About this file
This is a construction plans and specifications document for the City of Tustin, California, detailing traffic signal improvements at the intersection of El Camino Real and Auto Center Drive (CIP No. 40097). The project involves the demolition and removal of existing traffic signal equipment and installation of new infrastructure including signal poles, pull boxes, conduits, conductors, detector loops, and curb ramps. The work encompasses three main sheets: a title sheet with general notes and project location mapping, a street improvement plan detailing sidewalk and curb ramp construction with specific elevation and grading requirements, and a traffic signal improvement plan showing equipment locations and modifications. Key construction requirements include notification to Underground Service Alert of Southern California at least two working days before excavation, compliance with City of Tustin Department of Public Works standards, removal and salvage of existing equipment for delivery to the City yard, installation of LED signal heads with left-turn arrow configurations, APS pedestrian push buttons with braille signage, and various conduit and conductor installations per the detailed conductor schedule. The project coordinates are based on the California Coordinate System of 1983 (CCS83), Zone 6, with elevations referenced to Orange County Public Works Benchmark No. 3G-40-91.
The contractor is responsible for furnishing all labor, tools, transportation, equipment, materials, and incidentals necessary for project completion. The contractor must obtain a City of Tustin business license prior to commencing work and provide construction surveys at no cost to the City, with costs for replacing destroyed survey points deducted from final payment. Environmental compliance requirements mandate proper handling of pollutants, hazardous materials, and stormwater runoff, with dewatering of non-contaminated groundwater requiring a National Pollutant Discharge Elimination System permit. Trench and subgrade compaction testing shall be performed by a City-designated laboratory using California Test Methods No. 216 and 231, with the City providing first tests at no cost. The contractor bears responsibility for damage to existing utilities, pavement, structures, trees, landscaping, and irrigation systems resulting from construction operations and must repair or replace such items to the satisfaction of the City Engineer. The project follows the latest edition of Standard Specifications for Public Works Construction, City of Tustin Minimum Design Standards, latest Caltrans standard plans, and California MUTCD requirements.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ABBREVIATIONS:
CITY OF TUSTIN
PUBLIC WORKS DEPARTMENT
D W
G . N
O . T
E -5
SHT 01 OF 03
APPROVALS:
P R
O
JE
C T
N O
. 4
: E
L C
A M
IN
O
R E
A L/
A U
TO
C
E N
TE
R
S
IG
N A
L
IM
P R
O V
E M
E N
TS
LOCATION MAP
(NOT TO SCALE)
EL CAMINO REAL/ AUTO CENTER DRIVE
SIGNAL IMPROVEMENTS
CIP NO. 40097
PROJECT
LOCATION
Underground Service Alert of Southern California
R
Docusign Envelope ID: 6F56A9C9-4ACB-8C93-8074-E55BF8905DD9
08/05/26
AutoCAD SHX Text
(PVT.)
AutoCAD SHX Text
PARK
AutoCAD SHX Text
PARK
AutoCAD SHX Text
GLEN
AutoCAD SHX Text
LAUREL
AutoCAD SHX Text
PARK
AutoCAD SHX Text
REAL
AutoCAD SHX Text
CAMINO
AutoCAD SHX Text
RED HILL
AutoCAD SHX Text
TRANSPORTATION
AutoCAD SHX Text
CORRIDOR
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
RANCH
AutoCAD SHX Text
REAL
AutoCAD SHX Text
REAL
AutoCAD SHX Text
BROWNING AVENUE
AutoCAD SHX Text
ROAD
AutoCAD SHX Text
BRYAN
AutoCAD SHX Text
EL CAMINO
AutoCAD SHX Text
TUSTIN
AutoCAD SHX Text
PETERS CANYON CHANNEL
AutoCAD SHX Text
MAGNOLIA TREE
AutoCAD SHX Text
PARK
AutoCAD SHX Text
AVENUE
AutoCAD SHX Text
TREE
AutoCAD SHX Text
RAIN
AutoCAD SHX Text
JAMBOREE
AutoCAD SHX Text
AUTO CENTER DR
AutoCAD SHX Text
STATE REGIONAL WATER QUALITY CONTROL BOARD.
AutoCAD SHX Text 21.
AutoCAD SHX Text 20.
AutoCAD SHX Text 19.
AutoCAD SHX Text
INCLUDING NECESSARY SAWCUTTING, REMOVAL, REPLACEMENT OR CAPPING.
AutoCAD SHX Text
UNINTERRUPTED ALONG THE STREET OR DRAINAGE COURSES.
AutoCAD SHX Text
AND HE SHALL BE FAMILIAR WITH ALL APPLICABLE STANDARDS AND SPECIFICATIONS.
AutoCAD SHX Text
SATISFACTION OF THE CITY ENGINEER.
AutoCAD SHX Text
BUSINESS LICENSE WHILE WORKING ON THIS PROJECT.
AutoCAD SHX Text 18.
AutoCAD SHX Text 17.
AutoCAD SHX Text 14.
AutoCAD SHX Text 16.
AutoCAD SHX Text 15.
AutoCAD SHX Text 13.
AutoCAD SHX Text
BE AT THE CONTRACTOR'S EXPENSE.
AutoCAD SHX Text 12.
AutoCAD SHX Text 11.
AutoCAD SHX Text 10.
AutoCAD SHX Text 9.
AutoCAD SHX Text 8.
AutoCAD SHX Text
ENGINEER OR UTILITY COMPANY.
AutoCAD SHX Text 6.
AutoCAD SHX Text 7.
AutoCAD SHX Text 5.
AutoCAD SHX Text
%%UGENERAL NOTES
AutoCAD SHX Text 1.
AutoCAD SHX Text
ADVERTISING SIGNS ARE NOT ALLOWED IN STREET RIGHTS OF WAY.
AutoCAD SHX Text
TO FACILITATE CONSTRUCTION, AT (714) 573-3150.
AutoCAD SHX Text 4.
AutoCAD SHX Text 3.
AutoCAD SHX Text 2.
