EL3.4 Add 1 .pdf

PDF 173 KB Posted

Attached to
Y1DA--552-CSI-162: Site Prep for PET CT Federal contract opportunity
Solicitation number
36C25021B0001_A00003
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10

About this file

This document includes electrical drawings and specifications for a site preparation project for PET/CT replacement at a Department of Veterans Affairs medical center. The project scope involves reinstalling a removed dome light, extending existing conduit and wiring, and connecting new fire alarm devices to an existing EST3 system. The solicitation is for contract 36C25021B0001_A00003 from the VA Veterans Health Administration VISN 10 for site preparation work at 4100 West Third Street in Dayton, Ohio in accordance with drawings EL3.4 and specifications Y1DA--552-CSI-162. Addenda have been released providing revised bid instructions and supplemental project information including geotechnical reports and responses to requests for information.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DA--552-CSI-162: Site Prep for PET CT, newest first.
File Type Posted
EL2.3 Add 1.pdf PDF
102800 Toilet Accessories ADD No 1.pdf PDF
09 06 00 Schedule of Finishes Add No 1.pdf PDF
Nu. 12 - Site Plan Add No 1.pdf PDF
EL0.2 Add 1.pdf PDF
230711 HVAC and Boiler Plant Insulation Add No 1.pdf PDF
Bid Opening Instructions.docx DOCX document
36C25021B0001 A00003.docx DOCX document
EL2.0 Add 1.pdf PDF
18111 - DVAMC PETCT Geotech Report.pdf PDF
AS-400 - EXTERIOR ELEVATIONS ADD No 1.pdf PDF
AS-522 - DETAILS ADD No 1.pdf PDF
EL4.3 Add 1.pdf PDF
Pre-Bid RFI Responses Add No 1 2-19-2021.pdf PDF
18111 - DVAMC PETCT Geotech Addendum No1.pdf PDF
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N N

N

N N

N

N

N

N

N

S

S S

S

S

S

SRQPON.1

1.7

2.4

2.9

2.5

X X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

HE-1B-PET

LN-1B-PET

XFMR-N-1B-PET

HN-1B-PET

LN-2B-PET

X

XX

X

X

X

X X

X

X

X

X

A103

A104

A105

A106

A107

A109

A108

A110

A102A101

E103

A111

A112

E101 E102

20 A113

XX

X X

X

X

X

X

XFMR-N-2B-PET

HE-2B-PET

X

X

X

X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X X

X

X

PHASE 3 CODED NOTES

1. PHASE 3 SCOPE OF WORK.

2. REINSTALL EXISTING DOME LIGHT REMOVED DURING PHASE 2 DEMOLITION. SPLICE AND

EXTEND EXISTING CONDUIT AND WIRING AS REQUIRED.

3. EXISTING ELECTRICAL ROOM.

PLAN NOTES

A. REFER TO DRAWING EL0.1 FOR ELECTRICAL GENERAL NOTES.

B. COORDINATE EXACT LOCATION OF ALL ELECTRICAL DEVICES WITH ARCHITECT PRIOR TO

FINAL INSTALLATION.

C. ALL NEW FIRE ALARM DEVICES TO CONNECT TO EXISTING EST3 FIRE ALARM SYSTEM.

SIGNATURE DATE

HATHAWAY

STATE OF O

H IO

P R

O F

ESS IO N

AL E N G

I N

E E

R

R E G I S T E RE D

E-61777

MARLON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

PHILIP P. KIRK

CHIEF ENGINEER

552-CSI-162

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

C :\U se rs

\M Ky ag ab a\ D oc um en ts

\1

_M

EP

_C

EN

TR

AL

F

IL

E_ m ky ag ab a@ sb m ce

.c om

.rv t

2/

/2

:5 6:

P

M

EL3.4

SYSTEMS - PARTIAL FIRST FLOOR

PLAN - ELECTRICAL (PHASE 3)

SITE PREP FOR PET/CT

REPLACEMENT

4100 WEST THIRD STREET,

DAYTON, OHIO 45428

09/16/2020 MCH

BID AND CONSTRUCTION

(REVISED)18111

09/16/2020

1/4" = 1'-0"

SYSTEMS - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 3)

ROOM LEGEND

Number Name

15 EXISTING ELECTRICAL ROOM

16 EXISTING CONFERENCE ROOM

17 EXISTING STORAGE

18 EXISTING OFFICE

19 EXISTING STORAGE

20 EXISTING STORAGE

22 EXISTING STAIR

23 EXISTING VESTIBULE

24 EXISTING CORRIDOR

27 EXISTING CORRIDOR

A101 CONTROL ROOM

A102 EXAM ROOM

A103 EQUIPMENT ROOM

A104 PATIENT PREP

A105 TOILET ROOM

A106 TOILET ROOM

A107 PATIENT PREP

A108 PATIENT PREP

A109 CORRIDOR

A110 CORRIDOR

A111 CORRIDOR

A112 CORRIDOR

A113 TOILET ROOM

E101 EXISTING PATIENT PREP

E102 EXISTING PATIENT PREP

E103 EXISTING EXAM ROOM

Revisions: Date:

35% SUBMISSION 12-12-2019

65% SUBMISSION 02-24-2020

65% RE-SUBMISSION 03-31-2020

95% SUBMISSION 05-08-2020

BID AND CONSTRUCTION 06-12-2020

BID AND CONSTRUCTION (REVISED) 07-13-2020

SOLE SOURCE REVISION 09-16-2020

ADDENDUM NO. 1 02-16-2021

File details come from the government source that posted it. Updated .