Engineering_Architectural statement of qualif.pdf
PDF 137 KB Posted
- Attached to
- City of Soperton FY 2024 Engineering RFP
- Solicitation number
- PE-66419-NONST-2024-000000004
- Issued by
- Union County, Georgia
About this file
This document is an Engineering/Architectural Statement of Qualifications for a state and local contract opportunity. It requests information about the firm, including years in business, resource capability, officer information, legal qualifications, insurance coverage, and proposed fees for design, bid phase, and inspection services. The firm is also asked to list up to five relevant projects, key personnel involved, and three references. Additionally, the firm must indicate if it is a Section 3 Business Concern and provide the required certification and action plan if so.
The document does not provide details on the specific project or services being procured, but it suggests the contract may involve Community Development Block Grant (CDBG) work. It does not include information on pricing terms, set asides, incumbents, funding requirements and sources, or other salient contract details.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Engineering_Architect Scoring Sheet.pdf | ||
| Umbrella RFP _ Engineering.docx | DOCX document | |
| Section 3 Solicitation Package.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineering/Architectural
Statement of Qualifications
NAME OF FIRM:
ADDRESS:
1. Years in Business in Present Form:
2. Firms History and Resource Capability to Perform Required Services:
3. Titles, Names, and Addresses of all Officers:
4. List categories in which firm is legally qualified to do business. Include Licenses and Registrations where applicable.
5. Does your firm carry Errors and Omissions Insurance? _____
6. If you were awarded the design, bid phase, and inspection for this project, what would your fee be?
7. Does your firm charge for the preliminary engineering report (PER)?
If yes, what would the charge be? $______________
Can your firm meet the draft PER deadline? YES____ NO______
8. List up to five (5) projects which demonstrate skills to be used on CDBG projects.
Note project name, location, owner, year, contract amount, and nature of firm’s responsibility.
1.
2.
3.
4.
5.
9. List key personnel (with qualifications) likely to be involved on these projects and explain their specific role in CDBG work.
10. List three (3) references for the Firm.
1.
2.
3.
11. Are you a Section 3 Business Concern? Yes No
If yes, the Attached Section 3 Business Concern Certification, Previous
Certification and Action Plan must be filled out, signed, notarized, and submitted with your proposal.
Is the signed and notarized Section 3 Business Concern Certification, Previous Certification and Action Plan attached to your proposal? Yes
If no, you will only need to submit the Section 3 forms if you are the successful proposer.
12. Certifying that:
Mr./Mrs./Ms. (signature) being duly sworn deposes and states that he/she is the (title) of (name of firm) and that answers to the foregoing questions and all statements herein contained are true and correct.
File details come from the government source that posted it. Updated .