EL3.4 Add 1 .pdf
PDF 173 KB Posted
- Attached to
- Y1DA--552-CSI-162: Site Prep for PET CT Federal contract opportunity
- Solicitation number
- 36C25021B0001_A00003
About this file
This document includes electrical drawings and specifications for a site preparation project for PET/CT replacement at a Department of Veterans Affairs medical center. The project scope involves reinstalling a removed dome light, extending existing conduit and wiring, and connecting new fire alarm devices to an existing EST3 system. The solicitation is for contract 36C25021B0001_A00003 from the VA Veterans Health Administration VISN 10 for site preparation work at 4100 West Third Street in Dayton, Ohio in accordance with drawings EL3.4 and specifications Y1DA--552-CSI-162. Addenda have been released providing revised bid instructions and supplemental project information including geotechnical reports and responses to requests for information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| EL2.3 Add 1.pdf | ||
| 102800 Toilet Accessories ADD No 1.pdf | ||
| 09 06 00 Schedule of Finishes Add No 1.pdf | ||
| Nu. 12 - Site Plan Add No 1.pdf | ||
| EL0.2 Add 1.pdf | ||
| 230711 HVAC and Boiler Plant Insulation Add No 1.pdf | ||
| Bid Opening Instructions.docx | DOCX document | |
| 36C25021B0001 A00003.docx | DOCX document | |
| EL2.0 Add 1.pdf | ||
| 18111 - DVAMC PETCT Geotech Report.pdf | ||
| AS-400 - EXTERIOR ELEVATIONS ADD No 1.pdf | ||
| AS-522 - DETAILS ADD No 1.pdf | ||
| EL4.3 Add 1.pdf | ||
| Pre-Bid RFI Responses Add No 1 2-19-2021.pdf | ||
| 18111 - DVAMC PETCT Geotech Addendum No1.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N N
N
N N
N
N
N
N
N
S
S S
S
S
S
SRQPON.1
1.7
2.4
2.9
2.5
X X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
HE-1B-PET
LN-1B-PET
XFMR-N-1B-PET
HN-1B-PET
LN-2B-PET
X
XX
X
X
X
X X
X
X
X
X
A103
A104
A105
A106
A107
A109
A108
A110
A102A101
E103
A111
A112
E101 E102
20 A113
XX
X X
X
X
X
X
XFMR-N-2B-PET
HE-2B-PET
X
X
X
X
X
X
X
X X
X
X
X
X
X
X
X
X
X
X
X
X X
X
X
PHASE 3 CODED NOTES
1. PHASE 3 SCOPE OF WORK.
2. REINSTALL EXISTING DOME LIGHT REMOVED DURING PHASE 2 DEMOLITION. SPLICE AND
EXTEND EXISTING CONDUIT AND WIRING AS REQUIRED.
3. EXISTING ELECTRICAL ROOM.
PLAN NOTES
A. REFER TO DRAWING EL0.1 FOR ELECTRICAL GENERAL NOTES.
B. COORDINATE EXACT LOCATION OF ALL ELECTRICAL DEVICES WITH ARCHITECT PRIOR TO
FINAL INSTALLATION.
C. ALL NEW FIRE ALARM DEVICES TO CONNECT TO EXISTING EST3 FIRE ALARM SYSTEM.
SIGNATURE DATE
HATHAWAY
STATE OF O
H IO
P R
O F
ESS IO N
AL E N G
I N
E E
R
R E G I S T E RE D
E-61777
MARLON
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
PHILIP P. KIRK
CHIEF ENGINEER
552-CSI-162
7850 Freeway Circle
440.243.2000 t
Cleveland, OH 44130
440.243.3305 f
Arch. Proj. No.:
C :\U se rs
\M Ky ag ab a\ D oc um en ts
\1
_M
EP
_C
EN
TR
AL
F
IL
E_ m ky ag ab a@ sb m ce
.c om
.rv t
2/
/2
:5 6:
P
M
EL3.4
SYSTEMS - PARTIAL FIRST FLOOR
PLAN - ELECTRICAL (PHASE 3)
SITE PREP FOR PET/CT
REPLACEMENT
4100 WEST THIRD STREET,
DAYTON, OHIO 45428
09/16/2020 MCH
BID AND CONSTRUCTION
(REVISED)18111
09/16/2020
1/4" = 1'-0"
SYSTEMS - PARTIAL FIRST FLOOR PLAN - ELECTRICAL (PHASE 3)
ROOM LEGEND
Number Name
15 EXISTING ELECTRICAL ROOM
16 EXISTING CONFERENCE ROOM
17 EXISTING STORAGE
18 EXISTING OFFICE
19 EXISTING STORAGE
20 EXISTING STORAGE
22 EXISTING STAIR
23 EXISTING VESTIBULE
24 EXISTING CORRIDOR
27 EXISTING CORRIDOR
A101 CONTROL ROOM
A102 EXAM ROOM
A103 EQUIPMENT ROOM
A104 PATIENT PREP
A105 TOILET ROOM
A106 TOILET ROOM
A107 PATIENT PREP
A108 PATIENT PREP
A109 CORRIDOR
A110 CORRIDOR
A111 CORRIDOR
A112 CORRIDOR
A113 TOILET ROOM
E101 EXISTING PATIENT PREP
E102 EXISTING PATIENT PREP
E103 EXISTING EXAM ROOM
Revisions: Date:
35% SUBMISSION 12-12-2019
65% SUBMISSION 02-24-2020
65% RE-SUBMISSION 03-31-2020
95% SUBMISSION 05-08-2020
BID AND CONSTRUCTION 06-12-2020
BID AND CONSTRUCTION (REVISED) 07-13-2020
SOLE SOURCE REVISION 09-16-2020
ADDENDUM NO. 1 02-16-2021
File details come from the government source that posted it. Updated .