ELIN Shredder FY2026-FY2031 update.xlsx
XLSX spreadsheet 32 KB Posted
- Attached to
- Maintenance and Repairs on Shredder Plant
- Solicitation number
- W912PB26QA012
About this file
This is an ELIN (Equipment Line Item Number) pricing schedule for maintenance and repair services on a shredder plant located at USAG Bavaria in Grafenwoehr, Germany. The contract covers a five-year period of performance from August 1, 2026, through July 31, 2031, consisting of one base year and four option years. The schedule details line items for preventive maintenance, inspections, component replacements, and on-call repair services across three primary shredding units: the Artech Shredder (with both raw and fine shredders), the JBF-Can Shredder, and the Intimus-VZM17.00 Paper Shredder, along with associated lifting and rescue equipment.
The pricing schedule specifies quantities and service frequencies for each contract year, including quarterly and annual maintenance services, annual safety inspections, cutting device replacements, scraper unit replacements, and hardox welding plate replacements for the raw shredders. Additionally, the contract includes time-and-material provisions for labor hours (ranging from 750 hours in the base year to 830 hours in the final option year) to cover unexpected repair work performed by skilled tradesmen, and a separate allocation for spare parts and materials with government-assessed pricing at contract award. All unit prices and total amounts currently display as EUR 0.00, indicating this is a template schedule awaiting contractor pricing submission. The contract is structured as a Firm Fixed Price Indefinite Delivery Indefinite Quantity (IDIQ) award under solicitation number W912PB26QA012 issued by the U.S. Army Regional Contracting Office.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS Shredder Plant.pdf | ||
| CLS_Attachment Shredder.pdf | ||
| Solicitation - W912PB26QA012 Professional Appearance.pdf | ||
| Attachment - IRS Form W-14.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ELIN SCHEDULE BASIC PERIOD
ELIN/Pricing Schedule Shredder Plant - Maintenance and Repair Basic Year - 01 August 2026 - 31 July 2027
| ITEM No | Sub Clin's | Description | Quantity | Unit | Unit Price | Total Amount | |||
| 0001 | Performance of Maintenance and Inspection Services at the Artech Shredder Unit and Stationary Processing Units IAW the Perfromance Work Statement (PWS), CLS411- Attachement No 01, as well as all pertinent Manufacturer Guidelines and Occupational Health- and Safety Regulations | € 0.00 | |||||||
| 0001AA | Performance of three (3) Quarterly Maintenance Services at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 3 | SV | € 0.00 | € 0.00 | ||||
| 0001AB | Performance of one (1) Annual Maintenance Service at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 0001AC | Performance of one (1) Annual Safety Inspection at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 0001AD | Replace Cutting Device - | ||||||||
| Artech Raw Shredder - RS 110/180 | 2 | SV | € 0.00 | € 0.00 | |||||
| 0001AE | Replace Cutting Device - | ||||||||
| Artech Fine Shredder - RS 110/130 | 2 | SV | € 0.00 | € 0.00 | |||||
| 0001AF | Replace Scraper Unit at the | ||||||||
| Artech Raw Shredder - RS 110/180 | 1 | SV | € 0.00 | € 0.00 | |||||
| 0001AG | Replace Scraper Unit at the | ||||||||
| Artech Raw Shredder - RS 110/130 | 1 | SV | € 0.00 | € 0.00 | |||||
| 0001AH | Replace Hardox Welding Plates at the | ||||||||
| Raw Shredder RS 110/180 | 1 | SV | € 0.00 | € 0.00 | |||||
| 0001AI | Replace Hardox Welding Plates at the Raw Shredder RS 110/180 | 1 | SV | € 0.00 | € 0.00 | ||||
| 0001AJ | Performance of one (1) Semi-Annual Maintenance Service at the JBF-Can Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 0001AK | Performance of one (1) Annual Maintenance Service at the JBF-Can Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 0001AL | Performance of one (1) Annual | ||||||||
| Safety Inspection at the JBF Can Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | |||||
