- This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSBs). The NAICS code is 541310 Architectural Services with a $12.5M annual size standard.
- The anticipated design contract value is between $5-10 million. The design period of performance is 222 calendar days after notice of award.
- The selection will be based on evaluation of SF 330 submissions across criteria including professional qualifications, specialized experience, technical competence, capacity, past performance, and knowledge of the local area.
- Proposals are due by 8:00 AM PT on September 23, 2024. The anticipated award date is Spring 2025.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C77624R0134 - Amendment 0001.docx | DOCX document | |
| Encl 2F OrigBidDwgsSignageStructFireAlarm.zip | ZIP file | |
| Encl 2A OrigBidDwgsGeneralLandscape.zip | ZIP file | |
| Encl 2G OrigBidDwgsPMTeleFP.zip | ZIP file | |
| SOW_AE_Services - Construct New Police Annex MPD FINAL.pdf | ||
| Encl 3 Conceptual Floor Plan-The new design scope.pdf | ||
| SCA WD 2015-5637 Rev 27 07222024.pdf | ||
| Encl 2J OrigBidDwgsE Part 2.zip | ZIP file | |
| Encl 6 Geotechnical Report Emergency Service Annex May 17 2013.pdf | ||
| Encl 2K OrigBidSpecs.zip | ZIP file | |
| Encl 2H OrigBidDwgsE Part 1.zip | ZIP file | |
| Encl 2B OrigBidDwgsCIVIL Part 1.zip | ZIP file | |
| Encl 5 PG 18-15 Vol C.pdf | ||
| Encl 1 CommissioningRqmts.zip | ZIP file | |
| 36C77624R0134.docx | DOCX document | |
| PPQ - 7-11-24.docx | DOCX document | |
| Encl 2C OrigBidDwgsCIVIL Part 2.zip | ZIP file | |
| Encl 2D OrigBidDwgsArch Part 1.zip | ZIP file | |
| Encl 2E OrigBidDwgsArch Part 2.zip | ZIP file |
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
April 20, 2021 Project No.: 1210197C
Mr. Nathan Cannon
DAVENERGY SOLUTIONS
2207 Garnet Avenue, Suite 1
San Diego, CA 92109 Email: Nathan.Cannon@davenergy.com
Subject: SOW Police Annex – Materials Testing + Investigation
Project No: 640-382
795 Willow Road, Menlo Park CA
Dear Mr. Cannon:
As requested, Applied Materials & Engineering, Inc. (AME) has completed testing and investigation of the existing reinforced concrete footing/slab and the structural steel members at the subject project.
BACKGROUND
The location is a construction project that has been halted. Concrete slabs and footings were constructed to support future structures. There are steel beams and posts stored adjacent to the concrete foundation/slab to be used in future construction of the main structure.
Photo 1 is an overall shot of the site, showing the constructed slab pad. Photo 2 shows the structural steel beams and posts that all laying on the soil adjusted to the slab.
OBJECTIVE
The objective of this evaluation is to test the concrete footing/slab for compressive strength, evaluate the slab rebar, steel posts and beams for corrosion, verify the size of footings and installation of rebar;
all these should be in accordance to drawings provided to us. The drawings were produced by
Polytech Associates Inc. San Francisco, dated October 8, 2013.
The verification will include opening of specified areas to allow for measurements of the constructed footings and sampling of materials to be tested in our laboratory.
PROCEDURES & RESULTS FOR MATERIALS TESTING
1. Concrete Cores Compressive Strength Testing
A total of three (3) concrete cores (C1 through C3) were removed from the perimeter of the concrete footing/slab for compressive strength testing. Locations of removed samples are shown in Figure 1.
Photo 3 shows the cores removed.
SOW Police Annex – Materials Testing + Investigation
April 20, 2021
Compressive strength testing was carried out per ASTM C42 (dry). Results of the compressive strength testing are shown in Table I; the average compressive strength of the concrete is 8460 psi.
The specified strength of the concrete is 4000 psi (Note IV - 6 in Drawing No: SS001) at the foundation and slab. The test indicates the concrete meets that specified requirement.
