ENC4 25R6518 BOQ Form.xlsx
XLSX spreadsheet 29 KB Posted
- Solicitation number
- N6274225R6518
About this file
This is a Blank Bill of Quantities (BOQ) form for a design-build contract to construct a Boat Maintenance Facility in Quezon, Palawan, Philippines. The solicitation (N6274225R6518) is issued by the Department of the Navy Naval Facilities Engineering Command, with a pre-proposal site visit scheduled for July 18, 2025 at 1130am at specific GPS coordinates. The BOQ details comprehensive construction requirements including foundations, superstructure, exterior closure, roofing, interior construction, plumbing, HVAC, fire protection, electrical systems, site preparation, and site improvements.
The BOQ includes two primary contract line items (CLINs): CLIN 0001 for the base bid of constructing the facility, and CLIN 0002 as an option item for providing a gantry crane. The facility will be constructed with specifications for various functional areas including maintenance bays, equipment and conference rooms, with detailed breakdowns of materials like concrete, rebar, masonry, metal wall cladding, roofing systems, electrical components, and site infrastructure. Contractors are required to provide comprehensive cost proposals covering material and labor costs for each detailed line item in the construction project.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Released_Amendment1_25R6518.pdf | ||
| ENC1_PPI Form.xlsx | XLSX spreadsheet | |
| Solicitation - N6274225R6518_Released.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Blank BOQ Form
COST PROPOSAL DATE SUBMITTED
| ACTIVITY AND LOCATION: | SOLICITATION NUMBER: |
| QUEZON, PALAWAN, PHILIPPINES | N6274225R6518 |
| PROJECT TITLE: | CONTRACTOR: | ||||||||
| D/B CONSTRUCT BOAT MAINTENANACE FACILITY | |||||||||
| QUANTITY | MATERIAL COST | LABOR COST | |||||||
| ITEM DESCRIPTION | NUMBER | UNIT | UNIT COST | TOTAL | UNIT COST | TOTAL | TOTAL, USD | ||
| Item # | ESR | ||||||||
| CLIN 0001: BASE BID ITEM 0001 – CONSTRUCT BOAT MAINTENANCE FACILITY | |||||||||
| A10 | FOUNDATIONS | ||||||||
| A1010 | Standard Foundations | ||||||||
| Footing/Foundation (concrete) | cu.m. | ||||||||
| Footing/Foundation (rebars) | kg | ||||||||
| A1030 | Ground Floor Slabs | ||||||||
| Slab (concrete) | cu.m. | ||||||||
| Slab (rebars) | kg | ||||||||
| Floor moisture barrier | sq.m. | ||||||||
| B10 | SUPERSTRUCTURE | ||||||||
| B1010 | Floor Construction | ||||||||
| Ramp (rebars) | kg | ||||||||
| Ramp (concrete) | cu.m. | ||||||||
| B1020 | Roof Construction | ||||||||
| Structural steel frame system, hot-dip galvanized. | sq.m. | ||||||||
| Forms and Scaffoldings | sq.m. | ||||||||
| B20 | EXTERIOR CLOSURE | ||||||||
| B2010 | Exterior Walls | ||||||||
| CHB Grout Fill | cu.m. | ||||||||
| Riprap/Retaining Walls | l.m. | ||||||||
| Masonry (Rebars) | kg | ||||||||
| CHB 6", 7MPa | sq.m. | ||||||||
| Plastering | sq.m. | ||||||||
| Metal Wall Cladding and accessories | sq.m. | ||||||||
| B2020 | Aluminum Windows at Office | ea | |||||||
| B30 | ROOFING | ||||||||
| B3010 | Roof: Maintenance Bay: Cliplock type roofing system including rockwool insulation, and accessories | sq.m. | |||||||
| Roof: Equipment/Conference Rooms: Cliplock type roofing system including rockwool insulation, and accessories | sq.m. | ||||||||
| C10 | INTERIOR CONSTRUCTION | ||||||||
| C1020 | Partition Wall | sq.m. | |||||||
| C1020 | Doors including hardware | set | |||||||
| C30 | INTERIOR FINISHES | ||||||||
| C3010 | Wall Finishes | ||||||||
| Equipment/Conference Rooms - Skim coat | sq.m. | ||||||||