AutoCAD SHX Text CONSTRUCTION SITES SHALL BE MAINTAINED IN SUCH A CONDITION THAT AN UNANTICIPATED STORM DOES NOT CARRY WASTES OR
AutoCAD SHX Text OR STUCCO FRAGMENTS; FUELS, OILS, LUBRICANTS, AND HYDRAULIC, RADIATOR OR BATTERY FLUIDS; FERTILIZERS, VEHICLE/EQUIPMENT
AutoCAD SHX Text PAINTS, STAINS, SEALANTS, GLUES, LIMES, PESTICIDES, HERBICIDES, WOOD PRESERVATIVES AND SOLVENTS; ASBESTOS FIBERS, PAINT FLAKES
AutoCAD SHX Text MATERIALS WHICH MAY HAVE EFFECTS OF POLLUTION INCLUDE BUT ARE NOT LIMITED TO: SOLID OR LIQUID CHEMICAL SPILLS; WASTES FROM
AutoCAD SHX Text CLEANING OR CHEMICAL DEGREASING AND SUPERCHLORINATED POTABLE WATER LINE FLUSHINGS. DURING CONSTRUCTION, DISPOSAL OF
AutoCAD SHX Text DEWATERING OF CONTAMINATED GROUNDWATER, OR DISCHARGING CONTAMINATED SOILS VIA SURFACE EROSION IS PROHIBITED. DEWATERING
AutoCAD SHX Text OF NON-CONTAMINATED GROUNDWATER REQUIRES A NATIONAL POLLUTANT DISCHARGE ELIMINATION SYSTEM PERMIT FROM THE RESPECTIVE
AutoCAD SHX Text AND GUTTER OR SIDEWALK SHALL BE POURED TO A THICKER SECTION DIRECTLY ONTO THE OVERCUT SUBGRADE. WHEN CURB AND GUTTER
AutoCAD SHX Text WHEN CURB AND GUTTER AND/OR SIDEWALK SUBGRADE IS OVERCUT 1" OR LESS THE SUBGRADE SHALL NOT BE BACKFILLED AND THE CURB
AutoCAD SHX Text AND/OR SIDEWALK SUBGRADE IS OVERCUT IN EXCESS OF 1" THE SUBGRADE SHALL BE BROUGHT BACK TO PROPER LEVEL WITH CLASS 2
AutoCAD SHX Text ALL EXISTING IMPROVEMENTS INCLUDING CURB AND GUTTERS, SIDEWALKS, ASPHALT CONCRETE OR P.C.C. PAVING WHICH ARE BEING JOINED
AutoCAD SHX Text OR MATCHED IN CONNECTION WITH THE PROJECT, SHALL BE JOINED, OR MATCHED IN A MANNER SATISFACTORY TO THE CITY ENGINEER, AutoCAD SHX Text THE CONTRACTOR SHALL REPAIR AND/OR REMODEL EXISTING IRRIGATION SYSTEMS AS NECESSARY TO FACILITATE CONSTRUCTION TO THE
AutoCAD SHX Text THE CONTRACTOR SHALL CONDUCT HIS CONSTRUCTION OPERATIONS IN SUCH A MANNER THAT STORM OR OTHER WATERS MAY PROCEED
AutoCAD SHX Text STATIONING REFERS TO CENTERLINE OF STREET. STREET WIDTH DIMENSIONS AND CURB LINE CURVE DATA REFERS TO FACE OF CURB.
AutoCAD SHX Text THE CONTRACTOR SHALL BE RESPONSIBLE FOR DAMAGE TO EXISTING UTILITIES, PAVEMENT, CURBS, TRAFFIC STRIPING AND MARKINGS, AutoCAD SHX Text TRAFFIC SIGNAL EQUIPMENT (INCLUDING DETECTOR LOOPS), STRUCTURES, TREES, LANDSCAPING, AND IRRIGATION SYSTEMS, AS A RESULT OF
AutoCAD SHX Text HIS OPERATIONS, AND WILL BE REQUIRED TO REPAIR, REMODEL OR REPLACE SAME TO THE SATISFACTION OF, AND AS DIRECTED BY, THE
AutoCAD SHX Text ANY RE-TESTING REQUIRED DUE TO FIRST TEST FAILURES SHALL BE MADE AT LOCATIONS ORDERED BY THE ENGINEER, AND SHALL BE AT
AutoCAD SHX Text CALIFORNIA TEST METHOD NO. 216 AND 231. THE CITY WILL FURNISH FIRST TESTS, WHEN REQUESTED, AT NO COST TO THE CONTRACTOR.
AutoCAD SHX Text TRENCH COMPACTION AND SUBGRADE COMPACTION TESTS SHALL BE PERFORMED BY A LABORATORY DESIGNATED BY THE CITY, UTILIZING
AutoCAD SHX Text CONSTRUCTION. SITE SHALL BE CLEANED UPON REQUEST OF THE INSPECTOR. THE CONTRACTOR SHALL IMMEDIATELY HAUL AWAY
AutoCAD SHX Text SUBCONTRACTORS WORKING FOR THE GENERAL CONTRACTOR ON THIS PROJECT SHALL ALSO BE REQUIRED TO HAVE A CITY OF TUSTIN
AutoCAD SHX Text THE CITY OF TUSTIN WILL ISSUE A CONSTRUCTION PERMIT FOR THIS PROJECT AT NO COST TO THE CONTRACTOR FOR WORK INSIDE THE CITY.
AutoCAD SHX Text NECESSARY ADJUSTMENTS IN GRADE TO CLEAR THESE UTILITIES AND NO ADDITIONAL PAYMENT SHALL BE GIVEN FOR SUCH ADJUSTMENTS.
AutoCAD SHX Text POLLUTANTS OFF THE SITE. SUCH "DISCHARGES" OF MATERIAL OTHER THAN STORM WATER ARE ALLOWED ONLY WHEN NECESSARY FOR
AutoCAD SHX Text PERFORMANCE AND COMPLETION OF CONSTRUCTION PRACTICES, AND WHERE THEY DO NOT: CAUSE OR CONTRIBUTE TO A VIOLATION OF
AutoCAD SHX Text WASH WATER AND CONCRETE WASH WATER; CONCRETE, DETERGENT OR FLOATABLE WASTES; WASTES FROM ANY ENGINE/EQUIPMENT STEAM
AutoCAD SHX Text SUCH MATERIALS SHOULD OCCUR IN A SPECIFIED AND CONTROLLED TEMPORARY AREA ON SITE, PHYSICALLY SEPARATED FROM POTENTIAL
AutoCAD SHX Text STORM WATER RUN-OFF, WITH ULTIMATE DISPOSAL IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS.
AutoCAD SHX Text ANY WATER QUALITY STANDARD; CAUSE OR THREATEN TO CAUSE POLLUTION, CONTAMINATION, OR NUISANCE; OR CONTAIN A HAZARDOUS
AutoCAD SHX Text SUBSTANCE IN A QUANTITY REPORTABLE UNDER FEDERAL REGULATIONS 40 CFR PARTS 117 AND 302.
AutoCAD SHX Text AGGREGATE BASE WATERED AND COMPACTED TO 95% OF MAXIMUM DENSITY AT OPTIMUM MOISTURE.
AutoCAD SHX Text THE WORK SITE AND EXTERIOR STREETS SHALL BE MAINTAINED IN A NEAT, CLEAN, HAZARD FREE, ORDERLY STATE, THROUGHOUT
AutoCAD SHX Text AND DISPOSE OF, OFF THE PROJECT SITE, ALL EXCESS EXCAVATED MATERIAL AND CONSTRUCTION DEBRIS. ALL DISPOSALS SHALL
AutoCAD SHX Text THE LOCATION OF EXISTING UTILITIES AS SHOWN ON THESE PLANS IS OBTAINED FROM A SEARCH OF EXISTING RECORDS. IT SHALL
AutoCAD SHX Text BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY RESPECTIVE UTILITIES AND UNDERGROUND SERVICE ALERT OF SOUTHERN
AutoCAD SHX Text CALIFORNIA 1(800) 422-4133 TO DETERMINE THE EXACT FIELD LOCATION OF UTILITIES WHICH MAY CONFLICT WITH HIS WORK.
AutoCAD SHX Text THE CONTRACTOR SHALL HAVE COPIES OF THE PLANS AND SPECIFICATIONS FOR THIS PROJECT ON THE SITE AT ALL TIMES, AutoCAD SHX Text A CITY OF TUSTIN BUSINESS LICENSE SHALL BE OBTAINED BY THE CONTRACTOR, AT HIS EXPENSE, PRIOR TO STARTING WORK.