| 0001AM | Performance of one (1) Semi-Annual Maintenance Service at the Intimus-VZM17.00 Paper Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 0001AN | Performance of one (1) Annual Maintenance Service at the Intimus-VZM17.00 Paper Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 0001AO | Performance of one (1) Annual Safety Inspection at the IntimusVZM17.00 Paper Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 0001AP | Performance of one (1) Annual Safety Inspection at the Bauer Lifting Cage in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 0001AQ | Performance of one (1) Annual Safety Inspection at the RMS Forklift Rescue Cage in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 0001AR | Performance of one (1) annual safety inspection on one (1) press container in accordance with the PWS, Manufacturer's Guidelines, Health and Safety Regulations. | 36 | SV | € 0.00 | € 0.00 | ||||
| 0001AS | Performance of On-Call-Service IAW the PWS | 15 | EA | € 0.00 | € 0.00 | ||||
| 0002 | Time & Material - Labor Hours: Performance of repair work IAW the PWS. Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work will occur (skilled tradesman only) | 750 | HR | € 0.00 | € 0.00 | ||||
| 0003 | Time & Material - Spare Parts: Delivery of Material and Spare Parts IAW the PWS as well as well as Attachment 1, CLS (DO NOT ENTER PRICE: Government assessed amount at time of contract award. Settlement is based on contractor cost estimates). | 1 | AU | € 0.00 | € 0.00 | ||||
| SUM | € 0.00 | ||||||||
| SUM | $0.00 | 0.9303 |
ELIN SCHEDULE 1st OPTION PERIOD ELIN/Pricing Schedule Shredder Plant - Maintenance and Repair 1st Option Year - 01 August 2027 - 31 July 2028
| ITEM No | Sub Clin's | Description | Quantity | Unit | Unit Price | Total Amount | |||
| 1001 | Performance of Maintenance and Inspection Services at the Artech Shredder Unit and Stationary Processing Units IAW the Perfromance Work Statement (PWS), CLS411- Attachement No 01, as well as all pertinent Manufacturer Guidelines and Occupational Health- and Safety Regulations | ||||||||
| 1001AA | Performance of three (3) Quarterly Maintenance Services at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 3 | SV | € 0.00 | € 0.00 | ||||
| 0001AB | Performance of one (1) Annual Maintenance Service at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 1001AC | Performance of one (1) Annual Safety Inspection at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 1001AD | Replace Cutting Device - | ||||||||
| Artech Raw Shredder - RS 110/180 | 2 | SV | € 0.00 | € 0.00 | |||||
| 1001AE | Replace Cutting Device - | ||||||||
| Artech Fine Shredder - RS 110/130 | 2 | SV | € 0.00 | € 0.00 | |||||
| 1001AF | Replace Scraper Unit at the | ||||||||
| Artech Raw Shredder - RS 110/180 | 1 | SV | € 0.00 | € 0.00 | |||||
| 1001AG | Replace Scraper Unit at the | ||||||||
| Artech Raw Shredder - RS 110/130 | 1 | SV | € 0.00 | € 0.00 | |||||
| 1001AH | Replace Hardox Welding Plates at the | ||||||||
| Raw Shredder RS 110/180 | 1 | SV | € 0.00 | € 0.00 | |||||
| 1001AI | Replace Hardox Welding Plates at the Raw Shredder RS 110/180 | 1 | SV | € 0.00 | € 0.00 | ||||
| 1001AJ | Performance of one (1) Semi-Annual Maintenance Service at the JBF-Can Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 1001AK | Performance of one (1) Annual Maintenance Service at the JBF-Can Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 1001AL | Performance of one (1) Annual | ||||||||
| Safety Inspection at the JBF Can Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | |||||
| 1001AM | Performance of one (1) Semi-Annual Maintenance Service at the Intimus-VZM17.00 Paper Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 1001AN | Performance of one (1) Annual Maintenance Service at the Intimus-VZM17.00 Paper Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 1001AO | Performance of one (1) Annual Safety Inspection at the IntimusVZM17.00 Paper Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 1001AP | Performance of one (1) Annual Safety Inspection at the Bauer Lifting Cage in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 1001AQ | Performance of one (1) Annual Safety Inspection at the RMS Forklift Rescue Cage in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 1001AR | Performance of one (1) annual safety inspection on one (1) press container in accordance with the PWS, Manufacturer's Guidelines, Health and Safety Regulations. | 36 | SV | € 0.00 | € 0.00 | ||||
