ENG_25-06_Health_District_Street_Lights_Tech_Specs.pdf
PDF 3 MB Posted
- Attached to
- ENG 25-06 Health District Lighting
- Solicitation number
- 2025-ENGINEERING-073
- Issued by
- Kalamazoo County, Huntington Woods City, Michigan
About this file
The document is a comprehensive set of contract documents for a street lighting project for the City of Jackson, Michigan, involving the Michigan Department of Transportation (MDOT) and various federal and local regulatory requirements. The project encompasses street lighting improvements on Homewild Avenue, Van Dorn Street, and Perrine Street, with a contract period spanning from January 13, 2026, to November 13, 2026. The work includes furnishing and installing street lighting infrastructure, including decorative, shoebox, and street-type lights, with specific milestones for substantial completion by July 13, 2026, and completion of delayed acceptance items by September 25, 2026.
The project is funded through federal sources, specifically the U.S. Department of Housing and Urban Development (HUD), and requires compliance with various federal regulations including minority and women's business enterprise participation, equal opportunity employment, and Davis-Bacon wage standards. The contract includes detailed specifications for electrical work, conduit installation, hand holes, concrete bases, and equipment grounding, with precise technical requirements for materials and installation. Liquidated damages are stipulated for failure to meet project milestones, and the contractor must provide performance bonds, obtain necessary permits, and coordinate with utility companies and local agencies throughout the project duration.
View the file
Other files
Show all 15
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INDEX of SPECIAL PROVISIONS
MDOT Standard Specs and Supplementary Conditions ........................ SP 1 of 65
Progress Clause ..................................................................................... SP 2 of 65
Coordination Clause ............................................................................... SP 4 of 65
Utility Coordination ................................................................................. SP 5 of 65
Construction Staking .............................................................................. SP 6 of 65
Requirements for Federally Funded Projects ......................................... SP 8 of 65
Contractor Integrity ................................................................................. SP 12 of 65
Maintaining Traffic .................................................................................. SP 13 of 65
Noncompliance with Soil Erosion & Sedimentation Requirements ......... SP 16 of 65
Erosion Control, Inlet Protection, Grate Filter ......................................... SP 18 of 65
Turf Establishment, performance ........................................................... SP 19 of 65
Electrical and Lighting ............................................................................ SP 25 of 65
Soil Borings and Pavement Cores ......................................................... SP 35 of 65
Errata to the 2020 Standard Specifications ............................................ SP 46 of 65
General Decision Number ...................................................................... SP 59 of 65
MDOT STANDARD SPECIFICATIONS AND SUPPLEMENTARY CONDITIONS
COJ 1 of 1 10/22/21
The Michigan Department of Transportation 2020 Standard Specifications for Construction (referenced herein as the “MDOT Standard Specifications for Construction”) are hereby incorporated by reference and shall be deemed to be a part of these contract documents as though herein written in its entirety. The MDOT Standard Specifications for Construction shall be changed and supplemented by the Supplemental Specifications, Special Provisions and errata included in these contract documents. MDOT Standard Specifications for Construction are available for review and download from the MDOT website.
Unless otherwise omitted, changed or supplemented, the Division 1 “General Provisions” of the MDOT Standard Specifications for Construction shall be incorporated into the City’s General Conditions for this contract (pp. G-1 through G-14). In the event of any inconsistency, discrepancy or conflict between the aforementioned MDOT General Provisions and other contract documents including, but not necessarily limited to, pp. G-1 through G-14, said other contract documents shall govern.
Throughout the specifications, the term “Engineer” shall mean the City Engineer of the City of Jackson or his designee. The MDOT Standard Specifications for Construction, Division 1 “General Provisions” shall be changed and supplemented as follows:
Section 102 Proposal Submission, Award and Execution of Contract (This section shall be omitted in its entirety)
Section 104.09 Lines, Grades, and Elevations
(This section shall be omitted in its entirety.)
Section 104.10 Claim for Extra Compensation or Time Extension
Section 104.11 Work Zone Safety and Mobility
Section 107.10 Indemnification, Damage Liability and Insurance, paragraphs A through D
Section 109.04 Progress and Partial Payments
SP 1 of 65
CITY OF JACKSON, MICHIGAN
PROGRESS CLAUSE
HRC:MAR 1 of 2 9/3/25
a. General
It is expected that this contract will be awarded at the January 13, 2026, City Council meeting, after which a Notification of Award will be provided by the City to the approved bidder.
Within ten (10) days of Notification of Award, the approved bidder must provide certificates of insurance evidencing insurance coverage as required by the Contract. The successful bidder will also be required to sign a contract in three counterparts. A Notice to Proceed will then be provided to the Contractor by the City. The Contractor must begin work on a date agreed upon with the City, which date shall be no earlier than May 4, 2026. In no case shall any work be commenced prior to receipt of formal notice of award by the City.
The approved bidder(s) for the work covered by this proposal will be required to participate in a pre-construction meeting with the City. The City will arrange the time and place for the preconstruction meeting after contract award. The named subcontractor(s) for Designated and/or Specialty Items, as shown in the Proposal, is(are) recommended to be at the preconstruction meeting if such items materially affect the work schedule.
The Contractor shall prepare and submit a complete, detailed, and signed MDOT Form
1130A, Progress Schedule, according to Section 108.05.A within 7 calendar days after award.