AutoCAD SHX Text THE CONTRACTOR SHALL EXPOSE EXISTING UTILITIES FAR ENOUGH IN ADVANCE OF PIPE LAYING OPERATIONS IN ORDER TO MAKE
AutoCAD SHX Text REFER TO SPECIFICATIONS FOR TRAFFIC CONTROL, LENGTH OF OPEN TRENCH, BACKFILL, AND REPAVING REQUIREMENTS.
AutoCAD SHX Text THE CONTRACTOR'S EXPENSE - COST OF WHICH WILL BE DEDUCTED FROM THE CONTRACTOR'S FINAL PAYMENT.
AutoCAD SHX Text IN ACCORDANCE WITH THE CITY OF TUSTIN MINIMUM DESIGN STANDARDS FOR PUBLIC WORKS IMPROVEMENTS, THE CITY OF TUSTIN STREET
AutoCAD SHX Text ALL WORK SHALL BE IN ACCORDANCE WITH THE LATEST EDITION OF THE STANDARD SPECIFICATIONS FOR PUBLIC WORKS CONSTRUCTION, AND
AutoCAD SHX Text THE CITY ENGINEER'S OFFICE SHALL BE NOTIFIED AT LEAST TWO (2) WORKING DAYS PRIOR TO ANY INSPECTION, OR WORK NECESSARY
AutoCAD SHX Text SHALL BE CONSIDERED INCIDENTAL WORK, COST OF WHICH SHALL BE INCLUDED IN THE CONTRACTOR'S BID FOR PAY QUANTITY ITEMS.
AutoCAD SHX Text WORK SHOWN OR INDICATED ON THESE PLANS, OR CALLED FOR IN THE SPECIFICATIONS, BUT NOT INCLUDED AS PAY QUANTITY ITEMS, AutoCAD SHX Text IMPROVEMENT STANDARDS, LATEST CALTRANS STANDARD PLANS AND CA MUTCD, AND IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS, AutoCAD SHX Text
SEWER LINE
AutoCAD SHX Text
TELEPHONE CABLE OR CONDUIT
AutoCAD SHX Text
WATER LINE
AutoCAD SHX Text
PROPERTY LINE
AutoCAD SHX Text
CITY LIMITS LINE
AutoCAD SHX Text
CONCRETE OR ASPHALT CURB ONLY
AutoCAD SHX Text
TRAFFIC CONTROL SIGN
AutoCAD SHX Text
CONCRETE CURB & GUTTER
AutoCAD SHX Text
%%UPLAN SHEET STANDARD LEGEND
AutoCAD SHX Text
EXISTING TOPOGRAPHY
AutoCAD SHX Text
EXISTING UTILITIES (UNDERGROUND)
AutoCAD SHX Text
MISCELLANEOUS
AutoCAD SHX Text UNLESS OTHERWISE SPECIFIED, THE CONTRACTOR WILL FURNISH ALL CONSTRUCTION SURVEYS FOR THIS PROJECT AS DESCRIBED IN THE SPECIFICATIONS AT NO COST TO THE CITY. IN ADDITION, SURVEY POINTS DESTROYED AS A RESULT OF THE CONTRACTOR'S NEGLIGENCE OR FAILURE TO PROVIDE PROPER PROTECTION, SHALL BE REPLACED AT THE CONTRACTOR'S EXPENSE, COST OF WHICH SHALL BE DEDUCTED FROM THE CONTRACTOR'S FINAL PAYMENT.
AutoCAD SHX Text
ELECTRICAL LINE
AutoCAD SHX Text
STORM DRAIN LINE
AutoCAD SHX Text
RIGHT OF WAY LINE
AutoCAD SHX Text
BACK OF SIDEWALK
AutoCAD SHX Text
MANHOLE
AutoCAD SHX Text
FIRE HYDRANT
AutoCAD SHX Text
WATER VALVE
AutoCAD SHX Text
DRAIN
AutoCAD SHX Text
TRUNCATED DOME
AutoCAD SHX Text
EXISTING CONDUIT
AutoCAD SHX Text
EXISTING TRAFFIC SIGNAL EQUIPMENT
AutoCAD SHX Text
PROPOSED TRAFFIC SIGNAL EQUIPMENT
AutoCAD SHX Text
TRAFFIC SIGNAL EQUIPMENT
AutoCAD SHX Text
PROPOSED/EXISTING SIGNAL HEAD
AutoCAD SHX Text
PROPOSED/EXISTING LUMINAIRE
AutoCAD SHX Text
PROPOSED CONDUIT
AutoCAD SHX Text
PROPOSED/EXISTING SIGN
AutoCAD SHX Text
PROPOSED/EXISTING I.I.S.N.S.
AutoCAD SHX Text
PROPOSED/EXISTING PEDESTRIAN HEAD
AutoCAD SHX Text
PROPOSED/EXISTING PULL BOX
AutoCAD SHX Text
PROPOSED/EXISTING SIGNAL POLE
AutoCAD SHX Text
PROPOSED PEDESTRIAN PUSH BUTTON POST
AutoCAD SHX Text
EXISTING NEMA CABINET WITH SERVICE CAB.
AutoCAD SHX Text
EXISTING TYPE H AND TYPE E LOOPS
AutoCAD SHX Text No. C79151
AutoCAD SHX Text
ALL TO THE SATISFACTION OF THE CITY ENGINEER.
