This document is a Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction for the Department of the Air Force. The document seeks to procure Toshiba or Mitsubishi UPS (Uninterruptible Power Supply) systems for the remote Alaska location of Tin City and 15 additional Alaska Radar Sites, with an estimated cost of $199,200. The unique requirements stem from the geographic isolation, which necessitates UPS systems with open-architecture accessibility, allowing comprehensive lifecycle management and third-party maintenance by qualified technicians.
The justification emphasizes that only Toshiba and Mitsubishi offer PCCIE-listed UPS systems that permit third-party maintenance without proprietary restrictions. Other UPS manufacturers require OEM-trained technicians, manufacturer-authorized service personnel, and proprietary licensing, which would significantly limit maintenance capabilities in remote locations. The Contracting Officer has determined the cost will be fair and reasonable through market research, price comparisons, and an Independent Government Estimate, with plans to actively negotiate with the selected vendor to obtain the best possible price and terms.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction
CONTROLLED UNCLASSIFIED INFORMATION
v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 5v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 1 of 5
Is this a brand-name justification? Yes No Please provide the product title and description. [ FAR16.505(a)(4)(i) ]
Brand-Name Product Title: Toshiba or Mitsubishi UPS Systems
Brand-Name Product Description: UPSs with open-market training, software and firmware availability
Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan? Yes No
Contracting Activity: AFLCMC/HBA
Purchase Request / Local ID Number: Purchase Request Number to be determined after receipt of proposal
Program Name (and Program Element, if applicable): Power Conditioning Continuation and Interfacing Equipment (PCCIE)
Estimated Cost/Price of the Order (including options): $199,200.00
Type Program (see DAFFARS 5302.101 for definitions): PEO Program Operational Enterprise
Type of D etermination: Individual Class Expires: [ click and select ]
Click here for instructions to complete the boxes below.
(1) Contracting Activity:
Department of the Air Force
AFLCMC/HBA
6039 Wardleigh Rd, Bldg. 1206 Hill AFB, UT 84056 The Contracting Officer is Ms. Betty Tobias The Contract Specialist is Ms. Bryleigh Gordan This is a Justification and Approval for Other Than Full and Open Competition
(2) Nature and/or description of the action being approved:
The purpose of this exception to Fair Opportunity - Brand specific justification is to provide UPS systems to the remote Alaska location identified as Tin City. The geographic isolation requires UPS systems with open-architecture accessibility for comprehensive lifecycle management. The specialized contracting arrangement necessitates UPS systems that can be serviced by qualified third-party technicians. Only Toshiba and Mitsubishi offer PCCIE-listed and approved UPS systems. As Toshiba and Mitsubishi are COTS items, all vendors have the ability to purchase either of these brands.
(3) Description of the supplies/services required to meet the agency's needs:
The project will consist of UPS replacement with components that provide fair access for independent service/maintenance technicians. Due to the remoteness of Tin City, Alaska, the UPS systems must include unrestricted access to training materials, software and firmware updates necessary to support lifecycle management activities.
v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 5v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 2 of 5
(4) Justification for restricting consideration to a brand-name item:
Due to the remote location of Tin City in northwest coastal Alaska and 15 additional Alaska Radar Sites (ARS), the Air Force utilizes independent contractors for facility management, including UPS system maintenance. The geographic isolation and specialized contracting arrangement necessitate UPS systems that can be serviced by qualified third-party technicians. Toshiba and Mitsubishi are the sole PCCIE-approved manufacturers that permit third-party maintenance without proprietary restrictions.
All other approved UPS systems require:
• OEM-trained and certified technicians exclusively
• Manufacturer-authorized service personnel
• Proprietary licensing for system controls and calibration
• OEM-specific training and certification programs
These restrictions would significantly limit maintenance capabilities and increase operational costs at remote Alaska installations where immediate OEM support is not readily available.
(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:
Despite the limited competition inherent in a brand-specific acquisition, the Contracting Officer has determined that the anticipated cost of procuring the Toshiba or Mitsubishi UPS systems will be fair and reasonable based on taking the following actions:- Analyzing historical procurement data for similar UPS systems.- Price Comparison of Toshiba, Mitsubishi pricing with that of other UPS manufacturers offering with similar UPS size and capacity, including installation, maintenance, and total cost of ownership while maintaining the performance according to site requirements.- An IGE has been developed, and it will serve as a benchmark for evaluating the reasonableness of proposed pricing. Even with an EFO-Brand Specific justification, the Government will actively negotiate with the selected vendor to obtain the best possible price and terms.- Cost control measures will be implemented throughout the acquisition process, including:- Clearly defining the scope of work and deliverables to prevent scope creep and monitoring costs closely to identify and address potential overruns. By following this action plan, the CO is confident that the UPS acquisition will be at a fair and reasonable cost to the Government.
