ELINS.xlsx

XLSX spreadsheet 15 KB Posted

Attached to
USS DECATUR (DDG-73) CIS PUMPS & MOTORS
Solicitation number
N5523621Q0129
Issued by

View the file

Other files

File Type Posted
TM S6226-DN-MMA-010.pdf PDF
RFC 21Q0129.docx DOCX document
SF18 N5523621Q0129.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ELINS
CONTRACT:PUMP AND MOTOR CONTINGENCY
CONTRACT NO:
CONTRACTOR:
SHIP:USS DECATUR (DDG-73)
LOCATION:NAVY REGION SOUTHWEST
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-34044-254-0-E, NR-4 SEAWATER COOLING PUMP (PUMP ONLY)1
ELIN 0001
PROVIDE LABOR, SERVICES, EQUIPMENT, AND MATERIALS TO DISCONNECT AND REMOVE THE EXISTING NR-4 SEAWATER COOLING PUMP FROM THE FOUNDATION AND ASSOCIATED PIPING. AFTER OVERHAUL, INSTALL THE PUMP ONTO THE FOUNDATION AND CONNECT ASSOCIATED PIPING. RECORD, RETAIN, AND REUSE EXISTING PIPING AND PUMP FOUNDATION FASTENERS. **SEE NOTE #2**1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-34042-254-0-E, NR-4 SEAWATER COOLING PUMP (PUMP ONLY)1
ELIN 0002
PROVIDE LABOR, SERVICES, EQUIPMENT, ALL PUMP PARTS AND MATERIALS TO ACCOMPLISH A OVERHAUL OF THE NR-4 SEAWATER COOLING PUMP1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-34042-254-0-E, NR-4 SEAWATER COOLING PUMP (PUMP ONLY)1
ELIN 0003
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE RIGGING (ONLOAD AND OFFLOAD), CRANE SUPPORT, AND TRANSPORTATION OF THE NR-4 SEAWATER COOLING PUMP FROM THE FOUNDATION TO SHOP FOR OVERHAUL, AND BACK ONTO THE FOUNDATION AFTER REPAIR1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-34042-254-0-E, NR-4 SEAWATER COOLING PUMP (PUMP ONLY)1
ELIN 0004
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE ALIGNMENT AND ADJUSTMENTS OF THE OVERHAULED NR-4 SEAWATER COOLING PUMP. PROCURE NEW DOWEL PINS AND INSTALL AFTER COMPLETION OF ALIGNMENT AND ADJUSTMENTS PROCEDURE.1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-34042-254-0-E, NR-4 SEAWATER COOLING PUMP (PUMP ONLY)1
ELIN 0005
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE SHIPBOARD OPERATIONAL TESTING OF THE OVERHAULED NR-4 SEAWATER COOLING PUMP, BALANCED MAGNETIC COUPLING, AND NR-4 SEAWATER COOLING PUMP MOTOR.1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-34042-254-0-E, NR-4 SEAWATER COOLING PUMP (PUMP ONLY)1
ELIN 0006
PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS TO DRAIN AND DISPOSE ANY LIQUID IN SUPPORT OF THE OVERHAUL OF THE NR-4 SEAWATER COOLING PUMP1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-34042-254-0-E, NR-4 SEAWATER COOLING PUMP (PUMP ONLY)1
ELIN 0007 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE PREPARATION AND PAINTING OF NEW AND DISTURBED SURFACE1
JSNLOCATIONLOTUNIT PRICEEXT PRICE
EM02-34042-254-0-E, NR-4 SEAWATER COOLING PUMP (PUMP ONLY)1
ELIN 0008 PROVIDE LABOR, SERVICES, EQUIPMENT AND MATERIALS FOR THE REPAIR AND REPLACEMENT OF NEW AND DISTURBED LAGGING AND INSULATION1

TOTAL

Milestone Events
Purchase Order Start Date:21 April 2021
Remove, Transport to Shop and Repair:21 April to 10 May 2021
Install and OPTEST Pump:10 to 14 May 2021
Purchase Order End Date:14 May 2021
NOTES:
1. Refer to Technical Manual S6226-DN-MMA-010 for detailed procedures on the overhaul, testing, adjustments, and operational testing.

2. The Contractor shall procure and install new Pipe Gaskets and associated PUMP Unit Fasteners and Seals.

3. The Contractor shall use the existing coupling from the old Pump & Motor Unit as part of the installation and testing

Sheet2

Sheet3

File details come from the government source that posted it. Updated .