AutoCAD SHX Text
PROPOSED TYPE H AND TYPE E LOOPS
AutoCAD SHX Text AB AGGREGATE BASE AGGREGATE BASE AC ASPHALT CONCRETE ASPHALT CONCRETE ARHM ASPHALT RUBBERIZED HOT MIX ASPHALT RUBBERIZED HOT MIX BCR BEGIN CURB RETURN BEGIN CURB RETURN BkSW BACK OF SIDEWALK BACK OF SIDEWALK BOC BACK OF CURB BACK OF CURB B/W BACK OF WALK BACK OF WALK B/P BOTTOM OF PIPE BOTTOM OF PIPE BLDG BUILDING BUILDING CB CATCH BASIN CATCH BASIN CF CURB FACE CURB FACE CG CURB & GUTTER CURB & GUTTER CIP CAST IRON PIPE CAST IRON PIPE CL CENTERLINE CENTERLINE CLF CHAIN LINK FENCE CHAIN LINK FENCE CMB CRUSHED MISCELLANEOUS BASE CRUSHED MISCELLANEOUS BASE COT CITY OF TUSTIN CITY OF TUSTIN ECR END CURB RETURN END CURB RETURN E'LY EASTERLY EASTERLY EP EDGE OF PAVEMENT EDGE OF PAVEMENT EX. EXISTING EXISTING EXPJ EXPANSION JOINT EXPANSION JOINT FA FIRE ALARM FIRE ALARM FG FINISH GRADE FINISH GRADE FH FIRE HYDRANT FIRE HYDRANT FL FLOW LINE FLOW LINE FS FINISH SURFACE FINISH SURFACE FT FEET FEET GB GRADE BREAK GRADE BREAK GL GUTTER LIP GUTTER LIP MH MANHOLE MANHOLE MW MONITORING WELL MONITORING WELL NO. NUMBERNUMBER
AutoCAD SHX Text N'LY NORTHERLY NORTHERLY NTS NOT TO SCALE NOT TO SCALE PB PULLBOX PULLBOX PCC PORTLAND CEMENT CONCRETE PORTLAND CEMENT CONCRETE PKWY PARKWAY PARKWAY PIP PROTECT IN PLACE PROTECT IN PLACE PROPERTY LINE PROPERTY LINE PP POWER POLE POWER POLE PVC POLYVINYLCHLORIDE POLYVINYLCHLORIDE RCP REINFORCED CONCRETE PIPE REINFORCED CONCRETE PIPE R/W RIGHT-OF-WAY RIGHT-OF-WAY S= SLOPE SLOPE S'LY SOUTHERLY SOUTHERLY SD STORM DRAIN STORM DRAIN SDMH STORM DRAIN MANHOLE STORM DRAIN MANHOLE SF SQUARE FEET SQUARE FEET SHT SHEET SHEET SMH SEWER MANHOLE SEWER MANHOLE NO. STATION STATION STD. STANDARD STANDARD STLT STREET LIGHT STREET LIGHT TC TOP OF CURB TOP OF CURB TSP TRAFFIC SIGNAL POLE TRAFFIC SIGNAL POLE TSPB TRAFFIC SIGNAL PULL BOX TRAFFIC SIGNAL PULL BOX TSC TRAFFIC SIGNAL CABINET TRAFFIC SIGNAL CABINET TYP. TYPICAL TYPICAL W'LY WESTERLY WESTERLY WCR WHEEL CHAIR RAMP WHEEL CHAIR RAMP WM WATER METER WATER METER WPJ WEAKENED PLANT JOINT WEAKENED PLANT JOINT WV WATER VALVE WATER VALVE XG CROSS GUTTERCROSS GUTTER
AutoCAD SHX Text
KENNY T. NGUYEN, R.C.E. 66036 DEPUTY DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
AutoCAD SHX Text
DATE
AutoCAD SHX Text
PREPARED UNDER THE SUPERVISION OF:
AutoCAD SHX Text
JOSHUA G. MCNEILL, PROJECT MANAGER
AutoCAD SHX Text 08/03/2026
AutoCAD SHX Text
SEAL
AutoCAD SHX Text N
AutoCAD SHX Text www.DigAlert.org
AutoCAD SHX Text
TWO WORKING DAYS BEFORE YOU DIG
AutoCAD SHX Text
NOTICE TO CONTRACTOR
AutoCAD SHX Text PURSUANT TO ASSEMBLY BILL 4216 NO EXCAVATION PERMIT IS VALID UNLESS THE CONTRACTOR CONTACTS AND OBTAINS A DIG ALERT TICKET NUMBER. CALL 811 AT LEAST TWO WORKING DAYS PRIOR TO COMMENCING EXCAVATION.
AutoCAD SHX Text Know what's
AutoCAD SHX Text below.
AutoCAD SHX Text before you dig.
AutoCAD SHX Text Call
AutoCAD SHX Text
SHEET INDEX
AutoCAD SHX Text
SHT NO.
AutoCAD SHX Text
TITLE
AutoCAD SHX Text
SHT NAME
AutoCAD SHX Text
AutoCAD SHX Text
TITLE SHEET
AutoCAD SHX Text T-01
AutoCAD SHX Text
AutoCAD SHX Text
STREET IMPROVEMENT PLAN
AutoCAD SHX Text
ST-01
AutoCAD SHX Text
AutoCAD SHX Text
TRAFFIC SIGNAL IMPROVEMENT PLAN
AutoCAD SHX Text
SG-01
AU
TO
C
EN
TE
R D
R
EL CAMINO REAL
¾”
Underground Service Alert of Southern California
R
ST-01
SHT 02 OF 03
EL CAMINO REAL/ AUTO CENTER DRIVE
SIGNAL IMPROVEMENTS
STREET IMPROVEMENT PLAN
EL CAMINO REAL & AUTO CENTER DR
Docusign Envelope ID: 6F56A9C9-4ACB-8C93-8074-E55BF8905DD9
08/05/26
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
1 INCH = FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 2.5
AutoCAD SHX Text
%%ULEGEND:%%U
AutoCAD SHX Text
PAVEMENT STRUCTURAL SECTION DETECTABLE WARNING SURFACE SAWCUT LIMITS
AutoCAD SHX Text
%%UABBREVIATIONS:%%U
AutoCAD SHX Text FS FINISH SURFACE FINISH SURFACE TC TOP OF CURB TOP OF CURB BOC BACK OF CURB BACK OF CURB FL FLOW LINE FLOW LINE BkSW BACK OF SIDEWALK BACK OF SIDEWALK BCR BEGIN CURB RETURN BEGIN CURB RETURN ECR END CURB RETURN END CURB RETURN PB PULL BOX PULL BOX TSPB TRAFFIC SIGNAL PULL BOX TRAFFIC SIGNAL PULL BOX AC ASPHALT CONCRETE ASPHALT CONCRETE PCC PORTLAND CEMENT CONCRETE PORTLAND CEMENT CONCRETE CF CURB FACE CURB FACE WPJ WEAKENED PLAN JOINT WEAKENED PLAN JOINT EXPJ EXPANSION JOINTEXPANSION JOINT
AutoCAD SHX Text CONSTRUCT 4" THICK PCC (CLASS 560-C-3250) SIDEWALK PER CITY OF TUSTIN DEPARTMENT OF PUBLIC WORKS STD. NO. 202. CONSTRUCT 4" PCC CURB RAMP PER CITY OF TUSTIN DEPARTMENT OF PUBLIC WORKS STD. NO. 211 FROM BCR TO ECR. SAWCUT AND REMOVE EXISTING PCC RAMP AND SIDEWALK. SAWCUT CONCRETE CROSS GUTTER 6" FROM FLOW LINE. SEE SECTION A-A FOR DETAIL. CONSTRUCT PCC (CLASS 560-C-3250) DRIVEWAY APRON AND CURB RAMP AS A SINGLE MONOLITHIC POUR. MATCH DEPTH OF EXISTING CONCRETE. (APPROX. 7"). DOWEL IN EXISTING CONCRETE APRON WITH #4 GRADE 60 AT 18" O.C. WITH EPOXY.