(6) Other facts supporting the justification:
In order to ensure compliance with applicable regulations regarding this exception to full and open competition, the PCCIE team will thoroughly document all steps of the acquisition in the contract file. Additionally, the existing warranties and service agreements will work in the government's favor to ensure a cost effective and low risk acquisition. The PCCIE Program Office is confident in the specialized training and certifications of their vendors that may be involved in the installation, as well as the performance and reliability of the required UPS equipment and its' proprietary monitoring and control systems.
(7) Actions the agency may take to remove or overcome any barriers to decreasing the use of brand-name items before any subsequent acquisition of the supplies or services:
Due the remoteness of the sites that require UPS' it will be difficult to remove or overcome any barriers to decreasing the use of brand-name requirements as the other OEM's
• The OEM's own the firmware/software and will not sell/license nor train third party vendors or provide training materials of any kind.
• Access codes to the UPS software are changed frequently and are deactivated if someone leaves the company in order to protect licensing rights from competitors.
• The OEMs have expressed that the firmware/software licensing and control is paramount to their ability to v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 5v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 3 of 5 remain a going concern, and view it as the sole component that protects their interests in remaining industry leaders in the power conditioning and continuation enterprise.
(8) Program Manager's certification that supporting data is accurate and complete:
As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.
(9) Contracting Officer's certification that the justification is accurate and complete:
As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.
(10) Approving Official's determination that FAR16.505(a)(4)(i) applies to the order:
As evidenced by my signature below, I hereby determine that the use of brand-name restriction applies.
REMOVING ROWS: CAUTION (click here first) NOTE: The text in the signature blocks below is editable, including the title.
Date
29 Jul 2025
Program Manager Jason Keough
AFLCMC/HBAZD 801-586-1869
Signature
X
Date Contracting Officer Betty Tobias
AFLCMC/HBA
Signature
X v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 5v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 4 of 5
Instructions for Completing the Template IAW FAR 16.505(b)(2)(ii)(B)
(2) State whether the action is a new order or a modification to an existing order. Identify the basic multiple award contract number and the order number for the current action. Also identify the type of the order/line items on the order (e.g., Firm Fixed price, Cost Plus Fixed Fee, etc.).
(3) Specifically describe the supplies/services to be acquired including the price/cost and quantity of each item in the order and the total estimated value of the order. For services, state whether services are performance-based, and if not, provide rationale for not being performance based. State the delivery/performance schedule/period for the items under the order. Explain how the requirement/order fits under the scope of the basic multiple award contracts.
(Note: The Contracting Officer must ensure that the order is issued within the period of performance and within the maximum value of the contract).
(4) Include the appropriate exception from FAR 16.505 (b)(2) and the supporting rationale. FAR16.505(b)(1)(i) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding $3,000 unless a statutory exception applies. The specific exception that precludes the fair opportunity process for this acquisition is FAR 16.505(b)(2)(i)(__) [Insert A,B, C, D, or E]. If a brand name product description is being justified, use this section to explain why the particular brand name, product, or feature is essential to the Government's requirements and why other companies' similar products/services do not meet, or cannot be modified to meet, the agency's needs.
FAR 16.505(b)(2)(i)(A): “The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays”. When using this exception provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the mission impact if awarded to any other contractor. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.
FAR 16.505(b)(2)(i)(B): “Only one awardee is capable of providing the supplies or services required at the level at the level of quality required because the supplies or services ordered are unique or highly specialized”. When using this exception provide a detailed justification, with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement. The user/customer typically provides this supporting information.
Supporting documentation may be attached to the back of the document. General statements are not acceptable.
FAR 16.505(b)(2)(i)(C): “The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order”. When using this exception provide information on the previously competed order under this contract and detail the economies and efficiencies that will be obtained by going sole source for the follow-on order. The user/customer typically provides this supporting information.
General statements are not acceptable.
FAR 16.505(b)(2)(i)(D): “It is necessary to place an order to satisfy a minimum guarantee.”
FAR 16.505(b)(2)(i)(E): “For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.”
Discuss the market research that was conducted by the user/technical team/contracting officer among the supplies/services of all awardees that resulted in the conclusion that a fair opportunity exception applied. The narrative in this section should provide a high level of confidence that the requirements of FAR 16.505(b)(1) and DFARS 216.505-70 could not be met. If no market research was conducted, state so and provide the rationale. If any other awardee expressed interest in fulfilling the requirement, but was not considered a potential source, explain why that awardee cannot provide the required supplies/perform the service.
v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 5v 18 Jan 2024 CONTROLLED UNCLASSIFIED INFORMATION Page 5 of 5
If the use of a brand name purchase description is being justified, the market research should include an analysis of any industry proposed alternative products or approaches to meeting the requirements. Additionally, the Government's efforts to identify as many potential sources as practicable offering the required brand name item(s) should be addressed.