| 1001AS | Performance of On-Call-Service IAW the PWS | 15 | EA | € 0.00 | € 0.00 | ||||
| 1002 | Time & Material - Labor Hours Performance of repair work IAW the PWS. Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work will occur (skilled tradesman only) | 770 | HR | € 0.00 | € 0.00 | ||||
| 1003 | Time & Material - Spare Parts Delivery of Material and Spare Parts IAW the PWS as well as well as Attachment 1, CLS (DO NOT ENTER PRICE: Government assessed amount at time of contract award. Settlement is based on contractor cost estimates). | 1 | AU | € 0.00 | € 0.00 | ||||
| SUM | € 0.00 | ||||||||
| SUM | $0.00 | 0.9303 |
ELIN SCHEDULE 2nd OPTION PERIOD ELIN/Pricing Schedule Shredder Plant - Maintenance and Repair 2nd Option Year - 01 August 2028 - 31 July 2029
| ITEM No | Sub Clin's | Description | Quantity | Unit | Unit Price | Total Amount | |||
| 2001 | Performance of Maintenance and Inspection Services at the Artech Shredder Unit and Stationary Processing Units IAW the Perfromance Work Statement (PWS), CLS411- Attachement No 01, as well as all pertinent Manufacturer Guidelines and Occupational Health- and Safety Regulations | ||||||||
| 2001AA | Performance of three (3) Quarterly Maintenance Services at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 3 | SV | € 0.00 | € 0.00 | ||||
| 2001AB | Performance of one (1) Annual Maintenance Service at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 2001AC | Performance of one (1) Annual Safety Inspection at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 2001AD | Replace Cutting Device - | ||||||||
| Artech Raw Shredder - RS 110/180 | 2 | SV | € 0.00 | € 0.00 | |||||
| 2001AE | Replace Cutting Device - | ||||||||
| Artech Fine Shredder - RS 110/130 | 2 | SV | € 0.00 | € 0.00 | |||||
| 2001AF | Replace Scraper Unit at the | ||||||||
| Artech Raw Shredder - RS 110/180 | 1 | SV | € 0.00 | € 0.00 | |||||
| 2001AG | Replace Scraper Unit at the | ||||||||
| Artech Raw Shredder - RS 110/130 | 1 | SV | € 0.00 | € 0.00 | |||||
| 2001AH | Replace Hardox Welding Plates at the | ||||||||
| Raw Shredder RS 110/180 | 1 | SV | € 0.00 | € 0.00 | |||||
| 2001AI | Replace Hardox Welding Plates at the Raw Shredder RS 110/180 | 1 | SV | € 0.00 | € 0.00 | ||||
| 2001AJ | Performance of one (1) Semi-Annual Maintenance Service at the JBF-Can Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 2001AK | Performance of one (1) Annual Maintenance Service at the JBF-Can Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 2001AL | Performance of one (1) Annual | ||||||||
| Safety Inspection at the JBF Can Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | |||||
| 2001AM | Performance of one (1) Semi-Annual Maintenance Service at the Intimus-VZM17.00 Paper Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 2001AN | Performance of one (1) Annual Maintenance Service at the Intimus-VZM17.00 Paper Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 2001AO | Performance of one (1) Annual Safety Inspection at the IntimusVZM17.00 Paper Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 2001AP | Performance of one (1) Annual Safety Inspection at the Bauer Lifting Cage in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 2001AQ | Performance of one (1) Annual Safety Inspection at the RMS Forklift Rescue Cage in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 2001AR | Performance of one (1) annual safety inspection on one (1) press container in accordance with the PWS, Manufacturer's Guidelines, Health and Safety Regulations. | 36 | SV | € 0.00 | € 0.00 | ||||
| 2001AS | Performance of On-Call-Service IAW the PWS | 15 | EA | € 0.00 | € 0.00 | ||||