2. Reinforcing Steel (Rebar) Tensile Testing from CMU Slab Dowels
A total of two (2) slab dowel rebar samples (R1 and R2) were removed randomly and tested for tensile properties per ASTM A370. Photo 4 shows the dowels removed.
Results of the tensile properties testing are shown in Table II.
The specified strength of the rebar is 60 ksi (Note IV - 1 in Drawing No: SS001). The test indicates
(fy of 71.6 ksi and 75.2 ksi) that the dowel rebar meets that specified requirement.
3. Posts and Beams Tensile Testing
A total of Four (4) steel coupons were removed and tested, two (2) from the HSS 8 x 8 x 5/16 posts
(P1 & P2), one (1) from a W18x35 beam (B1) and one (1) from a W24x55 beam (B2). The coupons were removed from the posts and (the web of the) beams laying on the ground adjacent to the concrete slab. Photo 5 shows the test coupons removed.
Results of our tensile strength testing are shown in Table III.
The specified strength of the beams is ASTM A992, Grade 50 and of the HSS ASTM A500 Grade B
(Note VII in Drawing No: SS001). The test indicates (fy of 57.0 ksi, 60.3 ksi, 56.5 ksi and 57.7 ksi) that the structural steel meets the specified requirement.
4. Corrosion Testing of Posts, Beam and Rebar
A total of six (6) samples (4 steel coupons and 2 rebar samples) were tested for corrosion (loss of metal) to determine if significant metal loss had occurred due to rusting; these are the same samples described above, under 2. and 3. Photo 6 shows a cross-section of the W18 x 35 beam coupon and amount of corrosion and Photo 7 shows a cross-section of the W24 x 55 coupon and amount of corrosion.
Results of our testing are shown in Table IV. The average loss of metal (corrosion) of the beams, posts and rebar are 5.4%, 6.0% and 6.9%, respectively.
Generally accepted practices (based on accepted structural engineering principals) require that metal loss be not greater than 10% for the steel to be acceptable. Since all the average measurements were less than 10%, the steel members are acceptable for future use.
*These members will need to have the corrosion removed prior to being put to final use.
SOW Police Annex – Materials Testing + Investigation
April 20, 2021
CONSTRUCTION OBSERVATIONS AND RESULTS
1. Slab on Grade (S.O.G)
GPR (ground penetrating radar) was used to survey the slab and an exposure was made to investigate the reinforcing of the slab and slab thickness.
It was determined that #4 rebar has been installed at 18" o.c. (as shown in Photo 8) and the slab was 5" in thickness, in accordance to the key note in Drawing No: SF201A. The findings meet that specified requirement.
2. Footings
a) Demolition of the slab and excavations (A1 & A2) was performed to allow for confirmation of the width and depth of the footing and scanning of the foundation for rebar installation.
Location of investigated slab, excavation and scannings are provided in Figure 1 (A1 & A2).
Excavation and location A2 is shown in Photo 9.
b) We determined that #5 rebar bottom reinforcing was found to be installed longitudinally (as shown in Photo 10) in the footing. The depths and widths of the footings are in accordance to
Detail 16 and footing schedule 19 on Drawing No: S1401. The footing at A1 was found to be
2' - 0" x 1' - 6". The continuous footing at A2 was found to be 1' - 6" x 1' - 6"; this meets the requirement of Figure 1 on the framing.
c) At location A2: #5 @ 24" is correct per the plans, Detail 8/S1701 (8" CMU). Dowels to match wall reinforcing. At location A1: 12" CMU, dowels are #5 @ 24" o.c.
3. Structural Steel Beams and HSS Posts (Columns)
The number of wide flange beams and HSS posts was tallied and compared to those required on the roof plan.
All structural steel beams and HSS posts have been accounted for and are stored under tarps adjacent to the concrete slab (the lengths and of the beams and columns have not been confirmed). The base templates for the posts have been installed.
