file document, the file document shall prevail.

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

4. ESCALATION CLAUSE

4.1. ESCALATION CLAUSE

Price escalations may be considered only under the following conditions:

A. Offered prices must be firm for at least ninety (90) calendar days after written notification of contract.

B. All requests for price increases shall be in writing and accompanied by:

1. A letter from the Contractor’s supplier certifying the price increase to the Contractor; or

2. Evidence of verifiable market conditions resulting in increased costs such as mandated labor rate increases and significant fuel or energy cost increases.

C. All invoices of the offered items, from suppliers to the Offeror, shall be subject to auditing by the City and furnished without delay upon request.

D. The City reserves the right to purchase on the open market or cancel a contract resulting from this request and solicit a new contract if the escalated price is above the current open market price for the same item. Cancellation of the contract shall not affect any outstanding orders.

E. All revisions of the price list shall become effective when they are accepted by the Purchasing

Office of the City, provided that they do not conflict with paragraph (F) or (G).

F. All approved price changes resulting from this escalation clause shall be firm for a period of ninety (90) calendar days after acceptance in writing from the City.

G. The Offeror shall be limited to a maximum of two (2) price escalations per contract period unless otherwise specified in this request.

H. The Offeror shall provide to the City written notice of any requested price changes, which shall become effective upon acceptance by the City of Gallup Purchasing Office.

I. If the Offeror receives any price de-escalations from the supplier of goods sold to the City through a contract resulting from this request, the Offeror is responsible for notifying the City of such de-escalations, and passing those price changes on to the City immediately.

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

5. ADDTITIONAL TERMS AND CONDITIONS

5.1. DEBARRED OR SUSPENDED CONTRACTORS

A business (contractor, subcontractor or supplier) that has either been debarred or suspended pursuant to the requirements of .13-1-177 through .13-1-180, and .13-4-11 through .13-4-17 NMSA 1978 as amended, shall not be permitted to do business with City of Gallup and shall not be considered for award of the contract during the period for which it is debarred or suspended.

5.2. ASSIGNMENT

Neither the order, nor any interest therein, nor claim there under, shall be assigned or transferred by the Vendor, except as expressly authorized in writing by the City of Gallup Procurement Administrator.

No such assignment or transfer shall relieve the Vendor from the obligations and liabilities under this order.

Vendor agrees that any and all claims for overcharge resulting from antitrust violations which are borne by the City of Gallup as to goods, services, and materials purchased in connection with this bid are hereby assigned to the City of Gallup.

5.3. INSPECTION

Final inspection and acceptance will be made at the site. Goods rejected at the site for non-conformance with specifications shall be removed, at the Vendor's risk and expense, promptly after notice of rejection.

5.4. INSPECTION OF PLANT

The City of Gallup Procurement Administrator may inspect, at any reasonable time, the part of the contractor's, or any subcontractor's plant or place of business, which is related to the performance of this contract.

5.5. LIABILITY

The Vendor agrees that City of Gallup shall not be held liable for any costs incurred in preparation of this

RFP.

5.6. DEFAULT

The City of Gallup reserves the right to cancel all or any part of services without cost to the City of

Gallup, if the Contractor fails to meet the provisions of this order and, except as otherwise provided herein, to hold the Contractor liable for any excess costs if failure to perform the order arises out of causes beyond the control and without the fault or negligence of the Vendor, such causes include but are not restricted to acts of God or the public enemy, acts of the State or Federal government, fires, floods, epidemics, quarantine restrictions, strikes, freight embargoes, unusually severe weather, and defaults of subcontractors due to any of the above, unless the City of Gallup shall determine that the supplies or services to be furnished by the subcontractor were obtainable from other sources in sufficient time to permit the Contractor to meet the required delivery schedule. The rights and remedies

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery of the City of Gallup provided in this paragraph shall not be exclusive and are in addition to any other rights now being provided by law or under this order.

5.7. NON-COLLUSION

In, signing this proposal, the Contractor certifies that he/she has not, either directly or indirectly, entered into any action in constraint of free competitive bidding in connection with this proposal submitted to the City of Gallup Procurement Administrator.

5.8. NON-DISCRIMINATION

Vendors doing business with City of Gallup must be in compliance with the Federal Civil Rights Act of

1964 and Title VII of the Act, (Rev.,1979), and the Americans Disabilities Act of 1990. (Public Law 101-

336).