The Progress Schedule shall include, at minimum, the controlling work items for the completions of the project, as well as the planned dates or work days that these work items will be controlling operations. All contract dates including open to traffic, project completion, interim completion and any other controlling dates in the contract, must be included in the progress schedule. Failure on the part of the Contractor to carry out the provisions of the Progress Schedule, as established, may be considered sufficient cause to prevent bidding future projects until a satisfactory rate of progress is again established.
The Contractor shall attend regular bi-weekly construction progress meetings throughout the duration of construction and shall provide updates to the City that shall include work completed to date, a two-week outlook for upcoming work, and any necessary updates regarding the Milestone dates identified herein.
b. Milestones
Construction will proceed as shown on the plans and as described in the Maintenance of
Traffic Special Provision. The Contractor shall be expected to mobilize sufficient labor and equipment to complete the project within the specified time frames.
1. Substantial Completion
Work shall be substantially completed and the roadway be designated as “Approved for Traffic” no later than July 13, 2026, and within 60 calendar days. The “Approved for Traffic” condition shall be as defined in section 107.21, Approved for Traffic, of the MDOT 2020 Standard Specifications for Construction. The number of calendar days will begin
SP 2 of 65
HRC:MAR 2 of 2 9/3/25 when the street is first closed or equipment or material is mobilized to site, whichever occurs first. Adjustments will not be made if the street is temporarily opened before the street is designated “Approved for Traffic.”
This shall include construction, and installation of street lighting system and restoration items not designated as a delayed acceptance item.
2. Completion of Delayed Acceptance Items
Delayed acceptance items shall be turf establishment items. No other items shall be considered for delayed acceptance unless approved in writing by the Engineer at the time of acceptance of the Contractor’s Progress Schedule. Delayed acceptance items shall be completed on or before September 25, 2026.
3. Contract Completion
The entire project, including punch list items, establishment of all restored turf grass, and removal of soil erosion control items, shall be completed on or before November 13, 2026.
c. Liquidated damages for failure to meet milestones
Failure by the Contractor to meet interim completion, open to traffic, and/or final completion dates will result in the assessment of liquidated damages in accordance with subsections 108.10.C.1 and 108.10.C.2 of the MDOT 2020 Standard Specifications for Construction.
SP 3 of 65
COORDINATION CLAUSE
HRC:MAR 1 of 1 9/3/25
Other contracts or work activities may commence within the immediate area during the life of this contract.
The Contractor’s attention is directed to the requirements for cooperation as covered in section
104.08 of the MDOT Standard Specifications for Construction.
Work and activities are expected along and near the construction influence area at a number of locations. Some are involving utility companies as improvements are made to their facilities in conjunction with this project or for other reasons.
It is also expected that private individuals and companies will be completing work activities on private property in the vicinity of the project.
The Contractor shall take due account of all work, and shall coordinate its work, along with storage of materials and equipment so as to cause minimum interference with the work to be performed by others.
No claims, extra compensation, or adjustment will be allowed on account of delay or failure of others to complete work as scheduled.
SP 4 of 65
NOTICE TO BIDDERS
UTILITY COORDINATION
HRC: BRC 1 of 1 4/17/24
For protection of underground utilities and in conformance with Public Act 53, the Contractor shall dial 1-800-482-7171 a minimum of three (3) full working days, excluding Saturdays, Sundays, and holidays, prior to beginning each excavation in areas where public utilities have not been previously located. Members will thus be routinely notified.
This does not relieve the Contractor of the responsibility of notifying utility owners who may not be a part of the “Miss Dig” alert system.
Public Utilities
The following Public Utilities have facilities located within the right-of-way:
Consumers Energy – Gas Division Tyler Lawrence (517) 888-3882
Consumers Energy – Electric Division Dave Southward (517) 788-2400
AT&T Telephone Karen Trudgen (517) 392-1340
City of Jackson – Water Division Jeremiah Spencer (517) 788-4082
City of Jackson – Traffic Signs & Signals, Sanitary & Storm Sewer
Troy White (517) 788-4160
Comcast - Cable Joshua Woldt (517) 480-4173
The owners of existing service facilities that are within grading or structure limits will move them to locations designated by the Engineer or will remove them entirely from the street right-of-way. Owners of Public Utilities will not be required by the City to move additional poles or structures in order to facilitate the operation of construction equipment unless it is determined by the Engineer that such poles or structures constitute a hazard to the public or are extraordinarily dangerous to the Contractor’s operations.
The contractor shall cooperate and coordinate construction activities with the owners of utilities as stated in subsection 104.08 for the MDOT Standard Specifications for Construction. In addition, for the protection of underground utilities, the contractor shall follow the requirements in subsection 107.12 of the MDOT Standard Specifications for Construction. Contractor delay claims, resulting from a utility, will be determined based upon subsection 109.05.E of the MDOT Standard Specifications for Construction.
SP 5 of 65
CONSTRUCTION STAKING
HRC:MAR 1 of 2 12/17/20
Location, alignment, elevation datum, and grade of the work will be determined by the Engineer who will set the controls necessary to properly mark these elements. The Contractor shall assume full responsibility for all other detail dimensions and elevations measured from the lines, grades and elevations established.
