ELIN Sheet W912PB25Q3003.xlsx
XLSX spreadsheet 14 KB Posted
- Solicitation number
- W912PB25Q3003
About this file
This document is an ELIN (Exhibit Line Item Number) Sheet for an IDT (Indefinite Delivery Type) Service Contract for Inspection of Railroad Vehicles and Training of Personnel at USAG (United States Army Garrison) Bavaria. The contract has a period of performance from January 1, 2025 through December 31, 2027, with a base year and two one-year option periods.
The ELIN sheet outlines the specific services required, which include annual inspections of railroad vehicles, cranes, and mulchers, as well as bi-annual training for safety and direction of personnel. Pricing is provided on a firm-fixed-price basis for each ELIN. The total estimated value of the contract, including the base and option years, is provided in Euros and converted to US Dollars.
View the file
Other files
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| CONTROLLED UNCLASSIFIED INFORMATION | ||||||
| ELIN Sheet for IDT Service Contract Inspection of Railroad Vehicle and Training of Personnel at USAG Bavaria | ||||||
| PoP: 01 January 2025 thru 31 December 2027 | ||||||
| Period of Performance 01 January 2025 thru 31 December 2025 | Base Year | |||||
| Item | ELIN | Description | Qty/EA | Unit | Unit € | Total € |
| 0001 | A001 | Inspection railroad vehicle/crane/mulcher | 1 | Job |
A002 Training personnel at railroad vehicle 1 Job
A003 Bi-annual Training, safety direction personnel 2 Each
Total
| Period of Performance 01 January 2026 thru 31 December 2026 | First Option Year | |||||
| Item | ELIN | Description | Qty/EA | Unit | Unit € | Total € |
| 1001 | B001 | Inspection railroad vehicle/crane/mulcher | 1 | Job |
B002 Training personnel at railroad vehicle 1 Job
B003 Bi-annual Training, safety direction personnel 2 Each
Total
| Period of Performance 01 January 2027 thru 31 December 2027 | Second Option Year | |||||
| Item | ELIN | Description | Qty/EA | Unit | Unit € | Total € |
| 2001 | C001 | Inspection railroad vehicle/crane/mulcher | 1 | Job |
C002 Training personnel at railroad vehicle 1 Job
C003 Bi-annual Training, safety direction personnel 2 Each
Total
| Total Amount Basic thru Second Option Year | Total € : |
| CF: 0.9249 | Total $ : |
CONTROLLED UNCLASSIFIED INFORMATION
Sheet2
Sheet3
File details come from the government source that posted it. Updated .