5.9. METHOD OF AWARD

A contract will be awarded on a Total All or None basis where indicated based on pricing and compliance with the specifications and requirements for each group of materials. City of Gallup reserves the right to waive irregularities, reject offers in whole or in part, and award this Bid in the best interest of the City of

Gallup.

5.10. RIGHT TO DISCONTINUE PROCUREMENT

The City of Gallup reserves the right to cancel this Request for Proposal at any time, and to reject any or all proposals, or otherwise to proceed in the best interests of the City of Gallup. This in no manner obligates the City of Gallup or any of its agencies to the eventual purchase of any product or service, whether explicitly described or implied herein, until confirmed by a written contract and/or Purchase

Order.

5.11. LATE PROPOSALS

Any proposal received after the specified time and date will be declared a "Late Proposal" and will NOT be considered.

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

6. SPECIAL TERMS AND CONDITIONS

6.1. LAWS / CODES / STANDARDS / REGULATIONS

Contractor will be responsible for complying with all applicable local, state and federal regulations regarding transportation of materials, as well as all fees, permits and/or authorization required for delivery. Contractor will provide all supervision of employees required and be responsible for maintenance, insurance, mileage, fuel, permits, licenses, etc. required for the operation of the vehicles or equipment used for transportation. These requirements and all associated costs for providing the services shall be included in the bid price.

Equipment materials, or services supplied under this solicitation shall meet and comply will all current applicable Federal, State, and local laws, codes, standards, and regulations, and applicable industry safety standards and requirements.

The Contractor shall be properly licensed and qualified to furnish services and to perform the required work under applicable licensing statutes of the State of New Mexico and other applicable regulatory agencies.

Contractor shall comply with all applicable Federal, State and local government codes, laws, regulations, and requirements in the performance of the work described herein.

6.2. INDEPENDENT CONTRACTOR

The proposal awarded an agreement under this solicitation is an independent contractor and shall perform its obligations under this agreement, as it deems necessary and appropriate. The successful

Contractor and its officers, directors, agents and employees, are independent contractors performing services for the City of Gallup and are not employees of the City of Gallup. The successful Contractor, and its officers, directors, agents, and employees, shall not accrue leave, retirement, insurance bonding, use of City of Gallup vehicles or any other benefits afforded to employees of the City of Gallup. The successful Contractor covenants that it presently has no interest, and shall not acquire any interest, direct or indirect, financial or otherwise, which would conflict in any manner or degree with the performance of the required services.

6.3. INDEMNITY

The Contractor agrees, as material consideration for this Agreement, to defend, indemnify, and hold harmless the City of Gallup, its Elected Officials, Agents, and employees from and against any and all claims arising out of any asserted negligent act, error or omission of the Contractor, its officers, directors, employees or agents or arising in any way from this agreement or the Contractor’s activities hereunder. The indemnity agreed to in this paragraph shall not extend to liabilities, claims, damages, losses or expenses, including attorney fees arising out of: The preparation or approval of maps, drawings, opinions, reports, surveys, change orders, designs or specifications by the City of Gallup, or the agents or employees of the City of Gallup, or the giving of or the failure to give directions or instructions by the City of Gallup, or the agents or employees of the City of Gallup, where such giving or failure to give directions or instructions is the primary cause of bodily injury to persons or damage to property.

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

6.4. TERMINATION OF CONTRACT

In the event of a breach on any provision of the Agreement, the City of Gallup shall notify the Contractor of the fault within a reasonable time. If the Contractor fails to cure the breach or make other arrangements satisfactory to the City of Gallup, the City of Gallup may immediately terminate the Price

Agreement or take other steps, as it deems necessary. Safety related items must be corrected within twenty-four (24) hours. The Contractor shall pay the City of Gallup all costs and expenses, including reasonable attorney’s fees incurred by the City of Gallup, in exercising any of its rights or remedies in connection with enforcement of the Agreement.

The City of Gallup may terminate this Agreement for Convenience at any time, without penalty of any kind, by giving notice in writing to the Contractor. Said termination shall not nullify any payments due contractor for costs and work completed incurred through the date of termination.

6.5. APPROPRIATIONS

The terms of this Agreement are contingent upon sufficient monies being made available by the City of

Gallup for the performance of this Agreement. If sufficient appropriations and authorizations are not made by the City of Gallup, this Agreement shall terminate upon written notice being given by the City to the Contractor. The City's decision as to whether sufficient appropriations are available shall be accepted by the Contractor and shall be final.

6.6. GOVERNING LAW

The contract awarded to a Contractor as a result of this solicitation shall be governed in accordance with the laws of the State of New Mexico and the City of Gallup Ordinances.

