Encl 1_SOW Lead Septum Foam and Test Description for SSN R1.docx

DOCX document 14 KB Posted

Attached to
SSBN Lead Foam Replacement and Test Descriptors
Solicitation number
N0003025G1038P262
Issued by

About this file

This document is a Statement of Work (SOW) for the Department of the Navy Strategic Systems Programs, detailing two contract line items (CLINs) related to submarine system maintenance and testing. CLIN 0001 requires the contractor to procure and install foam refresh kits for various Power Conversion Equipment (PCE) and Fan Assemblies across US and UK submarine shore sites, including 3 US PCE and Fan Assembly Kits, 2 US 583 and 584 Foam Replacement Kits, 4 US 581 Foam Replacement Kits, and 1 UK PCE and Fan Assembly Kit for shore locations.

CLIN 0002 focuses on Fire Control System analysis, requiring the contractor to complete Fire Control Test Descriptions and Fault Code Decoding over a 12-month period following contract award. Deliverables include an updated Plan of Action & Milestones (POA&M), completed Test Descriptions, a Final Report on the Fault Code Decoder Tool, a comprehensive report of Test Descriptions and Fault/Fail Codes, and a Post Completion Report detailing hours and costs expended. The solicitation (N0003025G1038P262) is currently in the pre-solicitation stage for SSBN Lead Foam Replacement and Test Descriptors.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CLIN 0001 – Lead Septum Foam Replacement (Completion) (CPFF)

The contractor shall procure, refurbish and install new foam into SSBNs via foam refresh kits. In support of these efforts the contractor shall:

1) Provide foam refresh kits as listed below:

a. 3 US Power Conversion Equipment (PCE) and Fan Assembly Foam Replacement Kits for US SSBN, and Shoresite

b. 2 US 583 and 584 Foam Replacement Kits for US SSBN

c. 4 US 581 Foam Replacement Kits for US SSBN

d. 1 UK PCE and 1 Fan Assembly Foam Replacement Kit for Shoresite

2) Support installation of Foam Replacement in accordance with URP

a. PCE and Fan Cabinets on US SSBN

b. 583 and 584 Cabinets on US SSBN

c. 581 Cabinet on US SSBN

3) Provide updates as required to Year-to-Year Foam Replacement Plan

CLIN 0002 – Fire Control Test Description & Fault Code Decoder – (LOE) (CPFF)

From the period of award through 12 months thereafter, the contractor shall analyze the Fire Control System, completing Fire Control Test Descriptions and Fault Fail/Codes as outlined in the Plan of Action & Milestones (POA&M).

The contractor shall deliver:

1. Updated POA&M reflecting the end to end plan for execution of remaining future efforts.

1. Deliver completed Test Descriptions.

1. Deliver Final Report detailing status of Fault Code Decoder Tool.

1. Final Report including all Test Descriptions and Fault/Fail Codes completed.

1. Post Completion Report of Hours and Cost Expended.