| C3020 | Floor Finishes | ||||||||
| Floor diamond polished cement finish | sq.m. | ||||||||
| C3030 | Ceiling Finishes | ||||||||
| Equipment/Conference Rooms: ficem/gypsum | sq.m. | ||||||||
| C3040 | Painting | ||||||||
| Equipment/Conference Rooms | sq.m. | ||||||||
| Maintenance Bay | sq.m. | ||||||||
| D20 | PLUMBING | ||||||||
| Watercloset with tiled shelf, 2 roll holders, and rinsing spray. | ea | ||||||||
| Urinal | ea | ||||||||
| Lavatory with counter, undrcounter storage, and vanity mirror | ea | ||||||||
| Mopsink and hose bibb | ea | ||||||||
| Shower stall, shower valve, concrete tiled shelf, s/s clothes hook | ea | ||||||||
| Water heater, intantaneous | ea | ||||||||
| Domestic Water Distribution System | ea | ||||||||
| Water Water Distribution System | work | ||||||||
| D30 | HVAC | ||||||||
| Ceiling fans | ea | ||||||||
| Airconditioning Units (window-type) and Accessories | ea | ||||||||
| D40 | FIRE PROTECTION | ||||||||
| Fire Alarm and manual pull station | ea | ||||||||
| Portable fire extinguisher with cabinet | ea | ||||||||
| D50 | ELECTRICAL | ||||||||
| Weatherproof duplex while-in-use outlets | ea | ||||||||
| Duplex wall outlets | ea | ||||||||
| D5010 | Rough-ins, wirings, conduits | lot | |||||||
| Panel boards and circuit breakers | lot | ||||||||
| Disconnect Switch | ea | ||||||||
| D5010 | Transformer incl. accessories | lot | |||||||
| Electrical connection to base & Posts | lot | ||||||||
| D5020 | LED lights, Maintenance Bay incl wiring devices | ea | |||||||
| LED lights, Offices, incl wiring devices | ea | ||||||||
| D5090 | Lightning protection and grounding system | ea | |||||||
| MTS and generator quick-connect system | work | ||||||||
| G10 | SITE PREPARATION | ||||||||
| G1010 | Site Clearing | ||||||||
| Clearing, grubbing and Tree Cutting | sq.m. | ||||||||
| G1030 | Site Earthwork | ||||||||
| Excavation | cu.m. | ||||||||
| Backfilling and Compaction | cu.m. | ||||||||
| Soil Treatment, before and after construction | sq.m. | ||||||||
| G20 | SITE IMPROVEMENTS | ||||||||
| G2010 | Access Road | sq.m. | |||||||
| G2040 | Reinforced concrete ramp | sq.m. | |||||||
| S/S room signage | ea | ||||||||
| G40 | SITE ELECTRICAL UTILITIES | ||||||||
| Site Electrical and Lighting System | lot | ||||||||
| X | FIELD REQUIREMENTS, OFFICE OVERHEAD & PROFIT | ||||||||
| X10 | Field Requirements | ||||||||
| Building Permits | ls | ||||||||
| Mobilization/Demoblization | ls | ||||||||
| Topographic Survey and Geotechnical Study, and other Predesign surveys, capability assessment, etc | ls | ||||||||
| Detailed Engineering Design Package | ls | ||||||||
| TempFacil, permits, and utilities months | ls | ||||||||
| Operations & Maintenance Manual, and User Training | ls | ||||||||
| X90 | Others | ||||||||
| 1 | |||||||||
| 2 | |||||||||
| 3 | |||||||||
| SUBTOTAL CLIN 0001 | |||||||||
| CLIN 0002: OPTION ITEM 0001 – PROVIDE MAINTENANCE FACILITY EQUIPMENT | |||||||||
| E10 | EQUIPMENT | ||||||||
| E1090 | Equipment: GantryCrane | ea | |||||||
| SUBTOTAL CLIN 0002 |
TOTAL COST PROPOSAL
| CONTRACTOR AUTHORIZED SIGNATORY |
| (Sinature above printed name) |
| DATE: _________________________ | |
| NOTE: | |
| * Add any necessary line items for additional requirements in the RFP that are not already included in the BOQ form. |
Enclosure 4 - Blank Bill of Quantities (BOQ) &F
FOR OFFICIAL USE ONLY_x000D_&1#&"Calibri"&14&K000000 SBU - CONTRACTING AND ACQUISITIONS &P of &N
File details come from the government source that posted it. Updated .