(5) This paragraph needs to be tailored based on the types of CLINs in the order and the pricing arrangements on the basic multiple award contract. If the contract did not establish the price for the supply or service, the Contracting Officer must establish prices for each order IAW FAR 15.4. The paragraph needs to describe the steps that will ensure that the prices/estimated cost of the order will be fair and reasonable. For example, even if firm-fixed prices were obtained under adequate price competition in the award of the multiple award contract, the Contracting Officer still needs to consider market conditions and other factors that may have changed since contract award and explain the basis in the determination that prices/costs are fair and reasonable prior to award of the order.
(6) Provide any other facts supporting the use of exceptions to the fair opportunity process.
(7) Include a statement of the actions, if any, to be to be taken to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.
https://usaf.dps.mil/sites/AFCC/KnowledgeCenter/templates_admin/aqc-front.jpg https://usaf.dps.mil/sites/AFCC/KnowledgeCenter/templates_admin/aqc-back.jpg Justification for an Exception to Fair Opportunity or to Use Brand-Name Restriction v 18 Jan 2024 Page of Is this a brand-name justification?
Please provide the product title and description. [ FAR16.505(a)(4)(i) ] Is this a Bridge Action as defined in the AF Bridge Action Reduction Plan?
Type Program (see DAFFARS 5302.101 for definitions):
Type of D etermination:
Fair Opportunity Exception: FAR 16.505(b)(2)(i) (Check the applicable subparagraph below.)
(1) Contracting Activity:
(2) Nature and/or description of the action being approved:
(3) Description of the supplies/services required to meet the agency's needs:
(4) Justification for restricting consideration to a brand-name item:
(4) Identification of the exception to fair opportunity and the supporting rationale:
(5) Contracting Officer's determination that the anticipated cost to the Government will be fair and reasonable:
(6) Other facts supporting the justification:
(7) Actions the agency may take to remove or overcome any barriers to decreasing the use of brand-name items before any subsequent acquisition of the supplies or services:
(7) Actions the agency may take to remove or overcome any barriers to increasing fair opportunity before any subsequent acquisition for the supplies or services:
(8) Program Manager's certification that supporting data is accurate and complete:
As evidenced by my signature below, I certify that any supporting data contained herein, which is my responsibility, is both accurate and complete.
(9) Contracting Officer's certification that the justification is accurate and complete:
As evidenced by my signature below, I certify that the justification is accurate and complete to the best of my knowledge and belief.
(10) Approving Official's determination that FAR16.505(a)(4)(i) applies to the order:
As evidenced by my signature below, I hereby determine that the use of brand-name restriction applies.
(10) Approving Official's determination that one of the circumstances in FAR 16.505(b)(2)(i) applies to the order.
As evidenced by my signature below, I hereby determine that the fair opportunity exception checked on page 1 applies.
NOTE: The text in the signature blocks below is editable, including the title.
Instructions for Completing the Template IAW FAR 16.505(b)(2)(ii)(B)
(2) State whether the action is a new order or a modification to an existing order. Identify the basic multiple award contract number and the order number for the current action. Also identify the type of the order/line items on the order (e.g., Firm Fixed price, Cost Plus Fixed Fee, etc.).
(3) Specifically describe the supplies/services to be acquired including the price/cost and quantity of each item in the order and the total estimated value of the order. For services, state whether services are performance-based, and if not, provide rationale for not being performance based. State the delivery/performance schedule/period for the items under the order. Explain how the requirement/order fits under the scope of the basic multiple award contracts. (Note: The Contracting Officer must ensure that the order is issued within the period of performance and within the maximum value of the contract).
(4) Include the appropriate exception from FAR 16.505 (b)(2) and the supporting rationale. FAR16.505(b)(1)(i) requires the Contracting Officer to provide each awardee under a multiple award contract, a fair opportunity to be considered for each order exceeding $3,000 unless a statutory exception applies. The specific exception that precludes the fair opportunity process for this acquisition is FAR 16.505(b)(2)(i)(__) [Insert A,B, C, D, or E]. If a brand name product description is being justified, use this section to explain why the particular brand name, product, or feature is essential to the Government's requirements and why other companies' similar products/services do not meet, or cannot be modified to meet, the agency's needs.