AutoCAD SHX Text
%%UCONSTRUCTION NOTES (THIS SHEET ONLY):
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%UDETAIL A
AutoCAD SHX Text 1":5'
AutoCAD SHX Text A
AutoCAD SHX Text A
AutoCAD SHX Text
%%USECTION A-A%%U
AutoCAD SHX Text
NTS
AutoCAD SHX Text 8.91' 8.16%
AutoCAD SHX Text 8.97' 8.04%
AutoCAD SHX Text 5.87' 9.37%
AutoCAD SHX Text 6.125' 9.62%
AutoCAD SHX Text 12.08' 1.99%
AutoCAD SHX Text 14.7' 1.5%
AutoCAD SHX Text 14.5' 1.72%
AutoCAD SHX Text 15.6' 0.51%
AutoCAD SHX Text 10' (3.5%)
AutoCAD SHX Text 4.7' (2.77%)
AutoCAD SHX Text 8.75' 1.49%
AutoCAD SHX Text 6' 0.17%
AutoCAD SHX Text 4' 0.5%
AutoCAD SHX Text 5' 1.2%
AutoCAD SHX Text 6.4' 0.59%
AutoCAD SHX Text
2211879.46 N 6091267.27 E BCR,JOIN EXIST FL (82.08) TC (82.58)
AutoCAD SHX Text
FL 81.75 TC 82.33
AutoCAD SHX Text
FL 81.71 TC 81.71
AutoCAD SHX Text 4' 1.5%
AutoCAD SHX Text
FL 81.69 TC 81.69
AutoCAD SHX Text
FL 81.65 TC 82.22
AutoCAD SHX Text
2211876.26 N 6091219.08 E ECR,JOIN EXIST FL (81.57) TC (82.14)
AutoCAD SHX Text
FS (82.49)
AutoCAD SHX Text
FS 82.45
AutoCAD SHX Text
FS 82.53
AutoCAD SHX Text
FS 82.55
AutoCAD SHX Text
FS 82.57
AutoCAD SHX Text
FS (82.71)
AutoCAD SHX Text
FS 82.44
AutoCAD SHX Text
FS 82.41
AutoCAD SHX Text 6.27' 1.8%
AutoCAD SHX Text 1.8% 6.6'
AutoCAD SHX Text 4' 0.65%
AutoCAD SHX Text
EX. CROSS GUTTER
AutoCAD SHX Text 9'
AutoCAD SHX Text 6.43'
AutoCAD SHX Text
6" SAWCUT
AutoCAD SHX Text
6" CURB
AutoCAD SHX Text 8.05%
AutoCAD SHX Text 1.8%
AutoCAD SHX Text 5.0%
AutoCAD SHX Text
2211869.82 N 6091251.62 E FL 81.72 TC 82.3
AutoCAD SHX Text 0.72% 4.17'
AutoCAD SHX Text
2211868.25 N 6091235.96 E FL 81.66 TC 82.24
AutoCAD SHX Text
LIP (81.36) FL (81.26)
AutoCAD SHX Text
FL (81.35) TC (82.14)
AutoCAD SHX Text
PROP. TSPB
AutoCAD SHX Text
EXIST. TS STANDARD
AutoCAD SHX Text
PROP. TS STANDARD
AutoCAD SHX Text
PROP. PPB POST
AutoCAD SHX Text
PROP. TSPB
AutoCAD SHX Text
AutoCAD SHX Text
INSTALL BLACK 3'X4' CAST-IN-PLACE DETECTABLE WARNING SURFACE
AutoCAD SHX Text 12" WIDE BORDER GROOVING GROOVING DETAIL PER CITY OF TUSTIN PUBLIC WORKS STD. NO. 211
AutoCAD SHX Text
12" WIDE BORDER GROOVING
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text BkSW
AutoCAD SHX Text BkSW
AutoCAD SHX Text
LIP (81.49) FL (81.37)
AutoCAD SHX Text
LIP (81.61) FL (81.46)
AutoCAD SHX Text THE COORDINATES SHOWN HEREON ARE BASED UPON THE CALIFORNIA COORDINATE SYSTEM OF 1983, CCS83, ZONE 6, (2017.50 EPOCH) IN ACCORDANCE WITH THE CALIFORNIA PUBLIC RESOURCES CODE SECTIONS 8801-8819; SAID COORDINATES ARE BASED LOCALLY UPON THE FOLLOWING O.C. PUBLIC WORKS PUBLISHED CONTROL POINTS: GPS # NORTHING EASTING 6561 2210968.47 6093456.04 6562 2212885.19 6094336.48 ALL DISTANCES SHOWN HEREON ARE GRID DISTANCES AND ARE IN U.S. SURVEY FOOT. GROUND DISTANCES CAN BE OBTAINED BY MULTIPLYING GRID DISTANCES BY A GROUND SCALE FACTOR OF 1.0000208435.
AutoCAD SHX Text THE ELEVATIONS SHOWN HEREON ARE BASED UPON THE ORANGE COUNTY PUBLIC WORKS BENCHMARK NO. 3G-40-91, (YEAR 1991). THE MONUMENT IS A 3 ¾” OCS ALUMINUM BENCHMARK DISK STAMPED (3G-40-91). SET IN THE OCS ALUMINUM BENCHMARK DISK STAMPED (3G-40-91). SET IN THE NORTHEASTERLY CORNER OF A 4 FT. BY 4 FT. CONCRETE CATCH BASIN. THE MONUMENT IS LOCATED IN THE NORTHWESTERLY CORNER OF THE INTERSECTION OF JAMBOREE ROAD AND KELLER DRIVE, 56 FT. NORTHERLY OF THE CENTERLINE OF KELLER DRIVE AND 56 FT. WESTERLY OF THE CENTERLINE OF JAMBOREE ROAD. THE MONUMENT IS SET LEVEL WITH THE SIDEWALK. NAVD88 ELEV. = 127.695'
AutoCAD SHX Text
BASIS OF BEARINGS
AutoCAD SHX Text
BENCH MARK
AutoCAD SHX Text
2211867.75 N 6091243.82 E FL 81.70 TC 81.70
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REFERENCES
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BENCHMARK NO:
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
PREPARED UNDER THE SUPERVISION OF:
AutoCAD SHX Text
REVIEWED FOR CONSTRUCTABILITY & RECOMMENDED FOR CONSTRUCTION:
AutoCAD SHX Text
NAME
AutoCAD SHX Text
NAME
AutoCAD SHX Text NAME R.C.E. No.XXXXXR.C.E. No.XXXXX
AutoCAD SHX Text
DESIGNED: XX DRAWN: XX CHECKED: XX
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CITY OF TUSTIN
AutoCAD SHX Text
EL CAMINO REAL/ AUTO CENTER SIGNAL IMPROVEMENTS PLAN SHEET NAME TUSTIN
AutoCAD SHX Text
TE-566
AutoCAD SHX Text
SHT NAME
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
XX-XX
AutoCAD SHX Text
SHT XX OF XX
AutoCAD SHX Text www.DigAlert.org
AutoCAD SHX Text
TWO WORKING DAYS BEFORE YOU DIG
AutoCAD SHX Text
NOTICE TO CONTRACTOR
AutoCAD SHX Text PURSUANT TO ASSEMBLY BILL 4216 NO EXCAVATION PERMIT IS VALID UNLESS THE CONTRACTOR CONTACTS AND OBTAINS A DIG ALERT TICKET NUMBER. CALL 811 AT LEAST TWO WORKING DAYS PRIOR TO COMMENCING EXCAVATION.
AutoCAD SHX Text Know what's
AutoCAD SHX Text below.
AutoCAD SHX Text before you dig.
