This drawing package pertains to a demolition plan for electrical systems as part of a site preparation project for a PET/CT replacement at a Veterans Affairs medical center located at 4100 West Third Street in Dayton, Ohio. The scope of work involves removing existing electrical equipment, including an environmental conditioning unit, outdoor unit, electric reheat coil, and PET/CT machine to allow for renovations. Notes specify disconnecting and removing associated conduit and wiring back to their sources. The project is identified as solicitation number 36C25021B0001_A00003 for site preparation for a PET/CT replacement issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 10.

View the file

Other files

Show all 15

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N

N N

N N

J

J

J

J

J

J

J

N

J

N

N

N

J

S S

S

SRQPON.1

1.7

2.4

2.9

2.5

X X

XX

X X

X X X X X

X

X

X

X

X X X

X

X

X

X

X

X

X X X X

X X

X

X

X X

X

X

X X

X X

X

X

XX

X

X

X

X

X

XX

X

X

X X X

X

X

X

X X

X

X X

X

X

X X

X

X

X

X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X X X

X X

X

X

X

X

X X

X

X

X X X X X X X X

HE-1B-PET

LN-1B-PET

HN-1B-PET

XFMR-N-1B-PET

LN-2B-PET

X

X

X

X

X

X

X

X

XX

X

X

X

X

X

X

X

X

X

X

X X

X

X

X

X

XFMR-N-2B-PET

X

X

XX

X

X

X

X

X

X

X

X

X

X

X

X

X X

X X

XX

X X

X

X

XX

X X

X

X

HE-2B-PET

X

X X X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

X

PHASE 2 CODED NOTES

1. PHASE 2 SCOPE OF WORK.

2. EXISTING ELECTRICAL ROOM.

3. ENVIRONMENTAL CONDITIONING UNIT TO BE REMOVED.

4. OUTDOOR UNIT TO BE REMOVED.

5. ELECTRIC REHEAT COIL TO BE REMOVED.

6. NURSE CALL DOME LIGHT TO BE TEMPORARILY REMOVED AND REINSTALLED AFTER NEW

INSTALLATION OF CEILING BY GC. CONSUIT AND WIRING TO REMAIN FOR REUSE.

7. EXISTING PET/CT MACHINE AND EQUIPMENT TO BE REMOVED BY GE HEALTHCARE. EC TO

DISCONNECT AND REMOVE ALL ASSOCIATED CONDUIT AND WIRING BACK TO SOURCE OR NEXT

DEVICE TO REMAIN. REFER TO ARCHITECTURAL DRAWINGS FOR MORE INFORMATION.

8. NURSE CALL DEVICE TO BE REMOVED AND RELOCATED AS SHOWN ON NEW PLANS.8

PLAN NOTES

A. REFER TO DRAWING ES1.0 FOR ELECTRICAL GENERAL NOTES.

B. ELECTRICAL ITEMS SHOWN DASHED AND INDICATED TO BE REMOVED SHALL BE

DISCONNECTED AND ALL ASSOCIATED CONDUIT AND WIRING BE REMOVED BACK TO SOURCE OR

NEXT DEVICE TO REMAIN.

C. REWORK ANY EXISTING BRANCH CIRCUIT THAT IS AFFECTED BY THE DEMOLITION OF

ELECTRICAL DEVICES IN ORDER TO MAINTAIN OPERATION OF ALL EXISTING ELECTRICAL DEVICES

TO REMAIN.

D. ALL DEVICES TO BE REMOVED SHALL BE GIVEN TO OWNER UNLESS SPECIFIED OTHERWISE.

SIGNATURE DATE

HATHAWAY

STATE OF O

H IO

P R

O F

ESS IO N

AL E N G

I N

E E

R

R E G I S T E RE D

E-61777

MARLON

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

FULLY SPRINKLERED

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

PHILIP P. KIRK

CHIEF ENGINEER

552-CSI-162

7850 Freeway Circle

440.243.2000 t

Cleveland, OH 44130

440.243.3305 f

Arch. Proj. No.:

C :\U se rs

\M Ky ag ab a\ D oc um en ts

\1

_M

EP

_C

EN

TR

AL

F

IL

E_ m ky ag ab a@ sb m ce

.c om

.rv t

2/

/2

:5 8:

P

M

EL2.0

DEMOLITION - FIRST FLOOR PLAN -

ELECTRICAL (PHASE 2)

SITE PREP FOR PET/CT

REPLACEMENT

4100 WEST THIRD STREET,

DAYTON, OHIO 45428

09/16/2020 MCH

BID AND CONSTRUCTION

(REVISED)18111

09/16/2020

1/4" = 1'-0"

DEMOLITION - FIRST FLOOR PLAN - ELECTRICAL (PHASE 2)

Revisions: Date:

35% SUBMISSION 12-12-2019

65% SUBMISSION 02-24-2020

65% RE-SUBMISSION 03-31-2020

95% SUBMISSION 05-08-2020

BID AND CONSTRUCTION 06-12-2020

BID AND CONSTRUCTION (REVISED) 07-13-2020

SOLE SOURCE REVISION 09-16-2020

ADDENDUM NO. 1 02-16-2021