| 2002 | Time & Material - Labor Hours: Performance of repair work IAW the PWS. Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work will occur (skilled tradesman only) | 790 | HR | € 0.00 | € 0.00 | ||||
| 2003 | Time & Material - Spare Parts: Delivery of Material and Spare Parts IAW the PWS as well as well as Attachment 1, CLS (DO NOT ENTER PRICE: Government assessed amount at time of contract award. Settlement is based on contractor cost estimates). | 1 | AU | € 0.00 | € 0.00 | ||||
| SUM | € 0.00 | ||||||||
| SUM | $0.00 | 0.9303 |
ELIN SCHEDULE 3rd OPTION PERIOD ELIN/Pricing Schedule Shredder Plant - Maintenance and Repair 3rd Option Year - 01 August 2029 - 31 July 2030
| ITEM No | Sub Clin's | Description | Quantity | Unit | Unit Price | Total Amount | |||
| 3001 | Performance of Maintenance and Inspection Services at the Artech Shredder Unit and Stationary Processing Units IAW the Perfromance Work Statement (PWS), CLS411- Attachement No 01, as well as all pertinent Manufacturer Guidelines and Occupational Health- and Safety Regulations | ||||||||
| 3001AA | Performance of three (3) Quarterly Maintenance Services at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 3 | SV | € 0.00 | € 0.00 | ||||
| 3001AB | Performance of one (1) Annual Maintenance Service at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 3001AC | Performance of one (1) Annual Safety Inspection at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 3001AD | Replace Cutting Device - | ||||||||
| Artech Raw Shredder - RS 110/180 | 2 | SV | € 0.00 | € 0.00 | |||||
| 3001AE | Replace Cutting Device - | ||||||||
| Artech Fine Shredder - RS 110/130 | 2 | SV | € 0.00 | € 0.00 | |||||
| 3001AF | Replace Scraper Unit at the | ||||||||
| Artech Raw Shredder - RS 110/180 | 1 | SV | € 0.00 | € 0.00 | |||||
| 3001AG | Replace Scraper Unit at the | ||||||||
| Artech Raw Shredder - RS 110/130 | 1 | SV | € 0.00 | € 0.00 | |||||
| 3001AH | Replace Hardox Welding Plates at the | ||||||||
| Raw Shredder RS 110/180 | 1 | SV | € 0.00 | € 0.00 | |||||
| 3001AI | Replace Hardox Welding Plates at the Raw Shredder RS 110/180 | 1 | SV | € 0.00 | € 0.00 | ||||
| 3001AJ | Performance of one (1) Semi-Annual Maintenance Service at the JBF-Can Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 3001AK | Performance of one (1) Annual Maintenance Service at the JBF-Can Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 3001AL | Performance of one (1) Annual | ||||||||
| Safety Inspection at the JBF Can Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | |||||
| 3001AM | Performance of one (1) Semi-Annual Maintenance Service at the Intimus-VZM17.00 Paper Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 3001AN | Performance of one (1) Annual Maintenance Service at the Intimus-VZM17.00 Paper Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 3001AO | Performance of one (1) Annual Safety Inspection at the IntimusVZM17.00 Paper Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 3001AP | Performance of one (1) Annual Safety Inspection at the Bauer Lifting Cage in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 3001AQ | Performance of one (1) Annual Safety Inspection at the RMS Forklift Rescue Cage in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 3001AR | Performance of one (1) annual safety inspection on one (1) press container in accordance with the PWS, Manufacturer's Guidelines, Health and Safety Regulations. | 36 | SV | € 0.00 | € 0.00 | ||||
| 3001AS | Performance of On-Call-Service IAW the PWS | 15 | EA | € 0.00 | € 0.00 | ||||
| 3002 | Time & Material - Labor Hours: Performance of repair work IAW the PWS. Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work will occur (skilled tradesman only) | 810 | HR | € 0.00 | € 0.00 | ||||
| 3003 | Time & Material - Spare Parts: Delivery of Material and Spare Parts IAW the PWS as well as well as Attachment 1, CLS (DO NOT ENTER PRICE: Government assessed amount at time of contract award. Settlement is based on contractor cost estimates). | 1 | AU | € 0.00 | € 0.00 | ||||
| SUM | € 0.00 | ||||||||
| SUM | $0.00 | 0.9303 |