AutoCAD SHX Text Call
AutoCAD SHX Text NAME R.C.E. No.XXXXXR.C.E. No.XXXXX
AutoCAD SHX Text
TRANSPORTATION ENGINEER
AutoCAD SHX Text 4' 0.25%
AutoCAD SHX Text 4' 0.5%
AutoCAD SHX Text
FS 82.51
AutoCAD SHX Text
FS 82.56
AutoCAD SHX Text 7.69' 1.84%
AutoCAD SHX Text
FS 82.44
AutoCAD SHX Text
FS 82.38
AutoCAD SHX Text 8.39' 1.73%
AutoCAD SHX Text 3.3' 0.61%
AutoCAD SHX Text
EXPJ
AutoCAD SHX Text
EXPJ
AutoCAD SHX Text
1/4" EXPANSION JOINT
AutoCAD SHX Text
1/4" EXPANSION JOINT
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text No. C79151
AutoCAD SHX Text R.C.E. 79151
AutoCAD SHX Text
JOSHUA G. MCNEILL
AutoCAD SHX Text
DESIGNED: JM DRAWN: RL CHECKED: NK
AutoCAD SHX Text
JOSHUA G. MCNEILL
AutoCAD SHX Text 8/3/26
AutoCAD SHX Text
KENNY T. NGUYEN
AutoCAD SHX Text
KENNY T. NGUYEN
AutoCAD SHX Text R.C.E. 66036
DEPUTY DIRECTOR OF PUBLIC WORKS/CITY ENGINEER
Underground Service Alert of Southern California
R
A U
TO
C
E N
TE
R
D R
(2
M P
H
EL CAMINO REAL (35 MPH)
Ø3
Ø5 Ø6 Ø7
EXISTING PHASE DIAGRAM
Ø1 Ø2 Ø4
Ø8
PROTECTED/
PERMISSIVE
PROTECTED/
PERMISSIVE
Ø1+Ø4
Ø3
Ø5 Ø6 Ø7
PROPOSED PHASE DIAGRAM
Ø1 Ø2 Ø4
Ø8
CONSTRUCTION NOTES:
REMOVE AND SALVAGE EXISTING TRAFFIC SIGNAL POLE AND EQUIPMENT AS SHOWN ON THE PLAN. SALVAGED
EQUIPMENT IS TO BE DELIVERED TO THE CITY YARD.
FURNISH AND INSTALL NEW TYPE 26-4-100 TRAFFIC SIGNAL POLE AND EQUIPMENT ON NEW FOUNDATION AS
SHOWN ON THE PLAN.
FURNISH AND INSTALL NEW TYPE 2 POST ON NEW FOUNDATION PER THE POLE SCHEDULE.
FURNISH AND INSTALL NEW THREE-SECTION LEFT-TURN ARROW SIGNAL HEAD PER DETAIL "C".
REMOVE AND SALVAGE EXISTING MAS-5A SIGNAL HEAD AND REPLACE WITH NEW FURNISHED THREE-SECTION LEFT-TURN ARROW SIGNAL HEAD PER DETAIL "C". SALVAGED EQUIPMENT IS TO BE DELIVERED TO THE CITY
YARD.
REMOVE AND SALVAGE EXISTING 5-SECTION SIGNAL HEAD. FURNISH AND INSTALL NEW THREE-SECTION LEFT TURN ARROW SIGNAL HEAD PER DETAIL "C". SALVAGED EQUIPMENT IS TO BE DELIVERED TO THE CITY YARD.
FURNISH AND INSTALL NEW SIGN AS SHOWN ON THE PLAN.
REMOVE AND RELOCATE EXISTING INTERNALLY ILLUMINATED STREET NAME SIGN.
FURNISH AND INSTALL POLARA NAVIGATOR iN2 APS PUSH BUTTON AND 5X7 "R10-3B" BRAILLE SIGN.
REMOVE AND SALVAGE EXISTING PUSH BUTTONS AND SIGNS COMPLETE. FURNISH AND INSTALL POLARA NAVIGATOR iN2 APS PUSH BUTTONS AND 5X7 "R10-3B" BRAILLE SIGNS. SALVAGED EQUIPMENT IS TO BE
DELIVERED TO THE CITY YARD.
REMOVE EXISTING #6 PULL BOX. FURNISH AND INSTALL NEW #6 PULL BOX. SALVAGED EQUIPMENT IS TO BE
DELIVERED TO THE CITY YARD.
FURNISH AND INSTALL NEW 2" CONDUIT.
REMOVE AND SALVAGE EXISTING POLARA CONTROLLER UNIT. FURNISH AND INSTALL (1) POLARA NAVIGATOR iN2 APS CONTROLLER UNIT IN EXISTING CONTROLLER CABINET. COMPLETE ALL CONNECTIONS FOR INTENDED OPERATION. SALVAGED EQUIPMENT IS TO BE DELIVERED TO THE CITY YARD.
FURNISH AND INSTALL TYPE E LOOPS WITH 2" STUB OUT.
REMOVE AND SALVAGE. SALVAGED EQUIPMENT IS TO BE DELIVERED TO THE CITY YARD.
PROTECT IN PLACE.
INSTALL PULL BOX IN EXISTING CONDUIT RUN.
FOUNDATION TO BE ABANDONED.
ABANDON LOOPS.
OLA
Ø1+Ø4
OLA
SG-01
SHT 03 OF 03
EL CAMINO REAL/ AUTO CENTER DRIVE
SIGNAL IMPROVEMENTS
TRAFFIC SIGNAL IMPROVEMENT PLAN
EL CAMINO REAL & AUTO CENTER DR
Docusign Envelope ID: 6F56A9C9-4ACB-8C93-8074-E55BF8905DD9
08/05/26
AutoCAD SHX Text E
AutoCAD SHX Text
GRAPHIC SCALE
AutoCAD SHX Text
1 INCH = FEET
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
REFERENCES
AutoCAD SHX Text
NO.
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DESCRIPTION
AutoCAD SHX Text
BENCHMARK NO:
AutoCAD SHX Text
INITIALS
AutoCAD SHX Text
APPROVED
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWING NO.
AutoCAD SHX Text
PREPARED UNDER THE SUPERVISION OF:
AutoCAD SHX Text
REVIEWED FOR CONSTRUCTABILITY & RECOMMENDED FOR CONSTRUCTION:
AutoCAD SHX Text
NAME
AutoCAD SHX Text
NAME
AutoCAD SHX Text NAME R.C.E. No.XXXXXR.C.E. No.XXXXX
AutoCAD SHX Text
DESIGNED: XX DRAWN: XX CHECKED: XX
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CITY OF TUSTIN
AutoCAD SHX Text
EL CAMINO REAL/ AUTO CENTER SIGNAL IMPROVEMENTS PLAN SHEET NAME TUSTIN
AutoCAD SHX Text
TE-566
AutoCAD SHX Text
SHT NAME
AutoCAD SHX Text
SEAL
AutoCAD SHX Text
XX-XX
AutoCAD SHX Text
SHT XX OF XX
AutoCAD SHX Text www.DigAlert.org
AutoCAD SHX Text
TWO WORKING DAYS BEFORE YOU DIG
AutoCAD SHX Text
NOTICE TO CONTRACTOR
AutoCAD SHX Text PURSUANT TO ASSEMBLY BILL 4216 NO EXCAVATION PERMIT IS VALID UNLESS THE CONTRACTOR CONTACTS AND OBTAINS A DIG ALERT TICKET NUMBER. CALL 811 AT LEAST TWO WORKING DAYS PRIOR TO COMMENCING EXCAVATION.
AutoCAD SHX Text Know what's
AutoCAD SHX Text below.
AutoCAD SHX Text before you dig.
