EMG Professional Rate Schedule Demo 02192021.xlsx
XLSX spreadsheet 10 KB Posted
- Solicitation number
- 300000142926957
- Issued by
- Michigan
About this file
This is a contractor rate schedule submitted by Doe Demolition, Inc., a Michigan-based demolition firm located at 1234 Fifth Street in the 48226 zip code, for the Emergency Commercial Demolition project at 1560 E Milwaukee. The schedule outlines labor and material rates across two primary service categories: demolition services and backfill, grade, and site finalization work. The demolition services include administration, supervisor, laborer, and equipment hourly rates, along with specialized services for trucking regulated and non-regulated materials, air monitoring, and disposal of asbestos-containing materials and construction and demolition debris. The backfill, grade, and site finalization category covers administration, supervisor, laborer, and equipment hourly services, as well as per-ton rates for backfill material below 12 inches and topfill material for the top 12 inches of coverage.
All rates listed in the schedule are currently shown at $0.00, indicating this is a template or draft rate schedule that has not yet been populated with actual pricing. The primary point of contact for Doe Demolition, Inc. is Jane D. Doe, President, who can be reached at jane.doe@doedemolition.com or 313.313.3113. No information regarding contract term, award dates, renewal options, set-asides, or funding sources is provided in this rate schedule document.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Rate Schedule
| Organization Name: | Doe Demolition, Inc. |
| Business Address: | 1234 Fifth Street, 48226 |
| Point(s)-of-Contact: | Jane D. Doe, President |
| E-mail Address(es): | jane.doe@doedemolition.com |
| Phone #(s): | 313.313.3113 |
| Service Type | Unit Type | Unit Rate |
| DEMOLITION | ||
| Administration | Hourly | $0.00 |
| Supervisor | Hourly | $0.00 |
| Laborer | Hourly | $0.00 |
| Equipment | Hourly | $0.00 |
| Trucking: Regulated Material | Hourly | $0.00 |
| Trucking: Non-Regulated Material | Hourly | $0.00 |
| Disposal: Asbestos Containing Material | Per Ton | $0.00 |
| Disposal: Construction & Demolition | Per Ton | $0.00 |
| Air Monitoring | Per Parcel | $0.00 |
| BACKFILL, GRADE, & SITE FINALIZATION | ||
| Administration | Hourly | $0.00 |
| Supervisor | Hourly | $0.00 |
| Laborer | Hourly | $0.00 |
| Equipment | Hourly | $0.00 |
| Backfill Material (Below 12 inches) | Per Ton | $0.00 |
| Topfill Material (Top 12 inches) | Per Ton | $0.00 |
File details come from the government source that posted it. Updated .