Engineering_Architectural statement of qualif.pdf
PDF 137 KB Posted
- Attached to
- City of Surrency FY 2024 Engineering RFP
- Solicitation number
- PE-60120-NONST-2024-000000002
- Issued by
- Appling County, Georgia
About this file
The document is an Engineering/Architectural Statement of Qualifications that requests information from firms interested in providing design, bid phase, and inspection services for a CDBG (Community Development Block Grant) project. The document asks the firm to provide details on their history, licenses, key personnel, relevant project experience, and references. It also inquires about the firm's fees for a preliminary engineering report and ability to meet the required deadlines. Additionally, the document requests information on whether the firm is a Section 3 Business Concern, which would require the submission of additional certification forms.
The document does not provide specifics on the project scope, timeline, or any other details beyond the requested information from the interested firms. It does not mention pricing terms, set asides, incumbents, funding requirements, or other salient contract details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Engineering_Architect Scoring Sheet.pdf | ||
| Umbrella RFP _ Engineering.docx | DOCX document | |
| Section 3 Solicitation Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering/Architectural
Statement of Qualifications
NAME OF FIRM:
ADDRESS:
1. Years in Business in Present Form:
2. Firms History and Resource Capability to Perform Required Services:
3. Titles, Names, and Addresses of all Officers:
4. List categories in which firm is legally qualified to do business. Include Licenses and Registrations where applicable.
5. Does your firm carry Errors and Omissions Insurance? _____
6. If you were awarded the design, bid phase, and inspection for this project, what would your fee be?
7. Does your firm charge for the preliminary engineering report (PER)?
If yes, what would the charge be? $______________
Can your firm meet the draft PER deadline? YES____ NO______
8. List up to five (5) projects which demonstrate skills to be used on CDBG projects.
Note project name, location, owner, year, contract amount, and nature of firm’s responsibility.
1.
2.
3.
4.
5.
9. List key personnel (with qualifications) likely to be involved on these projects and explain their specific role in CDBG work.
10. List three (3) references for the Firm.
1.
2.
3.
11. Are you a Section 3 Business Concern? Yes No
If yes, the Attached Section 3 Business Concern Certification, Previous
Certification and Action Plan must be filled out, signed, notarized, and submitted with your proposal.
Is the signed and notarized Section 3 Business Concern Certification, Previous Certification and Action Plan attached to your proposal? Yes
If no, you will only need to submit the Section 3 forms if you are the successful proposer.
12. Certifying that:
Mr./Mrs./Ms. (signature) being duly sworn deposes and states that he/she is the (title) of (name of firm) and that answers to the foregoing questions and all statements herein contained are true and correct.
File details come from the government source that posted it. Updated .