AutoCAD SHX Text Call
AutoCAD SHX Text NAME R.C.E. No.XXXXXR.C.E. No.XXXXX
AutoCAD SHX Text
TRANSPORTATION ENGINEER
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Ø6
AutoCAD SHX Text Ø1
AutoCAD SHX Text Ø3
AutoCAD SHX Text Ø3
AutoCAD SHX Text Ø3
AutoCAD SHX Text Ø1
AutoCAD SHX Text Ø6
AutoCAD SHX Text Ø4
AutoCAD SHX Text Ø4
AutoCAD SHX Text
Ø1+Ø4 OLA
AutoCAD SHX Text Ø5
AutoCAD SHX Text Ø6
AutoCAD SHX Text Ø5
AutoCAD SHX Text Ø2
AutoCAD SHX Text Ø2
AutoCAD SHX Text Ø4
AutoCAD SHX Text Ø3
AutoCAD SHX Text Ø6P
AutoCAD SHX Text Ø4P
AutoCAD SHX Text Ø4P
AutoCAD SHX Text Ø2P
AutoCAD SHX Text Ø2P
AutoCAD SHX Text
EX. 2"C, 1-DLC
AutoCAD SHX Text
105' TO
AutoCAD SHX Text
BCR
AutoCAD SHX Text
305' TO
AutoCAD SHX Text
BCR
AutoCAD SHX Text
280' TO
AutoCAD SHX Text
BCR
AutoCAD SHX Text
AutoCAD SHX Text
SEE DETAIL "A"
AutoCAD SHX Text
DETAIL "A" SCALE 1":10'
AutoCAD SHX Text
AutoCAD SHX Text
DETAIL "C"
AutoCAD SHX Text
12" RED ARROW (L.E.D.)
AutoCAD SHX Text
12" GREEN ARROW (L.E.D.)
AutoCAD SHX Text
12" YELLOW ARROW (L.E.D.)
AutoCAD SHX Text
RS
AutoCAD SHX Text
R73-7(MOD)
AutoCAD SHX Text
PPB QUADRANT DETAIL
AutoCAD SHX Text
(TOP VIEW)
AutoCAD SHX Text
NO SCALE
AutoCAD SHX Text E
AutoCAD SHX Text N
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
RS
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
PP
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1-Ø2
AutoCAD SHX Text 1-Ø5
AutoCAD SHX Text 1-Ø6
AutoCAD SHX Text 1-Ø1
AutoCAD SHX Text 1-Ø4
AutoCAD SHX Text 2-Ø4
AutoCAD SHX Text 3-Ø4
AutoCAD SHX Text 2-Ø3
AutoCAD SHX Text 3-Ø3
AutoCAD SHX Text
BC
AutoCAD SHX Text
BC
AutoCAD SHX Text
BC
AutoCAD SHX Text R3-4
AutoCAD SHX Text
DETAIL "B" SCALE 1":10'
AutoCAD SHX Text
PROPOSED POLE SCHEDULE
AutoCAD SHX Text
SIGNAL MOUNTINGS
AutoCAD SHX Text
VEHICULAR
AutoCAD SHX Text M.A.
AutoCAD SHX Text
(DOUBLE FACE)
AutoCAD SHX Text
IISNS
AutoCAD SHX Text
POLE DATA
AutoCAD SHX Text
AutoCAD SHX Text
NO.
AutoCAD SHX Text
TYPE
AutoCAD SHX Text
L.E.D. LUMINAIRE
AutoCAD SHX Text
LED
AutoCAD SHX Text
SIGNAL
AutoCAD SHX Text M.A.
AutoCAD SHX Text
HEIGHT
AutoCAD SHX Text M.A.
AutoCAD SHX Text
PEDESTRIAN
AutoCAD SHX Text Auto Center Dr(RL FROM)
AutoCAD SHX Text A.P.S.
AutoCAD SHX Text Ø
AutoCAD SHX Text
POLE QUAD
AutoCAD SHX Text E(R)
AutoCAD SHX Text
POLE LOCATION
AutoCAD SHX Text A
AutoCAD SHX Text
EX.
AutoCAD SHX Text B
AutoCAD SHX Text
EX.
AutoCAD SHX Text C
AutoCAD SHX Text
EX.
AutoCAD SHX Text 24-4-70(R)
AutoCAD SHX Text 35'(R)
AutoCAD SHX Text 30'(R)
AutoCAD SHX Text 15'(R)
AutoCAD SHX Text
SP-1-CS(R)
AutoCAD SHX Text 90(R)
AutoCAD SHX Text
SV-1-T(R)
AutoCAD SHX Text
MAS(R), MAS5-A(R)
AutoCAD SHX Text 4(R)
AutoCAD SHX Text Auto Center Dr(RL TO)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5.5'
AutoCAD SHX Text 26-4-100(N)
AutoCAD SHX Text 45'(N)
AutoCAD SHX Text 30'(N)
AutoCAD SHX Text 15'(N)
AutoCAD SHX Text
SP-1-CS(N)
AutoCAD SHX Text 90(N)
AutoCAD SHX Text
SV-1-T(N)
AutoCAD SHX Text
AutoCAD SHX Text
2-MAS(N)
AutoCAD SHX Text
AutoCAD SHX Text S(N)
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text 1-A
AutoCAD SHX Text
AutoCAD SHX Text 10'
AutoCAD SHX Text
AutoCAD SHX Text
SP-1-CS
AutoCAD SHX Text
AutoCAD SHX Text
TV-2-T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text El Camino Real
AutoCAD SHX Text S(N)
AutoCAD SHX Text 19-3-70
AutoCAD SHX Text 25'
AutoCAD SHX Text 30'
AutoCAD SHX Text 15'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
2-SV-1-T
AutoCAD SHX Text
AutoCAD SHX Text
MAS-4C
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1-A
AutoCAD SHX Text
AutoCAD SHX Text 10'
AutoCAD SHX Text
AutoCAD SHX Text
SP-1-CS
AutoCAD SHX Text
AutoCAD SHX Text
TV-2-T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Auto Center Dr
AutoCAD SHX Text
AutoCAD SHX Text 24-4-70
AutoCAD SHX Text 35'
AutoCAD SHX Text 30'
AutoCAD SHX Text 15'
AutoCAD SHX Text
SP-1-CS
AutoCAD SHX Text
AutoCAD SHX Text
SV-1-T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text N(N)
AutoCAD SHX Text 1-A
AutoCAD SHX Text
AutoCAD SHX Text 10'
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TV-2-T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text El Camino Real
AutoCAD SHX Text N(N)
AutoCAD SHX Text 19-3-70
AutoCAD SHX Text 30'
AutoCAD SHX Text 30'
AutoCAD SHX Text 15'
AutoCAD SHX Text
SP-1-CS
AutoCAD SHX Text
AutoCAD SHX Text
SV-1-T
AutoCAD SHX Text
AutoCAD SHX Text
MAS
AutoCAD SHX Text
AutoCAD SHX Text E(N)
AutoCAD SHX Text 1-A
AutoCAD SHX Text
AutoCAD SHX Text 10'
AutoCAD SHX Text
AutoCAD SHX Text
SP-1-CS
AutoCAD SHX Text
AutoCAD SHX Text
TV-2-T
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 5.5'
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text E(N)
AutoCAD SHX Text
AutoCAD SHX Text 12.5'
AutoCAD SHX Text
TYPE 2 POST (N)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 4(N)
AutoCAD SHX Text
AutoCAD SHX Text 5'
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
EX.