The Engineer will provide grade and alignment stakes needed for normal progress of the work by the Contractor. Prepare the work area for staking and notify the Engineer least 48 hours in advance of staking needs. Additional time may be required when the Contractor’s staking needs are indeterminate or erratic, or when the magnitude of the staking work makes scheduling necessary. It will be the Contractor’s responsibility to be sure that all information contained on the stakes is understood.
a. Road and Controls. Road Stakes and Controls. Stakes set by the Engineer shall be carefully preserved by the Contractor. Any stakes destroyed due to the Contractor’s carelessness will be replaced at the Engineer’s earliest convenience. When restaking becomes necessary two or more times, the Contractor will be notified in writing and may be charged for the crew time involved.
The following staking will be provided by the Engineer if required:
1. Benchmarks. At locations indicated on the plans.
2. Right-of-way. A right-of-way stake will be set at all corners marking a change in width or direction.
3. Slope and Clearing Stakes. Stakes will be provided at 50-foot intervals or at agreed upon locations and at all break points due to subgrade transitions.
4. Curb Stakes. Stakes will be provided at 25-foot intervals on tangent sections and on curves with radii of 50 feet or more. Curves with radii of less than 50 feet will be staked at tangent points, mid point and center of radii.
5. Drainage, Sanitary and Utility Stakes. Stakes will be set for drainage, sanitary and utility work. Drainage, sanitary and utility structures will be located by means of two or more offset stakes. The following information will be provided on the offset stakes:
A. Distance to center of structure or utility line, B. Cut to flowlines of the utility and pipe openings in the structure, and C. Cut or fill to top of structure.
6. Watermain. Stakes for watermain pipe will be provided at 50-foot intervals and at horizontal bends, valves and hydrants. Offset stakes will be provided and include the cut to the top of the pipe or bend.
7. Structure and Valve Adjustments. Paint marks will be provided for structures and valves located in HMA pavement that need to be adjusted upwards after placement of the top course of HMA. The Engineer, with assistance from the Contractor, will record the locations of all structures and valves located within proposed HMA pavement after the aggregate base is placed. The Contractor shall provide sufficient means to locate
SP 6 of 65
HRC:MAR 2 of 2 12/17/20 and expose structures and valves so that the Engineer may locate the center of the structures and valves. This work is considered part of the related adjustment pay items.
8. Miscellaneous Stakes. Stakes will be provided for MOT signs, sidewalk, retaining walls, guardrail, sign structures, signs, restoration items, and erosion control items.
All staking not addressed but required to construct the project in accordance with the contract documents, shall be the responsibility of the Contractor.
SP 7 of 65
NOTICE TO BIDDERS FOR
REQUIREMENTS FOR FEDERALLY FUNDED PROJECTS
Jackson: TRW 1 of 4 March 19, 2010
The goods and services to be provided under this contract are being funded with monies made available through the United States Department of Housing and Urban Development (HUD). As such, the Contractor and all subcontractors shall comply to the greatest extent feasible with the following federal requirements:
1. Minority and Women’s Business Enterprises:
The prime contractor agrees to take all necessary affirmative steps to assure that small and minority firms, women’s business enterprises, and labor surplus area firms are used when possible. Affirmative steps shall include:
a. Placing qualified small and minority businesses and women’s business enterprises on solicitation lists,
b. Assuring that small and minority businesses, and women’s business enterprises are solicited whenever they are potential sources,
c. Dividing total requirements, when economically feasible, into smaller tasks or quantities to permit maximum participation by small and minority business, and women’s business enterprises,
d. Establishing delivery schedules, where the requirements permits, which encourage participation by small and minority business, and women’s business enterprises/ and
e. Using the services and assistance of the Small Business Administration, and the Minority Business Development Agency of the Department of Commerce.
2. Section 3 of the Housing and Urban Development Act of 1968, as amended, 12 USC 1701u (Section 3):
The work to be performed under this contract is subject to Section 3 requirements. The purpose of Section 3 is to ensure employment and other economic opportunities generated by HUD assistance or HUD-assisted projects covered by Section 3, shall, to the greatest extent feasible, be directed to low- and very low-income persons, particularly persons who are recipients of HUD assistance for housing. To achieve this, the Contractor agrees to the following:
a. The contractor agrees to comply with HUD’s regulations in 24 CFR 135 which implement
Section 3. As evidenced by their execution of this contract, the parties to this contract certify they are under no contractual or other impediment that would prevent them from complying with the Part 135 regulations.
SP 8 of 65
Jackson: TRW 2 of 4 March 19, 2010
b. The Contractor agrees to send to each labor organization or representative of workers with which the Contractor has a collective bargaining agreement or other understanding, if any, a notice advising the labor organization or workers’ representative of the contractor’s commitments under this Section 3 clause, and will post copies of the notice in conspicuous places at the work site where both employees and applicants for training and employment positions can see the notice. The notice shall describe the Section 3 preference, shall set forth minimum number and job titles subject to hire, availability of apprenticeship and training positions, the qualifications for each; and the name and location of the person(s) taking applications for each of the positions; and the anticipated date the work shall begin.
c. The Contractor agrees to include this Section 3 clause in every subcontract subject to compliance with regulations in 24 CFR 135, and agrees to take appropriate action, as provided in an applicable provision of the subcontract or in this Section 3 clause, upon a finding the subcontractor is in violation of the regulations in 24 CFR 135. The Contractor will not subcontract with any subcontractor where the Contractor has notice or knowledge the subcontractor has been found in violation of the regulations in 24 CFR 135.
d. The Contractor will certify that any vacant employment positions, including training positions, that are filled (1) after the Contractor is selected but before the contract is executed, and (2) with persons other than those to whom the regulations of 24 CFR 135 require employment opportunities to be directed, were not filled to circumvent the contractor’s obligations under 24
CFR 135.
e. Non-compliance with HUD’s regulations in 24 CFR 135 may result in sanctions, termination of this contract for default, and debarment or suspension from future HUD assisted contracts.
