ELIN Sheet_W912PB24R3012.xlsx
XLSX spreadsheet 23 KB Posted
- Solicitation number
- W912PB24R3012
About this file
This document is an Exhibit Line Item Number (ELIN) Pricing Schedule for the Cleaning of Hazardous Waste Accumulation Points at USAG Bavaria. It provides a detailed breakdown of the required services and quantities over a base year and three option years from September 1, 2024 to August 31, 2028.
The key services include: removing hazardous waste from 10 accumulation points at Grafenwoehr Tower Barracks and Field Camps, as well as 8 accumulation points at Grafenwoehr Ranges and Maintenance Areas; cleaning 6 pump sumps located inside the Hazardous Material Storage Areas; and steam cleaning 10 accumulation points at each location. The ELIN sheet provides the specific quantities, unit prices, and total amounts for each line item across the base and option years. This document supports the solicitation for this requirement, which is being issued under FAR Part 12 Simplified Acquisitions by the Department of the Army Materiel Command Army Contracting Command.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| PWS_Hazardous Waste Points Cleanout_v2_W912PB24R3012.pdf | ||
| Solicitation_W912PB24R3012.pdf | ||
| Vendor QandA W912PB24R3012.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Year
| ELIN Base Year | |||||
| POP: 01.09.2024 - 31.08.2025 | |||||
| Cleaning of Hazardous Waste Accumulation Points at USAG Bavaria | |||||
| ELIN | DESCRIPTION | QUANTITY | U/I | UNIT PRICE | TOTAL |
AMOUNT
| A001 | Work Plan, Health and Safety Plan, Quality Control Plan in accordance with (IAW) PWS chapter 5.2.1 | 1 | ea | |
| A002 | Meetings | 1 | ea | |
| A003 | Hazardous Waste Removal: Remove hazardous waste from ten (10) HWAP's located at Grafenwoehr Tower Barracks and Field Camps as described in PWS, chapter 1.3. 1. | 10 | ea | |
| A004 | Hazardous Waste Removal: Remove hazardous waste from eight (8) HWAP's located at Grafenwoehr Ranges and Maintenance Areas as described in PWS, chapter 1.3.1. | 2 | ea | |
| A005 | Cleaning of Pump Sumps: Clean 6 pump sumps located inside the Hazardous Material Storage Areas at Grafenwoehr Tower Barracks, Field Camps, and Ranges, as described in PWS, chapter 1.3.2. | 2 | ea | |
| A006 | Steam Cleaning: Steam-clean ten (10) HWAPs located at Grafenwoehr Tower Barracks and Field Camps, as described in PWS, chapter 1.3.2. | 1 | ea | |
| A007 | Steam Cleaning: Steam-clean ten (10) HWAPs located at Grafenwoehr Ranges and Maintenance Areas, as described in PWS, chapter 1.3.2. | 1 | ea | |
| Total Sum |
&"Arial,Bold"&14EXHIBIT - ELIN Pricing Schedule Cleaning of Hazardous Waste Accumulation Points at USAG Bavaria &13Base Year plus 3 Option Years (01 September 2024 - 31 August 2028)
&"Arial,Regular"&14Controlled Unclassified Information (CUI)
ELIN Option Year 1
| ELIN Option Year 1 | |||||
| POP: 01.09.2025 - 31.08.2026 | |||||
| Cleaning of Hazardous Waste Accumulation Points at USAG Bavaria | |||||
| ELIN | DESCRIPTION | QUANTITY | U/I | UNIT PRICE | TOTAL |
AMOUNT
| B001 | Work Plan, Health and Safety Plan, Quality Control Plan in accordance with (IAW) PWS chapter 5.2.1 | 1 | ea | |
| B002 | Meetings | 1 | ea | |
| B003 | Hazardous Waste Removal: Remove hazardous waste from ten (10) HWAP's located at Grafenwoehr Tower Barracks and Field Camps as described in PWS, chapter 1.3. 1. | 10 | ea | |
| B004 | Hazardous Waste Removal: Remove hazardous waste from eight (8) HWAP's located at Grafenwoehr Ranges and Maintenance Areas as described in PWS, chapter 1.3.1. | 2 | ea | |
| B005 | Cleaning of Pump Sumps: Clean 6 pump sumps located inside the Hazardous Material Storage Areas at Grafenwoehr Tower Barracks, Field Camps, and Ranges, as described in PWS, chapter 1.3.2. | 2 | ea | |