AutoCAD SHX Text
MAS, MAS(N) MAS5-A(R)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text ALL EQUIPMENT IS EXISTING UNLESS OTHERWISE NOTED. (N) = NEW (R) = REMOVE (RL FROM) = RELOCATE FROM (RL TO) = RELOCATE TO
AutoCAD SHX Text
EX. 2"C, REMOVE 1-DLC, REUSE I.C.C
AutoCAD SHX Text R3-4
AutoCAD SHX Text F=12.5'
AutoCAD SHX Text 2-Ø2
AutoCAD SHX Text 2-Ø2
AutoCAD SHX Text 2-Ø2
AutoCAD SHX Text
FA
AutoCAD SHX Text
AutoCAD SHX Text
FA
AutoCAD SHX Text F=16'
AutoCAD SHX Text 2.5'
AutoCAD SHX Text 2-Ø4
AutoCAD SHX Text 3-Ø3
AutoCAD SHX Text 2-Ø6
AutoCAD SHX Text 2-Ø6
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text C
AutoCAD SHX Text C
AutoCAD SHX Text B
AutoCAD SHX Text A
AutoCAD SHX Text
ECR
AutoCAD SHX Text
BCR
AutoCAD SHX Text
%%UPOLE PLACEMENT
AutoCAD SHX Text F.C.
AutoCAD SHX Text NOTE: THERE SHALL BE A MINIMUM CLEAR DISTANCE OF 2'-0" BETWEEN THE CURB FACE(F.C.) AND THE FACE OF POLE.
AutoCAD SHX Text Ø2
AutoCAD SHX Text
EX. SCE SERVICE VAULT
AutoCAD SHX Text
EX. 2.5"C, SIGNAL SERVICE
AutoCAD SHX Text
EX. ICC TO MYFORD RD.
AutoCAD SHX Text R3-4
AutoCAD SHX Text R3-4
AutoCAD SHX Text R9-3, R9-3A(M0D)
AutoCAD SHX Text R9-3, R9-3A(M0D)
AutoCAD SHX Text
AutoCAD SHX Text
185' TO
AutoCAD SHX Text
LIMIT LINE
AutoCAD SHX Text
185' TO
AutoCAD SHX Text
CROSSWALK
AutoCAD SHX Text (2)
AutoCAD SHX Text
AB
AutoCAD SHX Text
EX. 2"C, REMOVE 1-DLC, INSTALL 1-DLC, REUSE I.C.C.
AutoCAD SHX Text
EX. 2"C, REMOVE 1-DLC, INSTALL 1-DLC
AutoCAD SHX Text
EX. 2"C, REMOVE 1-DLC
AutoCAD SHX Text
EX. I.C.C TO TUSTIN RANCH RD.
AutoCAD SHX Text
EX. 2.5"C, SIGNAL SERVICE
AutoCAD SHX Text
EX. 2"C, I.C.C.
AutoCAD SHX Text 3'-6" (N)
AutoCAD SHX Text
Ø1+Ø4 OLA
AutoCAD SHX Text
EX. 2"C, REMOVE 1-DLC, REUSE I.C.C
AutoCAD SHX Text
EX. 2"C, REMOVE 1-DLC, INSTALL 1-DLC, REUSE I.C.C.
AutoCAD SHX Text
EX.2"C, REMOVE 1-DLC, INSTALL 1-DLC, REUSE I.C.C
AutoCAD SHX Text
EX. 2"C, REMOVE 1-DLC
AutoCAD SHX Text (2)
AutoCAD SHX Text (2)
AutoCAD SHX Text (3)
AutoCAD SHX Text
EX. 2"C, REMOVE 1-DLC, INSTALL 1-DLC
AutoCAD SHX Text Ø6P
AutoCAD SHX Text No. C92006
AutoCAD SHX Text
CONDUCTOR SCHEDULE
AutoCAD SHX Text
CIRCUIT
AutoCAD SHX Text
AWG
AutoCAD SHX Text
RUN
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text #14
AutoCAD SHX Text
AutoCAD SHX Text #10
AutoCAD SHX Text
SIGNAL COMMON
AutoCAD SHX Text
LUMINAIRE
AutoCAD SHX Text
TOTAL CABLES
AutoCAD SHX Text %%C1
AutoCAD SHX Text
AutoCAD SHX Text %%C2
AutoCAD SHX Text %%C4
AutoCAD SHX Text %%C5
AutoCAD SHX Text %%C6
AutoCAD SHX Text %%C2P
AutoCAD SHX Text %%C6P
AutoCAD SHX Text I.I.S.N.S.
AutoCAD SHX Text
TOTAL CABLES
AutoCAD SHX Text #12
AutoCAD SHX Text
%%C2 PPB
AutoCAD SHX Text
%%C6 PPB
AutoCAD SHX Text
PPB COMMON
AutoCAD SHX Text
SPARES
AutoCAD SHX Text
CONDUIT SIZE
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
%%C4 PPB
AutoCAD SHX Text %%C4P
AutoCAD SHX Text %%C3
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 2-3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 3"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 2.5"
AutoCAD SHX Text 2-3"
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3(R)
AutoCAD SHX Text 3(R)
AutoCAD SHX Text 3(R)
AutoCAD SHX Text 3(R)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
SIGNAL SERVICE
AutoCAD SHX Text #8
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TOTAL CABLES
AutoCAD SHX Text %%C1
AutoCAD SHX Text %%C2
AutoCAD SHX Text %%C4
AutoCAD SHX Text %%C5
AutoCAD SHX Text %%C6
AutoCAD SHX Text %%C3
AutoCAD SHX Text
DLC
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1,1*
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONDUIT PERCENT FILL
AutoCAD SHX Text 8%%%
AutoCAD SHX Text 21%%%
AutoCAD SHX Text 12%%%
AutoCAD SHX Text 16%%%
AutoCAD SHX Text 17%%%
AutoCAD SHX Text 20%%%
AutoCAD SHX Text 11%%%
AutoCAD SHX Text 15%%%
AutoCAD SHX Text 15%%%
AutoCAD SHX Text
6 PR I.C.C.
AutoCAD SHX Text #22
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 1,1*
AutoCAD SHX Text 1,1*
AutoCAD SHX Text 1,1*
AutoCAD SHX Text 1,1*
AutoCAD SHX Text 1,1*
AutoCAD SHX Text
%%C1+%%C4 OLA
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
CONDUCTOR SCHEDULE (CONT.)
AutoCAD SHX Text ALL CONDUITS, CABLES AND CONDUCTORS ARE EXISTING UNLESS OTHERWISE NOTED. (*) = REMOVE 1-DLC, INSTALL 1-DLC (R) = REMOVE CONDUCTORS
AutoCAD SHX Text
BOWEN YANG
AutoCAD SHX Text R.C.E. 92006
AutoCAD SHX Text
DESIGNED: BY DRAWN: DS CHECKED: NK
AutoCAD SHX Text 8/3/26
AutoCAD SHX Text
BOWEN YANG
AutoCAD SHX Text
KYRA TAO
AutoCAD SHX Text
KYRA TAO
AutoCAD SHX Text R.C.E. 81115
PRINCIPAL TRANSPORTATION ENGINEER
| Sheets and Views |
| 13223 Tustin TSM Title Sheet-SHEET 1 |
| 13223 Tustin TSM Ramp Detail Plan-SHEET 2 |
| 13223 Tustin TSM (Loop Upgrades)-SHEET 3 |
| 2026-08-05T11:08:44-0700 | |
| Digitally verifiable PDF exported from www.docusign.com |
File details come from the government source that posted it. Updated .