3. Equal Opportunity Employment:
The Contractor must comply with Executive Order 11246 of September 24, 1965, entitled “Equal Employment Opportunity,” as amended by Executive Order 11375 of October 13, 1967, and as supplemented in Department of Labor regulations (41 CFR 60).
4. Copeland “Anti-Kickback” Act:
For all contracts for construction or repair, Contractor must comply with the Copeland “Anti- Kickback” Act (18 USC 874), as supplemented in Department of Labor Regulations (29 CFR 3).
5. Davis-Bacon Act:
For all contracts in excess of $2,000, Contractor must comply with the Davis-Bacon Act (40 USC 276a to 276a-7), as supplemented by Department of Labor regulations (29 CFR 5). An addendum will be posted if prevailing wage modifications occur within 10 days prior to letting.
6. Contract Work Hours and Safety Standards Act:
For all construction contracts in excess of $2,000 (and in excess of $2,500 for other contracts which involve the employment of mechanics or laborers), Contractor must comply with Sections 103 and 107 of the Contract Work Hours and Safety Standards Act (40 USC 327 – 330), as supplemented by Department of Labor regulations (29 CFR 5).
Jackson: TRW 3 of 4 March 19, 2010
7. Reporting:
The Contractor agrees to prepare and submit all reports required by HUD.
8. Copyright/Patents:
If this Contract results in any copyrightable material or inventions, the City and/or HUD reserves the right to royalty-free, non-exclusive, and irrevocable license to reproduce, publish, or otherwise use, and to authorize others to use, the work or materials for governmental purposes.
9. Audits and Inspections:
All records with respect to any matters covered by this Contract shall be made available to the City, HUD, and the Comptroller General of the United states or any of their authorized representative, at any time during normal business hours, as often as the City or HUD deem necessary, to audit, examine and make excerpts or transcripts of all relevant data.
10. Retention:
The Contractor shall retain all financial records, supporting documents, statistical records and all other records pertinent to this Contract for a period of five (5) years after the termination of all activities funded under this Contract.
11. Air and Water:
Contracts and subcontracts in excess of $100,000 shall comply with all applicable standards, orders or requirements issued under Section 306 of the Clean Air Act (42 USC 1857(h)), Section 508 of the Clean Water Act (33 USC 1368), Executive Order 11738, and Environmental Protection Agency regulations (40 CFR 15).
12. Energy Efficiency:
Contractor shall adhere to the mandatory standards and policies relating to energy efficiency that are contained in the state energy conservation plan issued in compliance with the Energy Policy and Conservation Act (PL 94 – 163, 89 Stat 871). [53 FR 8068, 8087, Mar 11, 1988, as amended at 60 FR 19639, 19642, Apr 19, 1995]
13. Remedies for Contract Violation or Breach of Contract:
If the Contractor materially fails to comply with any term of this Contract, or with any of the rules, regulations, or provisions referred to herein, the City of Jackson may suspend or terminate this Contract, in whole or in part. In addition to other remedies as provided by law, the City of Jackson may declare the Contractor ineligible for any further participation in City of Jackson contracts.
In the event the City of Jackson determines the work provided for in this Contract will not be satisfactorily completed within the time limit, the City of Jackson may furnish additional labor and material if necessary and render such other assistance as it may deem advisable for the completion of said Contract, at the expense of the Contractor, and may retain the same out of the Contract price, or recover the same by legal proceedings. Remedies for Contractor violation stated elsewhere in this document are in addition to those stated in this paragraph.
SP 10 of 65
Jackson: TRW 4 of 4 March 19, 2010
14. Federal Requirement Certification:
Prior to the award of the contract, the Contractor shall sign and complete the fields provided below to represent and warrant to and for the benefit of the City of Jackson that the Contractor has read this Notice to Bidders, understands the requirements contained therein, and agrees to comply with its terms.
Date:
By:
Bidder Signature
Printed Name
Bidding Agency
SP 11 of 65
NOTICE TO BIDDERS FOR
CONTRACTOR INTEGRITY
Jackson: TRW 1 of 1 March 22, 2010
The goods and services to be provided under this contract are being funded with monies made available through the United States Department of Housing and Urban Development (HUD). As such, the requirements of Executive Order 12549, ‘Debarment and Suspension’ are applicable to this contract. This Executive Order prohibits the award of this contract or related subcontracts to any party which is debarred or suspended or is otherwise excluded from or ineligible for participation in Federal assistance programs.
Awards will be made only to responsible contractors possessing the ability to perform successfully under the terms and conditions of this contract. Consideration will be give to such matters as contractor integrity, compliance with public policy, past performance record and financial and technical resources.
The name of each bidder on this project will be checked against the Excluded Parties List System (EPLS), an electronic, web-based system that identifies those parties excluded from receiving Federal contracts, certain subcontracts and certain types of Federal financial and non-financial assistance and benefits.