FAR 16.505(b)(2)(i)(A): “The agency need for the supplies or services is so urgent that providing a fair opportunity would result in unacceptable delays”. When using this exception provide a detailed justification with supporting documentation that explains the exact urgency of the requirement and the mission impact if awarded to any other contractor. The user/customer typically provides this supporting information. Recommend attaching supporting documentation to the back of the document. General statements of urgency are not acceptable.
FAR 16.505(b)(2)(i)(B): “Only one awardee is capable of providing the supplies or services required at the level at the level of quality required because the supplies or services ordered are unique or highly specialized”. When using this exception provide a detailed justification, with supporting documentation, as evidence of the “unique or highly specialized” nature of the procurement. The user/customer typically provides this supporting information. Supporting documentation may be attached to the back of the document. General statements are not acceptable.
FAR 16.505(b)(2)(i)(C): “The order must be issued on a sole-source basis in the interest of economy and efficiency as a logical follow-on to an order already issued under the contract, provided that all awardees were given a fair opportunity to be considered for the original order”. When using this exception provide information on the previously competed order under this contract and detail the economies and efficiencies that will be obtained by going sole source for the follow-on order. The user/customer typically provides this supporting information. General statements are not acceptable.
FAR 16.505(b)(2)(i)(D): “It is necessary to place an order to satisfy a minimum guarantee.”
FAR 16.505(b)(2)(i)(E): “For orders exceeding the simplified acquisition threshold, a statute expressly authorizes or requires that the purchase be made from a specified source.”
Discuss the market research that was conducted by the user/technical team/contracting officer among the supplies/services of all awardees that resulted in the conclusion that a fair opportunity exception applied. The narrative in this section should provide a high level of confidence that the requirements of FAR 16.505(b)(1) and DFARS 216.505-70 could not be met. If no market research was conducted, state so and provide the rationale. If any other awardee expressed interest in fulfilling the requirement, but was not considered a potential source, explain why that awardee cannot provide the required supplies/perform the service.
If the use of a brand name purchase description is being justified, the market research should include an analysis of any industry proposed alternative products or approaches to meeting the requirements. Additionally, the Government's efforts to identify as many potential sources as practicable offering the required brand name item(s) should be addressed.
(5) This paragraph needs to be tailored based on the types of CLINs in the order and the pricing arrangements on the basic multiple award contract. If the contract did not establish the price for the supply or service, the Contracting Officer must establish prices for each order IAW FAR 15.4. The paragraph needs to describe the steps that will ensure that the prices/estimated cost of the order will be fair and reasonable. For example, even if firm-fixed prices were obtained under adequate price competition in the award of the multiple award contract, the Contracting Officer still needs to consider market conditions and other factors that may have changed since contract award and explain the basis in the determination that prices/costs are fair and reasonable prior to award of the order.
(6) Provide any other facts supporting the use of exceptions to the fair opportunity process.
(7) Include a statement of the actions, if any, to be to be taken to remove or overcome any barriers that led to the exception to fair opportunity before any subsequent acquisition for the supplies or services is made. If no actions are planned, so state and provide reasons.
9.0.0.2.20120627.2.874785
| security_markings: CONTROLLED UNCLASSIFIED INFORMATION |
| CurrentPage: |
| PageCount: |
| Yes: |
| No: |
| Brand-Name-Title_hidden: Toshiba or Mitsubishi UPS Systems |
| Brand-Name-Description_hidden: UPSs with open-market training, software and firmware availability |
| Contacting-Activity: AFLCMC/HBA |
| Purchase-Request: Purchase Request Number to be determined after receipt of proposal |
| Program-Name: Power Conditioning Continuation and Interfacing Equipment (PCCIE) |
| Cost-Price: $199,200.00 |
| PEO-Program: 1 |
| Operational: 0 |
| Enterprise: 0 |
| Individual: |
| Class: |
| Expiration_Date: [ click and select ] |
| subparagraph-A: 0 |
| subparagraph-B: 0 |
| subparagraph-C: 0 |
| subparagraph-D: 0 |
| subparagraph-E: 0 |
| subparagraph-F: 0 |
| subparagraph-G: 0 |
| Drop-Down_for_Exceptions: Select the applicable FAR 6.302 exception from the drop-down list below. |
| Instructions_Button: |
| A: |
| CAUTION: |
| Date: 29 Jul 2025 |
| Name: |
| Signature: |
| Hide-PM-Coord: |
| Hide-CO-Coord: |
| Hide-Legal-Coord: |
| Hide-COCO-Coord: |
| Hide-CA-Coord: |
| Hide-SCO-Coord: |
| Hide-Approval-Coord: |
| Hide-Blank-1-Coord: |
| Hide-Blank-2-Coord: |
| anchor: |
File details come from the government source that posted it. Updated .