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

7. BACKGROUND INFORMATION & SCOPE OF WORK

7.1. SUMMARY

The City of Gallup is soliciting proposals from qualified firms to provide comprehensive engineering, design, coordination, and construction support services for the development of a new 115kV to 13.2kV substation in the Carbon Coal Road area. This project is being advanced as a capital improvement initiative by the Electric Department and is intended to support long-term system reliability, load growth, and regional economic development. The City intends to procure a highly qualified firm capable of delivering a fully constructible, coordinated, and schedule-driven project, with clear accountability for all aspects of design, integration, and project execution.

7.2. SCOPE OF SERVICES

PLEASE SEE FOLLOWING SCOPE OF SERVICES SECTION

7.3. SUBCONTRACTS AND OTHER CONTRACTUAL ARRANGEMENTS

The use of subcontracts or other contractual arrangements to provide the requested services is permitted. The City, however, is looking for a single contracting entity that provides a technically and financially capable firm to be fully responsible to the City for all contractual obligations.

All existing or anticipated subcontracting and other arrangements relating to the entity that will contract with the City and to the services to be provided by such entity must be fully and clearly disclosed in proposals and are subject to further clarification by the Offeror, and the review and approval by the City.

7.4. INSURANCE REQUIREMENTS

The Contractor or their subcontractor shall not commence work under this contract until their subcontractors have obtained the insurance required under this paragraph, and certificates of insurance coverage have been filed with and approved by the Owner. All Certificates of

Insurance required herein shall state that ten (10) days written notice will be given to the

Owner before the policy is cancelled or changed. Extent of insurance carried and minimum coverage shall be as follows:

• Worker's Compensation Insurance: The Contractor shall obtain and keep in force during the life of the contract, Worker's Compensation Insurance covering all their employees engaged in work under this contract; and if any portion of the work is sublet, the subcontractor shall carry similar coverage for all of their employees engaged in the project. Worker's Compensation Insurance shall provide coverage for not less than the following amounts or greater where required by law:

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

Workers' Compensation: Statutory

Employer's Liability: $1,000,000

• Comprehensive General Liability Insurance: The Contractor and his/her subcontractor shall obtain and maintain in effect during the life of the contract, Comprehensive

General Liability Insurance including premise/operations; explosion, collapse and underground property damage; products/completed operations, broad form contractual independent contractors, broad form property damage and personal injury liabilities:

Bodily Injury: $1,000,0000 each occurrence

$1,000,000 annual aggregate

Property Damage: $1,000,000 each occurrence

$1,000,000 annual aggregate

Personal Injury, with

Employment exclusion deleted: $1,000,000 annual aggregate

• Comprehensive Automobile Liability Insurance: The Contractor and his/her subcontractors shall obtain and maintain in effect during the life of the contract comprehensive automobile liability insurance including all owned (private and others) hired and non-owned vehicles:

Bodily Injury: $1,000,000 each person

$1,000,000 each accident

Property Damage: $1,000,000 each occurrence

7.5. Response Format and Organization

A. Number of Responses/Copies

1. Offerors shall provide one (1) electronically submitted copy via solicitation online platform at https://procurement.opengov.com/portal/gallupnm

B. Proposal Format

1. The proposal shall be limited in format and length; length of the proposal shall be limited to a maximum of twenty-five (25) numbered pages. If there are any question as to format

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery requirements contact the Purchasing Director at purch@gallupnm.gov for clarification, prior to submittal of the proposal.

a. Material excluded from the twenty-five (25) page maximum count is limited to:

b. Front cover (photos with captions on inside cover allowed)

c. Divider pages (blank except for title information)

d. Back cover (photos with captions on inside of back cover allowed)

e. Tables of Contents page (two-page maximum)

f. Letter of Transmittal

g. Resumes

h. Certificate(s) of insurance

i. Copy of New Mexico Resident Preference Certificate (if applicable)

j. Current I.R.S. W-9 Form

k. Cost Proposal (Separate File)

C. Submit Responses to the PROPOSAL EVALUATION CRITERIA (Section 6) and organized in the same order as follows:

1. Firm History and Experience:

a. Firm Background and Organizational Stability:

i. Please provide a comprehensive description of your firm’s history, including the number of years in operation, ownership structure, and overall financial strength.