SP 12 of 65
SPECIAL PROVISION
FOR
MAINTAINING TRAFFIC
HRC:MAR 1 of 3 7/24/22
a. Description. Maintain traffic throughout the project in accordance with section 812 of the MDOT Standard Specifications for Construction and as specified herein.
Side street and commercial and residential access shall be maintained at all times unless otherwise noted. Detours shall be provided as shown on the plans, attachments and in accordance with Sections 104.07, 104.11, 812 and 922 of the Michigan Department of Transportation Standard Specifications for Highway Construction, 2012 Edition including any supplemental Specifications and any special provisions in this proposal. All traffic devices and their usage shall conform to the current edition of the Michigan Manual on Uniform Traffic Control Devices (MMUTCD).
b. Construction Influence Area (CIA). The CIA shall include the right-of-way of the following roadways within the approximate limits described below:
Prior to ceasing operations for a given holiday period, the Contractor shall ensure that all traffic control devices required for the current construction stage are in place, cleaned, and fully operational.
All work shall be conducted between 7:00 a.m. and 6:00 p.m., Monday through Saturday.
Night or Sunday work will not be permitted without written approval of the City.
Access for construction vehicles to work areas will be restricted to specific locations. The number of access points and their locations will require the prior approval of the Engineer.
Homewild Ave between M-106/Cooper St and State St Van Dorn St between Pearl St and Homewild Ave Perrine St between Detroit St and Homewild Ave
In addition, the CIA includes the parcels of the proposed work.
The Contractor shall coordinate operations with other contractors performing work on other projects within or adjacent to the Construction Influence Area (CIA).
City Maintenance crews may perform maintenance work within or adjacent to the Construction Influence Area (CIA). The City maintenance crews will coordinate their operations with the Engineer to minimize the interference to the Contractor. No additional payment will be made to the Contractor for the joint use of the traffic control items.
c. Traffic Restrictions. No work will be allowed during the following holiday periods:
Memorial Day: Friday, May 23, 2025, at 6:00 PM to Tuesday, May 27, 2025, at 7:00 AM
SP 13 of 65
HRC 2 of 3 7/24/22
Maintain local and emergency traffic at all times.
Maintain access to all bays along Jackson Street at all times. Maintain access to at least one drive-through bays at all times.
Maintain and protect pedestrian traffic at all times.
Maintain access to all businesses. If a business has multiple drives, one shall remain open at all times.
Walks, driveway and entrances to buildings shall not be unnecessarily blocked. Ingress, egress and maintenance of drive approaches, sidewalks, crosswalks, parkways and open and unopen street subgrade shall be the responsibility of the Contractor throughout construction.
Construction shall be completed in such a manner as to maintain the required entrance width for traffic at all times. When partial widths of new pavement area available to local traffic, access to drive shall be provided immediately.
d. Traffic Control Devices. All traffic control devices and their usage shall conform to the Michigan Manual on Uniform Traffic Control Devices (MMUTCD), 2011 Edition, as revised and as specified herein.
Distances shown between construction warning, regulatory, and guide signs shown on the plans are approximate and may require field adjustment, as directed by the Engineer.
All construction warning signs, unless otherwise noted, shall be 48" x 48" mounted at 7 feet bottom heights.
Temporary signs shall be erected only when in use. Where signs are no longer applicable, they shall be removed or have their legends completely covered with plywood.
Temporary traffic control devices not in use shall be kept at the Contractor’s lay down area.
Signs, plastic drums and barricades may be laid down and stored in the parkway for a maximum of 24 hours.
Sign covers shall be used to cover any non-applicable existing signs. Covers shall not leave any marks on, or mark in any way, signs or sign surfaces. Notify the Engineer at least 24 hours in advance of erection or removal of sign covers.
All channelizing devices shall be Plastic Drums, Fluorescent. Taper spacing of plastic drums shall conform to MDOT Maintaining Traffic Typical M0020a. The maximum recommended distance(s) between channelizing devices should be equal in feet to the posted speed in miles per hour on taper(s) and twice the posted speed in the parallel area(s).
Place channelizing devices, lighted arrow panels, and other traffic control devices as shown on the plans, or as directed by the Engineer to fit a specific condition.
e. Final Pavement Markings and Signing. Contractor shall remove, salvage and reinstall, on new supports all signs indicated, on the plans or proposal, that are noted to be
SP 14 of 65
HRC 3 of 3 7/24/22 salvaged. Any existing road signs removed that are not shown on the plans to be reinstalled shall be salvaged for the DPW to pick up and use
The Contractor shall store salvaged signs as per the sign sheeting manufacturer’s recommendations.
All markings, shapes and dimensions shall conform to MDOT Pavement Marking Standard
Plans and Typicals, unless specified otherwise by Special Provision.
f. Measurement and Payment Final Pavement Markings and Signing. The estimate of quantities for maintaining traffic on this project is based on the sequence of operations delineated elsewhere in the Contract documents. Payment for these devices shall be according to Section 812.04 of the MDOT Standard Specifications for Construction, for Construction unless otherwise specified
Any additional signing or maintaining traffic devices required to expedite the construction shall be at the Contractor’s expense.
SP 15 of 65
20SP-208A-01
MICHIGAN
DEPARTMENT OF TRANSPORTATION
NON-COMPLIANCE WITH SOIL EROSION AND SEDIMENTATION CONTROL
REQUIREMENTS
COS:DMG 1 of 2 APPR:TWK:HLZ:02-26-20
FHWA:APPR:03-02-20
a. Description. This special provision establishes negative adjustments related to the failure to properly install and maintain soil erosion and sedimentation control (SESC) measures and the conditions under which these adjustments will be determined and applied. Nothing in this special provision modifies section 107 of the Standard Specifications for Construction.