| B006 | Steam Cleaning: Steam-clean ten (10) HWAPs located at Grafenwoehr Tower Barracks and Field Camps, as described in PWS, chapter 1.3.2. | 1 | ea | |
| B007 | Steam Cleaning: Steam-clean ten (10) HWAPs located at Grafenwoehr Ranges and Maintenance Areas, as described in PWS, chapter 1.3.2. | 1 | ea | |
| Total Sum |
&"Arial,Bold"&14&K000000EXHIBIT - ELIN Pricing Schedule Cleaning of Hazardous Waste Accumulation Points at USAG Bavaria &13Base Year plus 3 Option Years (01 September 2024 - 31 August 2028)
&"Arial,Regular"&14Controlled Unclassified Information (CUI)
ELIN Option Year 2
| ELIN Option Year 2 | |||||
| POP: 01.09.2026 - 31.08.2027 | |||||
| Cleaning of Hazardous Waste Accumulation Points at USAG Bavaria | |||||
| ELIN | DESCRIPTION | QUANTITY | U/I | UNIT PRICE | TOTAL |
AMOUNT
| C001 | Work Plan, Health and Safety Plan, Quality Control Plan in accordance with (IAW) PWS chapter 5.2.1 | 1 | ea | |
| C002 | Meetings | 1 | ea | |
| C003 | Hazardous Waste Removal: Remove hazardous waste from ten (10) HWAP's located at Grafenwoehr Tower Barracks and Field Camps as described in PWS, chapter 1.3. 1. | 10 | ea | |
| C004 | Hazardous Waste Removal: Remove hazardous waste from eight (8) HWAP's located at Grafenwoehr Ranges and Maintenance Areas as described in PWS, chapter 1.3.1. | 2 | ea | |
| C005 | Cleaning of Pump Sumps: Clean 6 pump sumps located inside the Hazardous Material Storage Areas at Grafenwoehr Tower Barracks, Field Camps, and Ranges, as described in PWS, chapter 1.3.2. | 2 | ea | |
| C006 | Steam Cleaning: Steam-clean ten (10) HWAPs located at Grafenwoehr Tower Barracks and Field Camps, as described in PWS, chapter 1.3.2. | 1 | ea | |
| C007 | Steam Cleaning: Steam-clean ten (10) HWAPs located at Grafenwoehr Ranges and Maintenance Areas, as described in PWS, chapter 1.3.2. | 1 | ea | |
| Total Sum |
&"Arial,Bold"&14EXHIBIT - ELIN Pricing Schedule Cleaning of Hazardous Waste Accumulation Points at USAG Bavaria &13Base Year plus 3 Option Years (01 September 2024 - 31 August 2028)
&"Arial,Regular"&14Controlled Unclassified Information (CUI)
ELIN Option Year 3
| ELIN Option Year 3 | |||||
| POP: 01.09.2027 - 31.08.2028 | |||||
| Cleaning of Hazardous Waste Accumulation Points at USAG Bavaria | |||||
| ELIN | DESCRIPTION | QUANTITY | U/I | UNIT PRICE | TOTAL |
AMOUNT
| D001 | Work Plan, Health and Safety Plan, Quality Control Plan in accordance with (IAW) PWS chapter 5.2.1 | 1 | ea | |
| D002 | Meetings | 1 | ea | |
| D003 | Hazardous Waste Removal: Remove hazardous waste from ten (10) HWAP's located at Grafenwoehr Tower Barracks and Field Camps as described in PWS, chapter 1.3. 1. | 10 | ea | |
| D004 | Hazardous Waste Removal: Remove hazardous waste from eight (8) HWAP's located at Grafenwoehr Ranges and Maintenance Areas as described in PWS, chapter 1.3.1. | 2 | ea | |
| D005 | Cleaning of Pump Sumps: Clean 6 pump sumps located inside the Hazardous Material Storage Areas at Grafenwoehr Tower Barracks, Field Camps, and Ranges, as described in PWS, chapter 1.3.2. | 2 | ea | |
| D006 | Steam Cleaning: Steam-clean ten (10) HWAPs located at Grafenwoehr Tower Barracks and Field Camps, as described in PWS, chapter 1.3.2. | 1 | ea | |
| D007 | Steam Cleaning: Steam-clean ten (10) HWAPs located at Grafenwoehr Ranges and Maintenance Areas, as described in PWS, chapter 1.3.2. | 1 | ea | |
| Total Sum |
&"Arial,Bold"&14EXHIBIT - ELIN Pricing Schedule Cleaning of Hazardous Waste Accumulation Points at USAG Bavaria &13Base Year plus 3 Option Years (01 September 2024 - 31 August 2028)
&"Arial,Regular"&14Controlled Unclassified Information (CUI)
File details come from the government source that posted it. Updated .