Additionally, explain how these factors demonstrate your organization’s long-term stability and its capacity to successfully deliver large-scale, capital-intensive electrical infrastructure projects

b. Relevant Turnkey Project Experience:

i. Demonstrated experience in delivering turnkey substation projects, particularly those involving 115kV to 13.2kV (or similar voltage class) systems. Submittals should include:

I. Project name, location, and completion date

II. Voltage class and configuration

III. Scope of services performed (engineering, procurement, construction, commissioning)

IV. Role of the firm (prime contractor, joint venture, subcontractor)

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

V. Project size (cost) and duration

c. Experience with Comparable Scope and Technical Complexity:

i. Proven experience with projects that include:

I. High-voltage (115kV) design and equipment specification

II. Power transformers, breakers, and switchgear integration

III. Protection and control systems (including SCADA integration)

IV. Civil, structural, and site development design

V. Testing, commissioning, and energization

2. Capacity and Capability to Provide Service:

a. Organizational Capacity

i. Adequacy of staffing levels to support all phases of the project (engineering, design, procurement, construction support, commissioning).

ii. Availability of key personnel throughout the project duration.

iii. Ability to manage multiple concurrent projects without impacting performance.

b. Technical Expertise and Resources

i. Demonstrated expertise in high-voltage substation design (115kV and above) and medium-voltage distribution systems (13.2kV or similar).

ii. In-house capabilities across relevant disciplines (electrical, civil, structural, protection & control, SCADA, geotechnical, etc.).

iii. Access to specialized tools, software, and technologies required for analysis, modeling, and design.

c. Project Management Capability

i. Strength and clarity of project management approach, including scheduling, cost control, quality assurance/quality control (QA/QC), and risk management.

ii. Experience with turnkey project delivery, including coordination with utilities, regulatory agencies, and contractors.

iii. Ability to meet project timelines and milestones.

d. Construction and Field Support

i. Capability to provide construction management, inspection, and field engineering support.

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

ii. Experience supporting installation, testing, and commissioning of substations.

iii. Approach to resolving field issues and minimizing delays.

e. Subconsultant and Vendor Management

i. Ability to effectively manage subconsultants, suppliers, and contractors.

ii. Established relationships with equipment manufacturers and vendors relevant to substation development.

iii. Procurement and supply chain management capabilities.

f. Past Performance Demonstrating Capacity

i. Successful completion of similar projects in size, scope, and complexity.

ii. Evidence of delivering projects on schedule and within budget.

g. Current Workload and Availability

i. Firm’s current and projected workload.

ii. Demonstrated ability to allocate sufficient resources to this project.

iii. Commitment to prioritize the project as required

3. Past Record of Performance/References:

a. Performance on Past Projects

i. Demonstrated record of successfully delivering projects:

I. On schedule

II. Within budget

III. With minimal change orders and claims

IV. With high-quality workmanship and documentation

ii. Client References

I. Quality and relevance of references from utilities, municipalities, or industrial clients for similar turnkey substation projects. References should address:

I. Overall performance

II. Responsiveness and communication

III. Problem-solving capability

IV. Ability to manage subcontractors and stakeholders

II. Regulatory and Standards Expertise

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

I. Familiarity with and successful application of applicable codes and standards (e.g., IEEE, NEC, NESC, local utility and regulatory requirements), including permitting and environmental compliance.

III. Safety Performance and Culture

I. Demonstrated commitment to safety, including:

I. OSHA recordable incident rates

II. Experience Modification Rate (EMR)

III. Safety programs specific to high-voltage construction environments

IV. History of safe project delivery

4. Qualifications of Key Personnel:

a. Relevant Experience

i. Demonstrated experience of key personnel in the design, engineering, and construction support of electrical substations of similar voltage class (115 kV and above).

ii. Proven involvement in turnkey substation projects.

iii. Experience with utility, municipal, or cooperative power systems.

b. Technical Expertise

i. Depth of knowledge in substation design, including:

I. High-voltage equipment specification and layout

II. Protection and control systems

III. SCADA integration

IV. Relay coordination and studies

V. Grounding, lightning protection, and insulation coordination

Familiarity with applicable industry standards (e.g., IEEE, NEC, NESC).

c. Roles and Responsibilities

i. Clarity in defining roles of key personnel such as:

I. Project Manager

II. Lead Electrical Engineer

III. Protection & Control Engineer

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

IV. Civil/Structural Engineer

V. Construction Manager

ii. Appropriateness of staffing plan relative to project scope and complexity.

d. Professional Credentials

i. Relevant licenses and certifications (e.g., Professional Engineer (PE) licensure).

ii. Specialized training or certifications in substation design, safety, or project management (e.g., PMP).

e. Project Management Capability

i. Demonstrated ability of the Project Manager to deliver projects on time and within budget.

ii. Experience managing multidisciplinary teams and coordinating with stakeholders, including utilities, regulators, and contractors.

f. Past Performance

i. Documented success of key personnel on similar projects, including references and outcomes.

ii. History of delivering high-quality work with minimal change orders or delays.

g. Availability and Commitment

i. Availability of proposed personnel for the duration of the project.

ii. Commitment to continuity of key staff throughout the project lifecycle.