Delays to the project as a result of the Contractor conducting corrective actions for SESC measures do not constitute a valid reason for an extension of time.
Ensure deficiencies with SESC measures are corrected in the time frame stated herein. For those deficiencies not corrected within the stated time frame, the Engineer will make a negative adjustment to the contract as stated herein.
b. Materials. None specified.
c. Construction. Install all temporary erosion control measures identified on the plans and as directed by the Engineer for an impacted area of the project prior to the start of any earth disturbance including, but not limited to, clearing, grading and excavation in that area. The Engineer will inspect these measures every 7 days and within 24 hours after a precipitation event that results in a discharge from the site. Deficiencies will be documented on the National Pollutant Discharge Elimination System and SESC Inspection Report (MDOT Form 1126).
If at any time during the project, including the time during the seasonal suspension, the Engineer documents deficient SESC measures, the Engineer will provide written notification with instructions for corrective action to the Contractor. The time frame for completion of these corrective actions will be specified in the notification and will be discussed with the Contractor as necessary.
Deficiencies are defined as one or more of the following:
1. Failure to install or construct SESC measures shown on the plans or as directed by the Engineer;
2. Failure to maintain the measures;
3. Failure to conduct earth change activities in a manner consistent with all applicable environmental permit requirements;
4. Failure to comply with the area limitations or the time limitations stated in subsections 208.03.A and 208.03.B, respectively, of the Standard Specifications for Construction.
SP 16 of 65
20SP-208A-01
COS:DMG 2 of 2 02-26-20
SESC deficiencies are either emergency or non-emergency and the time frame for corrective action is determined accordingly. Sediment leaving the right-of-way or entering a drainage structure, waters of the state, or loss of support of the roadbed impacting public safety constitutes an emergency and corrective actions must be completed within 24 hours of notification, including weekends or holidays regardless of whether the Contractor is working or not. Non-emergency deficiencies must be corrected within 5 calendar days of notification.
For those emergency corrective actions not completed within 24 hours of notification, the Contractor will be assessed $100.00 per hour for every hour the deficiency remains uncorrected after the initial 24 hours of notification. For those non-emergency corrective actions not completed within 5 calendar days, the Contractor will be assessed $500.00 per day for every day, or part thereof, the deficiency remains uncorrected after the initial 5 days of notification.
If it is not practicable to complete the non-emergency corrective actions within 5 calendar days, the Contractor must document the reasons and propose a corrective action plan to the Engineer within 5 days of notification. The corrective action plan must contain the Contractor’s course of action and a time frame for completion. If the reasons and the corrective action plan are acceptable to the Engineer, the Contractor will be allowed to proceed with the plan as proposed without incurring a negative adjustment. If the approved corrective action plan is not completed as proposed, the Contractor will be assessed $1000.00 per calendar day for every day, or part thereof, the deficiency remains uncorrected after the time frame is exceeded in the approved corrective action plan.
Correct, in the timeframe stated herein, all other emergency or non-emergency SESC deficiencies documented anywhere else on the project during completion of the approved corrective action plan.
d. Measurement and Payment. The Engineer will make the necessary monetary adjustment to the contract amount based on the length of time the Contractor allows the deficiencies to remain uncorrected after the time allowance stated herein and as described to cover any costs incurred by the Department as a result of SESC violations.
All costs associated with corrective actions required due to the Contractor’s failure to properly install or maintain SESC measures on this project will be borne by the Contractor.
SP 17 of 65
EROSION CONTROL, INLET PROTECTION, GRATE FILTER
HRC 1 of 1 1/20/21
a. Description. Install, maintain and remove an inlet protection device to control sedimentation in accordance with section 208 of the MDOT Standard Specifications for Construction with the following modifications.
b. Materials. The Inlet Grate Filter shall consist of a sediment filter mat with fasteners.
Inlet Grate filters shall be new and shall be the standard products of manufacturers regularly engaged in the production of such materials.
Each Inlet Grate Filter shall be of the appropriate shape and dimensions to fit the casting called for on the plans. Devices labeled on the plans as ‘round’ shall be compatible with East Jordan Iron Works Casting 1045. Devices labeled as ‘rectangular’ shall include a curb guard attachment and be compatible with East Jordan Iron Works Casting 7045.
c. Installation. The Inlet Grate Filter shall be secured to the inlet grate using zip ties and pressure disks in accordance with the Manufacturer’s written installation instructions and as shown on the plans.
All inlet protective devices shall be inspected and approved by the Inspector prior to usage.
c. Maintenance. Each Inlet Grate Filter shall be inspected once every seven days or within 24 hours of a rain event, whichever comes first. Any collected material shall be broomed from the top and sides of the Inlet Grate Filter and, if applicable, the adjacent upstream gutter pan.
e. Measurement and Payment. The completed work, as described, will be measured and paid for at the contract unit price using the following pay item:
Pay Item Pay Unit Erosion Control, Inlet Protection, Grate Filter, ____ ................................................... Each
Erosion Control, Inlet Protection, Grate Filter, Round or Rectangular will be paid on an each basis and includes all labor, materials and equipment required to place, maintain and remove the Soil Erosion and Sedimentation Control device.