SUMMARY OF FINDINGS
1. The concrete compressive strength meets the plans & specification.
2. The reinforcing steel meets the plans & specification.
3. The structural steel meets the plans & specification.
4. The corrosion of the metals is within industry standards.
5. The S.O.G. meets the plans & specification.
6. The footing excavated meets the plans & specification.
7. The spacing of the dowels for CMU construction meet the plans & specification.
TABLE I
CONCRETE CORE COMPRESSIVE STRENGTH
SOW Police Annex
795 Willow Rd. Menlo Park, CA
AME Project No. 1210197C
*See Figure 1 for approximate test locations.
Core
ID*
Element
Location
As
Received
Height
(in.)
Diameter
(in.)
Capped
Height
(in.)
Area
(in.²)
Correction
Factor
Ultimate
Load
(lbs)
Ultimate
Compressive
Strength
(psi)
C1 Perimeter foundation
6.38 2.77 5.46 6.02 1.000 51,180 8500
C2 Perimeter foundation
6.23 2.77 5.40
6.02
1.000 47,310 7850
C3 Perimeter foundation
6.32 2.77 5.36
6.02
0.995 54,730 9040
Average 8460
TABLE II
DOWEL REINFORCING STEEL TENSILE STRENGTH TEST RESULTS
Steel Sample ID R1 R2
Bar Size #5 #6
Diameter, inch i 0.335 0.504
Actual Area, sq. inch
0.099 0.200
Yield Point, lbs.
7,080 15,001
Maximum Load, lbs.
11,000 23,666
Yield Strength, psi 71,587 75,193
Tensile strength, psi 111,223 118,627
Elongation in 2", inch
2.34 2.42
Elongation %
17 21
TABLE III
STEEL POST AND BEAM TENSILE STRENGTH TEST RESULTS
Steel Sample ID B1
(beam)
B2
(beam)
P1
(post)
P2
(post)
Width, inch 0.474 0.505 0.495 0.481
Size Depth, inch 0.302 0.368 0.307 0.306
Actual Area, sq. inch
0.143 0.186 0.152 0.147
Yield Point, lbs.
8,163 11,203 8,612 8,479
Maximum Load, lbs.
10,251 14,804 9,878 10,167
Yield Strength, psi 57,084 60,296 56,595 57,680
Tensile strength, psi 71,685 79,677 65,030 69,163
Elongation in 2", inch
2.6 2.65 2.62 2.63
Elongation, %
30 36 31 32
TABLE IV
STEEL POSTS AND BEAMS CORROSION TEST RESULTS
Steel Sample ID B1
(beam)
B2
(beam)
P1
(post)
P2
(post)
R1
(bar)
R2
(bar)
Specification Dimension (in.) 0.300 0.3950 5/16 5/16 0.625 0.750
Average Actual Measurement (in.) 0.2960 0.3577 0.2864 0.2984 0.583 0.697
Percentage of Corrosion (%) 1.3 9.4 7.4 4.5 6.7 7.1
Average Corrosion (%) 5.4 6.0 6.9
Figure 1. Foundation plan showing locations of core samples and footing excavations.
Photo 1. Overall view of the concrete slab (S.O.G.) – the upright bars are the CMU dowels.
Photo 2. The structural steel beam and posts laying on the grass – they are covered
With tarps.
Photo 3. Concrete core samples removed from locations C1 through C3 noted on
Figure 1.
Photo 4. Two dowel rebar samples removed.
Photo 5. Post and beams coupons samples removed from steel framing members lying on the ground adjacent to the slabs.
Photo 6. Cut section of the W18 x 35 beam.
Photo 7. Cut section of the W24 x 55 beam.
Photo 8. Example of exposed #4 rebar 18" o.c. at A1 in Figure 1 above. This area was further excavated to confirm the dimensions of the foundation and the footing was scanned for rebar location which was located in accordance to Detail 16 and footing schedule 19 on Drawing No: S1401.
Photo 9. Excavation at A2 where the foundation dimensions were confirmed and the footing rebar locations were confirmed.
Photo 10. Excavation at A2 where the foundation dimensions were confirmed and the footing rebar locations were confirmed.