5. Cost: Provide cost proposal in a separate file.

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

8. SCOPE OF SERVICES

8.1. Scope of Services

PROJECT OBJECTIVE

The objective of this procurement is to engage a qualified engineering firm (PROVIDER) to deliver a fully designed, coordinated, and new constructible 115kV to 13.2kV substation capable of supporting anticipated load growth within the Carbon Coal area. The completed facility shall include all systems necessary for safe, reliable, and long-term operation and shall be developed to ensure full compatibility with the City’s existing electrical system.

All plans, specifications, and supporting documents shall be prepared with a high degree of accuracy and constructability, ensuring the project can be constructed efficiently without the need for significant field redesign or correction.

DELIVERY METHOD AND PROVIDER RESPONSIBILITIES

The project shall be delivered as a turn-key design, requiring the Provider to assume full responsibility for the engineering, coordination, and successful delivery design of the project. This includes design, project management, procurement support, construction coordination, commissioning support, and project closeout. The Provider shall be accountable for delivering a complete, fully integrated, and constructible facility.

The Provider shall designate a dedicated Project Manager at the time of proposal submission. The

Project Manager shall serve as the primary point of contact for the City and shall be responsible for overall project execution, including schedule management, coordination of all disciplines, and delivery of all project milestones. The Project Manager shall remain actively engaged throughout the duration of the project, attend all required meetings, including weekly coordination meetings, and provide timely and effective responses to City inquiries, submittals, and project-related issues.

The assigned Project Manager shall not be replaced without prior written approval from the City. The

City reserves the right to require replacement in the event of non-performance. Failure to provide consistent and effective project management, including lack of responsiveness or inadequate coordination, shall constitute a material breach of contract.

The Provider shall be solely responsible for the full coordination of all engineering disciplines, subconsultants, vendors, and project stakeholders. No additional compensation shall be granted for coordination failures, design conflicts, omissions, errors, or integration deficiencies. The Provider shall deliver a complete, fully coordinated, and construction-ready design that ensures all systems function together as an integrated whole.

CITY-FURNISHED MATERIALS AND PROCUREMENT REQUIREMENTS

Title: Engineering Services for New Carbon Coal Substation – Design, Project Management, and Full Project Delivery

All materials and equipment associated with the project shall be procured by the City of Gallup in accordance with applicable procurement regulations and OpenGov procedures unless otherwise authorized in writing. The Provider shall be responsible for developing complete technical specifications, preparing bid-ready procurement packages, and providing detailed bills of material that clearly define all required equipment and components.

The Provider shall support the City throughout procurement by assisting with technical evaluations, reviewing submittals, and providing recommendations. The Provider shall identify long-lead items, develop procurement timelines aligned with the project schedule, and coordinate delivery and integration of all equipment.

The Provider shall be fully responsible for ensuring that all equipment is compatible with the overall system design and site conditions. No claims for delay or additional compensation shall be granted for procurement-related issues that could have been reasonably anticipated or mitigated. Any failure to properly coordinate equipment requirements with the design shall remain the responsibility of the

Provider.

SCOPE OF SERVICES

The Provider shall provide complete engineering and design services necessary to deliver a fully functional substation, including civil, structural, and electrical design, as well as protection, control, and

SCADA integration. The design shall include site grading, drainage, foundation design, access, equipment layout, grounding, lightning protection, and all associated systems required for operation. All design documents shall be construction-ready and sealed by a licensed professional engineer.

The project shall include design of the 115kV transmission interconnection and the 13.2kV distribution system, including all switching, protection, and feeder configurations. The Provider shall perform all required system studies, including protection coordination and fault analysis, to ensure safe and reliable operation. No portion of the system integration shall be excluded from the scope.

The Provider shall develop design packages at progressive stages, including preliminary, intermediate, and final submissions. Each submission shall be complete for its stage and include drawings, specifications, and bills of material. The Provider shall incorporate all City comments and provide written responses documenting how each comment has been addressed.

The Provider shall be fully responsible for the accuracy and completeness of all design…