SP 18 of 65
20RC816(A310)
MICHIGAN
DEPARTMENT OF TRANSPORTATION
TURF ESTABLISHMENT, PERFORMANCE
RSD:JLB 1 of 6 APPR:DMG:KJS:05-29-20
a. Description. For the work identified in this special provision paid for by the pay item Turf Establishment, Performance only, delete section 816 of the Standard Specifications for Construction and replace it with this special provision. The Contractor is responsible for the performance and quality of turf growth in the areas shown on the plans and as identified by the Engineer. Comply with all local, state and federal laws when completing this work.
Establish a durable, permanent, mature, perennial turf. The work consists of fundamental turf work, including but not limited to topsoiling, seeding, mulching, erosion control, maintenance, watering and repair of turf as described herein during the life of the contract and during the life of any supplemental performance bond which may ensue.
Choose and implement proven turf establishment industry practices; provide all necessary labor and equipment; select and provide all turf establishment materials; and control erosion and any subsequent sedimentation at all times.
Perform a site analysis, interpret the results and implement a turf establishment program to ensure compliance with this specification. The site analysis must take into consideration topsoil needs, fertilizer and pH requirements, seed mix, existing and future soil moisture levels, slopes and grades, required erosion control items and devices, maintenance requirements, local highway snow removal and deicing practices, and any other characteristics that influence and affect turf establishment.
Subsection 107.11 of the Standard Specifications for Construction is revised relative to the Contractor’s responsibility for the repair of turf establishment work as follows. The Contractor is responsible, at no additional cost to the contract, for the repair of turf establishment work occasioned by storm events of up to 3 inches of rain in a 24 hour period as documented by local meteorological data submitted to the Engineer for review and approval. All other portions of subsection 107.11 remain unchanged.
1. Contractor Turf Establishment Experience Requirements. Ensure weed control is done by a commercial herbicide applicator, licensed by the State of Michigan and certified by the Michigan Department of Agriculture & Rural Development (MDARD) in the appropriate category to apply herbicides. Use application procedures and materials in accordance with federal, state and local regulations. Use of restricted use chemicals is prohibited. Provide appropriate documentation and secure approval from the Engineer before application of herbicides.
At least 10 work days prior to start of turf establishment, provide documentation to the Engineer, from the Contractor performing the turf establishment work, that they meet one or both of the following requirements.
SP 19 of 65
RSD:JLB 2 of 6 05-29-20
A. At least one person employed by the Contractor performing the turf establishment work and assigned to the job site has a degree or certificate in Turf Management, Horticulture, or related field.
B. At least one person employed by the Contractor performing the turf establishment work and assigned to the job site has at least 5 years of experience in roadside turf establishment.
b. Materials. Provide topsoil, seed, mulch, pesticide, herbicide, mulch blankets and any other unique erosion control materials as necessary to fulfill this specification, as shown on the plans. Use additional materials, as necessary, to meet the standards set forth for turf establishment in this special provision. The use of sod on the project requires the prior approval of the Engineer and if approved, may be used at limited site locations only.
Selection of all materials is the responsibility of the Contractor with the following minimum conditions.
1. Soil. Provide furnished or salvaged topsoil, which may be blended compost, that will support vigorous growth. Ensure topsoil is humus bearing and placed at least 4 inches deep.
Ensure it is free of stones larger than 1/2 inch (2 inches on freeway projects) in diameter and other debris. Trim and grade the finished slope in accordance with subsection 205.03.N of the Standard Specifications for Construction.
2. Seed. Use a seeding mixture that is composed of four or more species of perennial grass. Use only species and their cultivars or varieties which are guaranteed hardy for Michigan.
Recommended species of perennial grasses include Kentucky Bluegrass, Perennial Ryegrass, Hard Fescue, Creeping Red Fescue, Chewings Fescue, Turf-type Tall Fescue, Buffalo grass, and Alkaligrass-Fults Puccinellia distans. Select cultivars or varieties of grasses that are disease and insect resistant and of good color. Ensure that no one species in the mix is less than 5 percent, or more than 25 percent, of the mixture by weight. Do not select grass species considered noxious or objectionable, such as Quack Grass, Smooth Brome, Orchard Grass, Reed Canary Grass and others.
A. Ensure the seed is legally saleable in Michigan. Ensure the seed product does not contain more than 10 percent inert materials. Ensure the seed source is an MDOT approved certified vender.
B. Adapt the species and varieties of seed to the site conditions, to the site use, and to the soils, moisture and local climate. Site use may include, but is not limited to, detention pond, wildlife habitat, playground, wetlands, forested wetland, rural roadside, urban roadside and highly maintained front yard.
C. Ensure at least two of the species in the mixture proposed to be planted within 15 feet behind the curb or the shoulder are salt tolerant.
3. Mulch. Mulch seeded areas with the appropriate materials for the site conditions to promote germination and growth of seed and to mitigate soil erosion and sedimentation.
4. Herbicides. Comply with all federal, state and local laws. As part of the MDARD weed
SP 20 of 65
RSD:JLB 3 of 6 05-29-20 control application, the Contractor is required to make proper notifications and/or postings in accordance with the label and MDARD requirements for all locations that will be sprayed.