ELIN SCHEDULE 4th OPTION PERIOD ELIN/Pricing Schedule Shredder Plant - Maintenance and Repair 4th Option Year - 01 August 2030 - 31 July 2031
| ITEM No | Sub Clin's | Description | Quantity | Unit | Unit Price | Total Amount | |||
| 4001 | Performance of Maintenance and Inspection Services at the Artech Shredder Unit and Stationary Processing Units IAW the Perfromance Work Statement (PWS), CLS411- Attachement No 01, as well as all pertinent Manufacturer Guidelines and Occupational Health- and Safety Regulations | ||||||||
| 4001AA | Performance of three (3) Quarterly Maintenance Services at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 3 | SV | € 0.00 | € 0.00 | ||||
| 4001AB | Performance of one (1) Annual Maintenance Service at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 4001AC | Performance of one (1) Annual Safety Inspection at the Artech Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 4001AD | Replace Cutting Device - | ||||||||
| Artech Raw Shredder - RS 110/180 | 2 | SV | € 0.00 | € 0.00 | |||||
| 4001AE | Replace Cutting Device - | ||||||||
| Artech Fine Shredder - RS 110/130 | 2 | SV | € 0.00 | € 0.00 | |||||
| 4001AF | Replace Scraper Unit at the | ||||||||
| Artech Raw Shredder - RS 110/180 | 1 | SV | € 0.00 | € 0.00 | |||||
| 4001AG | Replace Scraper Unit at the | ||||||||
| Artech Raw Shredder - RS 110/130 | 1 | SV | € 0.00 | € 0.00 | |||||
| 4001AH | Replace Hardox Welding Plates at the | ||||||||
| Raw Shredder RS 110/180 | 1 | SV | € 0.00 | € 0.00 | |||||
| 4001AI | Replace Hardox Welding Plates at the Raw Shredder RS 110/180 | 1 | SV | € 0.00 | € 0.00 | ||||
| 4001AJ | Performance of one (1) Semi-Annual Maintenance Service at the JBF-Can Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 4001AK | Performance of one (1) Annual Maintenance Service at the JBF-Can Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 4001AL | Performance of one (1) Annual | ||||||||
| Safety Inspection at the JBF Can Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | |||||
| 4001AM | Performance of one (1) Semi-Annual Maintenance Service at the Intimus-VZM17.00 Paper Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 4001AN | Performance of one (1) Annual Maintenance Service at the Intimus-VZM17.00 Paper Shredder Unit to include all System Componets in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 4001AO | Performance of one (1) Annual Safety Inspection at the IntimusVZM17.00 Paper Shredder Unit to include all System Components in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 4001AP | Performance of one (1) Annual Safety Inspection at the Bauer Lifting Cage in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 4001AQ | Performance of one (1) Annual Safety Inspection at the RMS Forklift Rescue Cage in accordance with the PWS, Manufacturer Guidelines, Occupational Health- and Safety Regulations. | 1 | SV | € 0.00 | € 0.00 | ||||
| 4001AR | Performance of one (1) annual safety inspection on one (1) press container in accordance with the PWS, Manufacturer's Guidelines, Health and Safety Regulations. | 36 | SV | € 0.00 | € 0.00 | ||||
| 4001AS | Performance of On-Call-Service IAW the PWS | 15 | EA | € 0.00 | € 0.00 | ||||
| 4002 | Time & Material - Labor Hours: Performance of repair work IAW the PWS. Contractor/ Subcontractor assessed hourly rate if additional repair work outside the routine maintenance work will occur (skilled tradesman only) | 830 | HR | € 0.00 | € 0.00 | ||||
| 4003 | Time & Material - Spare Parts: Delivery of Material and Spare Parts IAW the PWS as well as well as Attachment 1, CLS (DO NOT ENTER PRICE: Government assessed amount at time of contract award. Settlement is based on contractor cost estimates). | 1 | AU | € 0.00 | € 0.00 | ||||
| SUM | € 0.00 | ||||||||
| SUM | $0.00 | 0.9303 |
Summary
| Total of Base Year | € - 0 | $ - 0 |
| Total of 1st Option Year | € - 0 | $ - 0 |
| Total of 2nd Option Year | € - 0 | $ - 0 |
| Total of 3rd Option Year | € - 0 | $ - 0 |
| Total of 4th Option Year | € - 0 | $ - 0 |
Grand Total Base + 4 Option Years € - 0 $ - 0
File details come from the government source that posted it. Updated .