Notify the Engineer at least 48 hours prior to any applications being made. Furnish and apply herbicide(s) as needed. It is the Contractor’s responsibility to select the herbicide(s) and the rate at which it is used. Obtain the Engineer’s approval of work methods and herbicide(s) selected prior to the application of the herbicide(s). Complete a spray log and submit to the Engineer each day an application is made.
Do not draw water from any waterway (i.e. river, ditch, creek, lake etc.) located on state, county or municipal right-of-way, for mixing with herbicides.
5. Fertilizers. Furnish and apply fertilizer(s) as needed. It is the Contractor’s responsibility to select the fertilizer(s) and the rate at which it is used. Phosphorus is allowed for use only at the time of planting and when required by soil conditions. Obtain the Engineer’s approval of work methods and fertilizer(s) prior to the application of the fertilizer(s).
6. Water. Furnish and apply water from an approved source at a rate to promote healthy growth.
c. Construction. The Contractor is responsible for all work and all construction methods used in completing this work. Implementation of any part of the standard specifications or standard plans by the Contractor does not relieve the Contractor of responsibility for acceptability of the construction methods or for the quality of the work.
1. Inspection of the Work. The Contractor is responsible for all inspection of turf establishment work.
Use a Contractor’s Daily Report, approved by the Engineer, to report inspections made and to document turf establishment work performed on this project. Complete and submit a Contractor’s Daily Report to the Engineer when any work performed under this special provision is in progress.
Include all necessary materials documentation including tests slips, certifications, etc. with the associated Contractor’s Daily Report.
The Engineer will determine the acceptability of the Contractor’s Daily Report in terms of their completeness and accuracy. The Engineer reserves the right to verify all submitted measurements and computations. Failure by the Contractor to submit acceptable and timely reports to the Engineer may result in withholding of progress pay estimates on turf-related items until such time as reports are submitted and deemed acceptable.
The Engineer reserves the right to inspect the project for any reason in accordance with subsection 104.01 of the Standard Specifications for Construction, including the fulfillment of other inspection requirements such as Soil Erosion and Sedimentation Control, NPDES, etc.
Inspections made by the Engineer do not relieve the Contractor of the responsibility for inspections required by this special provision or the Contractor’s responsibilities for erosion control and turf establishment.
2. Erosion Control. Control erosion at all times in accordance with section 208 of the
Standard Specifications for Construction. Control of soil erosion is the responsibility of the Contractor. However, ensure sedimentation controls are placed as shown on the plans or as
SP 21 of 65
RSD:JLB 4 of 6 05-29-20 directed by the Engineer. Continuously monitor the site for needed erosion repair from any cause as addressed in the contract. Return all eroded areas to original grade as detailed in the contract.
Take immediate corrective action if sedimentation occurs in drainage structures or any watercourse or water containment area and stabilize all disturbed areas contributing to this sedimentation within 24 hours after the erosion occurrence. Remove sediment deposited as a result of the Contractor’s inability to control the soil erosion at the Contractor’s expense.
Reimburse the Department for any costs levied against the Department, such as fines, environmental costs, costs for remedies required, or any other costs as a result of the Contractor’s failure to comply with this special provision and with federal, state and local laws.
3. Erosion Repair. The Contractor is responsible for all repairs and liable for all consequences (legal, monetary or other) associated with erosion or sedimentation damage to finished or unfinished work.
Report all erosion occurrences and the repairs made by the Contractor to the Engineer in the format and at the frequency required by the Engineer. Repair any erosion, displacement or disturbance to ongoing or completed work by any cause at no additional cost to the contract unless otherwise noted herein.
The Contractor is responsible and liable for all traffic control and safety measures required to repair and protect damaged turf areas. Repair any eroded area that may affect the support of the roadbed or safety of the public within 24 hours of the erosion occurrence.
Place protective devices such as barriers, directional signs/signals, temporary fence, or any other safety measures immediately after any erosion damage occurs that has the potential of endangering the public. In these instances, provide the Engineer with a written summary of the immediate action taken describing the repairs made and the safety measures taken, within 24 hours of the occurrence of the damage.
4. Mowing and Weeding. Maintain turf to a visually appealing level, and not more than 8 inches in height at any time, prior to acceptance. Weeds must be controlled to less than 10 percent of the turf establishment area at all times during construction.
5. Final Acceptance and Supplemental Performance Bond.
A. Final Acceptance Parameters. Ensure before final acceptance of the turf establishment work, all of the following minimum parameters are met throughout all exposed areas of the project designated on the plans or identified by the Engineer as turf establishment areas: there must be no exposed bare soil and the turf must be fully germinated, erosion free, weeds less than 10 percent, disease free, dark green in color and in a vigorous growing condition.
The Engineer will notify the Contractor of the dates and times of all acceptance inspections. The Contractor may accompany the Engineer during these inspections. If the Contractor does not agree with the decision made by the Engineer, the Contractor may request an inspection by a mutually agreed upon third party (Michigan State University Extension service or other). A joint inspection, to include the Engineer, the Contractor, and the third party, will be scheduled by the Engineer. Pay all expert fees and
SP 22 of 65
RSD:JLB 5 of 6 05-29-20 expenses charged by the third party.
B. Supplemental Performance Bond. In the event that all contract items of work are completed, including the placement of all turf establishment items of work, and the final acceptance of the project is delayed because the final acceptance parameters for the turf establishment work have not been fully met; the Contractor may propose to the Engineer the use of a supplemental performance bond.
The bond serves to secure the successful completion of turf establishment…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .