RFQ IFB RFP

ECONOMICALLY DISADVANTAGED

WOMEN-OWNED SMALL BUSINESS

(EDWOSB)

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER PAGE OF

2. CONTRACT NO. 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODEFACILITY

CODE

CODE

TELEPHONE NO.

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

SEE ADDENDUM

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Govt. Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF.

DATED . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 3/2011)

Prescribed by GSA - FAR (48 CFR) 53.212

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

OFFER

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

17a CONTRACTOR/

OFFEROR.

CODE

8 (A)

SIZE STANDARD:

NAICS:

% FOR:SET ASIDE:UNRESTRICTED OR

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

10. THIS ACQUISITION IS

STANDARD FORM 1449 (REV. 3/2011) BACK

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32a. QUANTITY IN COLUMN 21 HAS BEEN

RECEIVED INSPECTED ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE

41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42a. RECEIVED BY (Print)

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

40. PAID BY

32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELPHONE NUMBER OF AUTHORZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

PARTIAL FINAL

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER

36. PAYMENT

COMPLETE PARTIAL FINAL

SCHEDULE Continued

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

PAGE 3 OF 31 ED-NAG-17-R-0002

Communications, Outreach and Dissemination Services for the National Assessment Governing Board

NTE NTE

0001 Labor Costs - Base Year

PR NUMBER: EDNAGB-17-900004

DELIVERY DATE: 09/24/2018

SHIP TO:

National Assessment Governing Board 800 North Capitol Street NW, Suite 825 Washington DC 20002-4233

Period of Performance: 09/25/2017 to 09/24/2018

1.00 SE

0002 Other Direct Costs (Time and Materials)

DELIVERY DATE: 09/24/2018

SHIP TO:

National Assessment Governing Board 800 North Capitol Street NW, Suite 825 Washington DC 20002-4233

Period of Performance: 09/25/2017 to 09/24/2018

1.00 SE

OPT

0003 Option Year One

Labor and Other Direct Costs

DELIVERY DATE: 09/24/2019

SHIP TO:

National Assessment Governing Board 800 North Capitol Street NW, Suite 825 Washington DC 20002-4233

Period of Performance: 09/25/2018 to 09/24/2019

1.00 SE

OPT

0004 Option Year Two

Labor and Other Direct Costs

DELIVERY DATE: 09/24/2020

SHIP TO:

National Assessment Governing Board 800 North Capitol Street NW, Suite 825 Washington DC 20002-4233

Period of Performance: 09/25/2019 to 09/24/2020

1.00 SE

Table of Contents

PAGE 4 OF 31 ED-NAG-17-R-0002

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS

B. 1 52.216-1 TYPE OF CONTRACT (APR 1984)

SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 302-2 SCOPE OF WORK (FEBRUARY 1985)

SECTION D PACKAGING AND MARKING

D. 1 303-1 SHIPMENT AND MARKING (MARCH 1986)

SECTION E INSPECTION AND ACCEPTANCE

E. 1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

E. 2 52.246-6 INSPECTION--TIME-AND-MATERIAL AND LABOR-HOUR (MAR 2001)

E. 3 304-1 INSPECTION AND ACCEPTANCE (FEBRUARY 1985)

SECTION F DELIVERIES OR PERFORMANCE

F. 1 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

F. 2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

F. 3 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

F. 4 305-6 DELIVERABLES (MARCH 1986)

SECTION G CONTRACT ADMINISTRATION DATA

G. 1 305-10 PERIOD OF PERFORMANCE (APRIL 1984)

G. 2 306-1b Invoice and Contract Financing Requests Submission - IPP (December 2013)

G. 3 306-5 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (FEB 2006)

G. 4 306-8 CONTRACT ADMINISTRATOR (FEB 1985)

G. 5 307-2 KEY PERSONNEL DESIGNATION (MARCH 1985)

G. 6 307-24 CONSULTANT SERVICES AND CONSENT (APRIL 1986)

SECTION H SPECIAL CONTRACT REQUIREMENTS

H. 1 3452.237-71 OBSERVANCE OF ADMINISTRATIVE CLOSURES (MAY 2011)

H. 2 31.205.70 FOOD COSTS

H. 3 31.205.71 TRAVEL COSTS

H. 4 307-3 DUAL COMPENSATION (MARCH 1985)

H. 5 307-12 CONSENT TO SUBCONTRACT (AUGUST 1998)

H. 6 307-17 CONFLICT OF INTEREST (AUG 2007)

H. 7 307-19a REDACTED PROPOSALS (APRIL 2004)

H. 8 311-6 CLARIFICATION QUESTIONS (APRIL 1998)

H. 9 313.237-72 CLEARANCE OF CONFERENCES/MEETINGS (FEBRUARY 2015):

SECTION I CONTRACT CLAUSES

I. 1 52.227-17 RIGHTS IN DATA--SPECIAL WORKS (DEC 2007)

I. 2 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

I. 3 52.242-15 STOP-WORK ORDER (AUG 1989)

I. 4 52.243-1 I CHANGES--FIXED-PRICE (AUG 1987)--ALTERNATE I (APR 1984)

I. 5 52.243-3 CHANGES--TIME-AND-MATERIALS OR LABOR-HOURS (SEP 2000)

I. 6 52.246-25 LIMITATION OF LIABILITY--SERVICES (FEB 1997)

I. 7 52.249-4 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (SERVICES) (SHORT FORM) (APR 1984). 19

I. 8 3452.224-70 RELEASE OF INFORMATION UNDER THE FREEDOM OF INFORMATION ACT (MAY 2011)

I. 9 52.202-1 DEFINITIONS (NOV 2013)

I. 10 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS (JAN 2017)

Table of Contents

PAGE 5 OF 31 ED-NAG-17-R-0002

I. 11 52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR EXECUTIVE ORDERS--

COMMERCIAL ITEMS (JAN 2017)

I. 12 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

I. 13 3452.227-71 ADVERTISING OF AWARDS (MAY 2011)

I. 14 3452.227-73 LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED

WITH RESTRICTIVE LEGENDS (MAY 2011)

I. 15 3452.242-71 NOTICE TO THE GOVERNMENT OF DELAYS (MAY 2011)

I. 16 3452.242-73 ACCESSIBILITY OF MEETINGS, CONFERENCES, AND SEMINARS TO PERSONS WITH

DISABILITIES (MAY 2011)

SECTION J LIST OF ATTACHMENTS

J. 1 LIST OF ATTACHMENTS

SECTION M EVALUATION FACTORS FOR AWARD

M. 1 312-2a EVALUATION FACTORS FOR AWARD (ALTERNATE II)(MAY 2004)

M. 2 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

PAGE 6 OF 31 ED-NAG-17-R-0002

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B. 1 52.216-1 TYPE OF CONTRACT (APR 1984)

The Government contemplates award of a hybrid type of contract with labor costs to be awarded on a Firm Fixed Price basis and Other Direct Costs awarded on a Time and Materials basis contract resulting from this solicitation.

(End of Provision)

PAGE 7 OF 31 ED-NAG-17-R-0002

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 302-2 SCOPE OF WORK (FEBRUARY 1985)

The contractor shall furnish all personnel, materials, services, and facilities necessary to perform the requirements set forth in the Statement of Work, Attachment A . This shall also be done in accordance with the specified General and Special Provisions and the contractor's final technical proposal, which are hereby incorporated by reference as a part of the contract.

(To be added at contract award).

PAGE 8 OF 31 ED-NAG-17-R-0002

SECTION D

PACKAGING AND MARKING

D. 1 303-1 SHIPMENT AND MARKING (MARCH 1986)

(a) The contract number shall be placed on or adjacent to all exterior mailing or shipping labels of deliverable items called for by the contract.

(b) Ship deliverable items to:

National Assessment Governing Board 800 North Capitol Street N.W., Suite 825 Washington DC 20002

(202) 357-6938

(c) Mark deliverables for: Munira Mwalimu, Contracting Officer

PAGE 9 OF 31 ED-NAG-17-R-0002

SECTION E

INSPECTION AND ACCEPTANCE

E. 1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

(a) "Definitions." "Services," as used in this clause, includes services performed, workmanship, and material furnished or utilized in the performance of services.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all services called for by the contract, to the extent practicable at all times and places during the term of the contract. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspections or tests on the premises of the Contractor or a subcontractor, the Contractor shall furnish, and shall require subcontractors to furnish, at no increase in contract price, all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) If any of the services do not conform with contract requirements, the Government may require the Contractor to perform the services again in conformity with contract requirements, at no increase in contract amount. When the defects in services cannot be corrected by reperformance, the Government may--

(1) Require the Contractor to take necessary action to ensure that future performance conforms to contract requirements; and

(2) Reduce the contract price to reflect the reduced value of the services performed.

(f) If the Contractor fails to promptly perform the services again or to take the necessary action to ensure future performance in conformity with contract requirements, the Government may--

(1) By contract or otherwise, perform the services and charge to the Contractor any cost incurred by the Government that is directly related to the performance of such service; or

(2) Terminate the contract for default.

(End of Clause)

E. 2 52.246-6 INSPECTION--TIME-AND-MATERIAL AND LABOR-HOUR (MAR 2001)

(a) "Definitions." As used in this clause-- "Contractor`s managerial personnel" means any of the Contractor`s directors, officers, managers, superintendents, or equivalent representatives who have supervision or direction of--

(1) All or substantially all of the Contractor`s business;

(2) All or substantially all of the Contractor`s operation at any one plant or separate location where the contract is being performed; or

(3) A separate and complete major industrial operation connected with the performance of this contract.

"Materials" includes data when the contract does not include the Warranty of Data clause.

(b) The Contractor shall provide and maintain an inspection system acceptable to the Government covering the material, fabricating methods, work, and services under this contract. Complete records of all inspection work performed by the Contractor shall be maintained and made available to the Government during contract performance and for as long afterwards as the contract requires.

(c) The Government has the right to inspect and test all materials furnished and services performed under this contract, to the extent practicable at all places and times, including the period of performance, and in any event before acceptance. The Government may also inspect the plant or plants of the Contractor or any subcontractor engaged in contract performance. The Government shall perform inspections and tests in a manner that will not unduly delay the work.

(d) If the Government performs inspection or test on the premises of the Contractor or a subcontractor, the Contractor shall furnish and shall require subcontractors to furnish all reasonable facilities and assistance for the safe and convenient performance of these duties.

(e) Unless otherwise specified in the contract, the Government shall accept or reject services and materials at the place of delivery as promptly as practicable after delivery, and they shall be presumed accepted 60 days after the date of delivery, unless accepted earlier.

(f) At any time during contract performance, but not later than 6 months (or such other time as may be specified in the contract) after acceptance of the services or materials last delivered under this contract, the Government may require the Contractor to replace or correct services or materials that at time of delivery failed to meet contract requirements. Except as otherwise specified in

PAGE 10 OF 31 ED-NAG-17-R-0002

paragraph (h) of this clause, the cost of replacement or correction shall be determined under the Payments Under Time-and-Materials and Labor-Hour Contracts clause, but the "hourly rate" for labor hours incurred in the replacement or correction shall be reduced to exclude that portion of the rate attributable to profit. The Contractor shall not tender for acceptance materials and services required to be replaced or corrected without disclosing the former requirement for replacement or correction, and, when required, shall disclose the corrective action taken.

(g)

(1) If the Contractor fails to proceed with reasonable promptness to perform required replacement or correction, and if the replacement or correction can be performed within the ceiling price (or the ceiling price as increased by the Government), the Government may--

(i) By contract or otherwise, perform the replacement or correction, charge to the Contractor any increased cost, or deduct such increased cost from any amounts paid or due under this contract;

or

(ii) Terminate this contract for default.

(2) Failure to agree to the amount of increased cost to be charged to the Contractor shall be a dispute.

(h) Notwithstanding paragraphs (f) and (g) of this clause, the Government may at any time require the Contractor to remedy by correction or replacement, without cost to the Government, any failure by the Contractor to comply with the requirements of this contract, if the failure is due to--

(1) Fraud, lack of good faith, or willful misconduct on the part of the Contractor`s managerial personnel; or

(2) The conduct of one or more of the Contractor`s employees selected or retained by the Contractor after any of the Contractor`s managerial personnel has reasonable grounds to believe that the employee is habitually careless or unqualified.

(i) This clause applies in the same manner and to the same extent to corrected or replacement materials or services as to materials and services originally delivered under this contract.

(j) The Contractor has no obligation or liability under this contract to correct or replace materials and services that at time of delivery do not meet contract requirements, except as provided in this clause or as may be otherwise specified in the contract.

(k) Unless otherwise specified in the contract, the Contractor`s obligation to correct or replace Government-furnished property shall be governed by the clause pertaining to Government property.

E. 3 304-1 INSPECTION AND ACCEPTANCE (FEBRUARY 1985)

Pursuant to the inspection clause, Section I, final inspection and acceptance of all contracted items shall be made by the Contracting

Officer.

PAGE 11 OF 31 ED-NAG-17-R-0002

SECTION F

DELIVERIES OR PERFORMANCE

F. 1 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor within the contract period of performance, no later than 30 days prior to the expiration of the contract.

F. 2 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

(a) The Government may extend the term of this contract by written notice to the Contractor within 30 days provided that the Government gives the Contractor a preliminary written notice of its intent to extend at least 60 days before the contract expires. The preliminary notice does not commit the Government to an extension.

(b) If the Government exercises this option, the extended contract shall be considered to include this option clause.

(c) The total duration of this contract, including the exercise of any options under this clause, shall not exceed 36 months.

Base Year: 09/25/2017 - 09/24/2018 Option Year 1: 09/25/2018 - 09/24/2019 Option Year 2: 09/25/2019 - 09/24/2020

F. 3 52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(a) If the performance of all or any part of the work of this contract is delayed or interrupted

(1) by an act of the Contracting Officer in the administration of this contract that is not expressly or implied authorized by this contract, or

(2) by a failure of the Contracting Officer to act within the time specified in this contract, or within a reasonable time if not specified, an adjustment (excluding profit) shall be made for any increase in the cost of performance of this contract caused by the delay or interruption and the contract shall be modified in writing accordingly. Adjustment shall also be made in the delivery or performance dates and any other contractual term or condition affected by the delay or interruption.

However, no adjustment shall be made under this clause for any delay or interruption to the extent that performance would have been delayed or interrupted by any other cause, including the fault or negligence of the Contractor, or for which an adjustment is provided or excluded under any other term or condition of this contract.

(b) A claim under this clause shall not be allowed--

(1) For any costs incurred more than 20 days before the Contractor shall have notified the Contracting Officer in writing of the act or failure to act involved; and

(2) Unless the claim, in an amount stated, is asserted in writing as soon as practicable after the termination of the delay or interruption, but not later than the day of final payment under the contract.

F. 4 305-6 DELIVERABLES (MARCH 1986)

All deliverables shall be submitted in accordance with the kinds, quantities and dates indicated in the attached Statement of

PAGE 12 OF 31 ED-NAG-17-R-0002

Work.

PAGE 13 OF 31 ED-NAG-17-R-0002

SECTION G

CONTRACT ADMINISTRATION DATA

G. 1 305-10 PERIOD OF PERFORMANCE (APRIL 1984)

(a) Performance hereunder shall be completed within 36 months of the date of contract award.

Task Orders may be issued at any time during this period of performance, including option periods if the options are exercised, in accordance with the clauses entitled TASK ORDER PROCEDURE. If task orders are issued prior to the expiration date of the contract which require performance or delivery after the final expiration date of the contract, the contract will be modified to extend the period of performance to the actual scheduled delivery date.

(b) The Government shall have the right to unilaterally extend the period of performance of this contract for the purpose stated in paragraph (a) of this article.

(c) Extensions of the period of performance of the contract for the purpose stated in this article shall NOT be considered an exercise of the option to extend the term of the contract.

G. 2 306-1b Invoice and Contract Financing Requests Submission - IPP (December 2013)

(a) Payments shall be rendered in accordance with the identified payment schedule(s), and any other incorporated payment clause(s), specified rates, and/or fixed price amounts.

(b) The contractor shall submit invoices electronically by means of the web-based system, Invoice Processing Platform (IPP) that can be accessed at: http://www.ipp.gov/. All submitted invoices must be accompanied by supporting documentation in accordance with the contract's terms and conditions. The supporting documentation shall be submitted in the following formats: Adobe Acrobat (pdf), Microsoft Word (doc), Pictures (jpeg), Microsoft Excel (excel), and Microsoft Outlook message (msg).

(c) Invoice Number Format - The format for the invoice shall be the contract number followed by the invoice number. The invoice number shall have no spaces, dashes, or other special characters. The invoice number cannot exceed 21 characters. Examples of acceptable invoice number formats are as follows:

Example 1, Definitive Contract:

Contract Number: ED-ABC-13-C-1234 Contractor's Invoice No.: 15897126341 IPP Invoice No.: EDABC13C1234158971263 (Note that the "-" characters were removed due to the requirement of not having special characters and the last two digits ["41"] from the contractor's invoice number were removed due to the 21 character limitation)

Example 2, Task/Delivery Order Contract:

Contract Number: ED-CDE-13-A-4567/0001

PAGE 14 OF 31 ED-NAG-17-R-0002

Contractor's Invoice No.: 158971263 IPP Invoice No.: EDCDE13A4567000115897 (Note that the "/" and "-" characters were removed due to the requirement of not having special characters and the last four digits ["1263"] from the contractor's invoice number were removed due to the 21 character limitation)

(d) If the Contractor has not already established an IPP account that is active, an IPP account will be automatically created on behalf of the Contractor. The automatically created IPP account will be issued to the Designated Primary Administrator, which will be the individual that has been identified in the "Accounts Receivable POC" Section of the Contractor's System for Award Management (SAM) registration located at https://www.sam.gov/portal/public/SAM/.

(e) Within ten (10) business days of the Contractor entering or updating the Accounts Receivable POC information within the Contractor's SAM registration, the Designated Primary Administrator will receive an email from the IPP Customer Support Team containing the Designated Primary Administrator's IPP username. Within 24 hours of receiving the initial email, the Designated Primary Administrator will receive a second email containing their IPP password. Once both emails have been received, the Designated Primary Administrator must log into IPP and complete the registration process.

(f) The Contractor's Designated Primary Administrator will be authorized to further designate other administrators under the Contractor's IPP account who may submit invoices on behalf of the Contractor.

(g) The Contractor must ensure that the "Accounts Receivable POC" Section of its SAM registration is accurate and up to date.

(h) In the event that an invoice is rejected, the contractor shall make the necessary corrections and resubmit the invoice by means of IPP. Any questions, concerns, or issues regarding the use of IPP should be directed to IPP Customer Support Team, as identified at http://www.ipp.gov/

G. 3 306-5 CONTRACTING OFFICER'S REPRESENTATIVE (COR) (FEB 2006)

(a) The Contracting Officer's Representative (COR) is responsible for the technical aspects of the project, technical liaison with the Contractor, and any other responsibilities that are specified in the contract. These responsibilities include inspecting all deliverables, including reports, and recommending acceptance or rejection to the Contracting Officer.

(b) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes which affect the contract price, terms or conditions. Any contractor requests for changes shall be submitted in writing directly to the Contracting Officer or through the COR. No such changes shall be made without the written authorization of the Contracting Officer.

(c) The COR's name and address:

(Inserted at contract award) National Assessment Governing Board 800 North Capitol Street N.W., Suite 825 Washington DC 20002 Contact information inserted at award.

The COR may be changed by the Government at any time, but notification of the change, including the name and address of the successor COR, will be provided to the Contractor by the Contracting Officer in writing.

G. 4 306-8 CONTRACT ADMINISTRATOR (FEB 1985)

The Contractor shall designate one individual to be contacted during the period of the contract for prompt contract administration.

To be determined (TBD) at contract award and added to contract at award.

(Address field 1) (Address field 2) (Address field 3) (Address field 4).

PAGE 15 OF 31 ED-NAG-17-R-0002

G. 5 307-2 KEY PERSONNEL DESIGNATION (MARCH 1985)

In accordance with the contract clause entitled "Key Personnel", the following key personnel are considered to be essential to the work being performed:

Project Director - TBD Upon Award

G. 6 307-24 CONSULTANT SERVICES AND CONSENT (APRIL 1986)

The Contractor shall obtain the consent of the Contracting Officer prior to using any consultant on this contract. The Contractor shall determine whether any consultant that is used has in effect an agreement with another Federal agency for similar or like services and, if so, shall notify the Contracting Officer.

(Final contract provisions will list approved consultants and costs).

PAGE 16 OF 31 ED-NAG-17-R-0002

SECTION H

SPECIAL CONTRACT REQUIREMENTS

H. 1 3452.237-71 OBSERVANCE OF ADMINISTRATIVE CLOSURES (MAY 2011)

(a) The contract schedule identifies all Federal holidays that are observed under this contract.

Contractor performance is required under this contract at all other times, and compensated absences are not extended due to administrative closures of Government facilities and operations due to inclement weather, Presidential decree, or other administrative issuances where Government personnel receive early dismissal instructions.

(b) In cases of contract performance at a Government facility when the facility is closed, the vendor may arrange for performance to continue during the closure at the contractor`s site, if appropriate.

H. 2 31.205.70 FOOD COSTS

No food may be provided under this contract or in association with this contract unless consent is provided below. The cost of food under this contract is unallowable unless the contractor receives written consent from the Contracting Officer prior to the incurrence of the cost. If the contractor wishes to be reimbursed for a food cost, it must make a request in writing at least 21 days prior to the day that costs would be incurred. The contractor shall include in its request the following:

the purpose of the event at which the food will be served, why the food is integral to fulfill a government requirement in the contract, and the proposed costs. The lack of a timely response from the Contracting Officer shall not constitute constructive acceptance of the allowability of the proposed charge. Consent is hereby given to the contractor to To be added at contract award, as proposed by the offeror .

H. 3 31.205.71 TRAVEL COSTS

No invitational travel (defined as: Official government travel conducted by a non-federal employee in order to provide a "direct service" [i.e. presenting on a topic, serving as a facilitator, serving on a Federal Advisory Committee Act, or advising in an area of expertise] to the government) may be provided under this contract or in association with this contract unless consent is provided below. The cost of invitational travel under this contract is unallowable unless the contractor receives written consent from the Contracting Officer prior to the incurrence of the cost. If the contractor wishes to be reimbursed for a cost related to invitational travel, it must make a request in writing at least 21 days prior to the day that costs would be incurred. The contractor shall include in its request the following: why the invitational travel cost is integral to fulfill a government requirement in the contract, and the proposed cost that must be in accordance with federal travel regulations . The lack of a timely response from the Contracting Officer shall not constitute constructive acceptance of the allowability of the proposed charge. Consent is hereby given to the contractor to TBD Upon Award .

H. 4 307-3 DUAL COMPENSATION (MARCH 1985)

If a project staff member, subcontractor, or consultant is involved in two or more projects, at least one of which is supported by Federal funds, he/she may not be compensated for more than 100 percent of his/her time during any part of the period of dual involvement. That is, an individual is prohibited from receiving double payment for any given period of work.

H. 5 307-12 CONSENT TO SUBCONTRACT (AUGUST 1998)

Consent is hereby given to the contractor to subcontract with organizations or entities to be determined at contract award in the amount stated in its final proposal revision.

H. 6 307-17 CONFLICT OF INTEREST (AUG 2007)

PAGE 17 OF 31 ED-NAG-17-R-0002

(A) The contractor, subcontractor, employee or consultant, has certified that, to the best of their knowledge and belief, there are no relevant facts or circumstances which could give rise to an organizational or personal conflict of interest, (see FAR Subpart 9.5 for organizational conflicts of interest), (or apparent conflict of interest) for the organization or any of its staff, and that the contractor, subcontractor, employee or consultant has disclosed all such relevant information if such a conflict of interest appears to exist to a reasonable person with knowledge of the relevant facts (or if such a person would question the impartiality of the contractor, subcontractor, employee or consultant). Conflicts may arise in the following situations:

1. Unequal access to information - a potential contractor, subcontractor, employee or consultant has access to non-public information through its performance on a government contract.

2. Biased ground rules - a potential contractor, subcontractor, employee or consultant has worked, in one government contract, or program, on the basic structure or ground rules of another government contract,

3. Impaired objectivity - a potential contractor, subcontractor, employee or consultant, or member of their immediate family (spouse, parent or child) has financial or other interests that would impair, or give the appearance of impairing, impartial judgment in the evaluation of government programs, in offering advice or recommendations to the government, or in providing technical assistance or other services to recipients of Federal funds as part of its contractual responsibility.

"Impaired objectivity" includes but is not limited to the following situations that would cause a reasonable person with knowledge of the relevant facts to question a person's objectivity:

- financial interests or reasonably foreseeable financial interests in or in connection with products, property, or services that may be purchased by an educational agency, a person, organization, or institution in the course of implementing any program administered by the Department;

- significant connections to teaching methodologies that might require or encourage the use of specific products, property or services; or

- significant identification with pedagogical or philosophical viewpoints that might require or encourage the use of a specific curriculum, specific products, property or services.

Offerors must provide the disclosure described above on any actual or potential conflict (or apparent conflict of interest) of interest regardless of their opinion that such a conflict or potential conflict (or apparent conflict of interest) would not impair their objectivity.

In a case in which an actual or potential conflict (or apparent conflict of interest) is disclosed, the Department will take appropriate actions to eliminate or address the actual or potential conflict (or apparent conflict of interest), including but not limited to mitigating or neutralizing the conflict, when appropriate, through such means as ensuring a balance of views, disclosure with the appropriate disclaimers, or by restricting or modifying the work to be performed to avoid or reduce the conflict.

In this clause, the term "potential conflict" means reasonably foreseeable conflict of interest.

(B) The contractor, subcontractor, employee or consultant agrees that if "impaired objectivity", or an actual or potential conflict of interest (or apparent conflict of interest) is discovered after the award is made, it will make a full disclosure in writing to the Contracting Officer. This disclosure shall include a description of actions that the Contractor has taken or proposes to take, after consultation with the Contracting Officer, to avoid, mitigate, or neutralize the actual or potential conflict (or apparent conflict of interest).

(C) Remedies - The Government may terminate this contract for convenience, in whole or in part, if it deems such termination necessary to avoid the appearance of a conflict of interest. If the Contractor was aware of a potential conflict of interest prior to award or discovered an actual or potential conflict (or apparent conflict of interest) after award and did not disclose or misrepresented relevant information to the Contracting Officer, the Government may terminate the contract for default, or pursue such other remedies as may be permitted by law or this contract. These remedies include imprisonment for up to five years for violation of Title 18, U.S. Code, Section 1001 and fines of up to $5000 for violation of Title 31, U.S. Code, Section 3802. Further remedies include suspension or debarment from contracting with the federal government. The Contractor may also be required to reimburse the Department for costs the Department incurs arising from activities related to conflicts of interest. An example of such costs would be those incurred in processing Freedom of Information Act requests related to a conflict of interest.

(D) In cases where remedies short of termination have been applied, the contractor, subcontractor, employee or consultant agrees to eliminate the organizational conflict of interest, or mitigate it to the satisfaction of the Contracting Officer.

(E) The Contractor further agrees to insert in any subcontract or consultant agreement hereunder, provisions which shall conform substantially to the language of this clause, including specific mention of potential remedies and this paragraph (E).

H. 7 307-19a REDACTED PROPOSALS (APRIL 2004)

PAGE 18 OF 31 ED-NAG-17-R-0002

The contractor shall provide a redacted copy of its successful technical proposal for the original contract and any awarded task orders to the Contracting Officer within five (5) days after contract or task order award. The redacted proposal shall be suitable for release by the Government under a Freedom of Information Act (FOIA) request. The redacted proposal shall be submitted in an electronic format that is readable by Microsoft Office applications.

H. 8 311-6 CLARIFICATION QUESTIONS (APRIL 1998)

Offerors must submit all clarification questions concerning this solicitation in writing to the contract specialist. Questions may be submitted via E-Mail, fax or regular mail to:

Munira.Mwalimu@ed.gov and Anthony.R.White@ed.gov ED will accept clarification questions until 10:00 am EST July 10, 2017 . After this date ED does not guarantee that a response will be given.

Oral explanations or instructions given by the Government before the award of the contract(s) shall not be binding. Any information given to a prospective offeror concerning a solicitation will be furnished promptly to all other prospective offerors as an amendment to the solicitation, if that information is necessary in submitting offers or if a lack of it would be prejudicial to any other prospective offerors.

H. 9 313.237-72 CLEARANCE OF CONFERENCES/MEETINGS (FEBRUARY 2015):

Any hotel/venue contract that the Contractor negotiates must be reviewed by and receive concurrence from a Conference Policy and Operations Team member prior to final agreement. All hotel/venue contracts shall be submitted electronically via email to the cognizant Contracting Officer's Representative, with a carbon copy to the Contracting Officer, who will ensure Conference Policy and Operations reviews the contract.

Complimentary Items "Comps": The Contractor does not have authority to negotiate or accept room upgrades for Department or Contractor staff. However, the Contractor is authorized to exercise its best efforts to obtain other Comps of necessary items/services that the Department would otherwise seek to procure in furtherance of the conference/meeting (i.e., meeting rooms, sleeping rooms, audio-visual equipment, etc.) Dual Compensation: Contractors are prohibited from receiving compensation from both the Department and any other source for conference planning performed pursuant to the terms of this Contract. If the Contractor receives any compensation from another source as a result of conference services performed for the Department, the Contractor shall report this compensation to the Contracting Officer and offset its invoice to the Department in an equal amount.

PAGE 19 OF 31 ED-NAG-17-R-0002

SECTION I

CONTRACT CLAUSES

I. 1 52.227-17 RIGHTS IN DATA--SPECIAL WORKS (DEC 2007)

(Reference 52.227-17)

I. 2 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

(Reference 52.232-40)

I. 3 52.242-15 STOP-WORK ORDER (AUG 1989)

(Reference 52.242-15)

I. 4 52.243-1 I CHANGES--FIXED-PRICE (AUG 1987)--ALTERNATE I (APR 1984)

(Reference 52.243-1 I)

I. 5 52.243-3 CHANGES--TIME-AND-MATERIALS OR LABOR-HOURS (SEP 2000)

(Reference 52.243-3)

I. 6 52.246-25 LIMITATION OF LIABILITY--SERVICES (FEB 1997)

(Reference 52.246-25)

I. 7 52.249-4 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (SERVICES) (SHORT FORM) (APR 1984)

(Reference 52.249-4)

I. 8 3452.224-70 RELEASE OF INFORMATION UNDER THE FREEDOM OF INFORMATION ACT (MAY 2011)

(Reference 3452.224-70)

I. 9 52.202-1 DEFINITIONS (NOV 2013)

When a solicitation provision or contract clause uses a word or term that is defined in the Federal Acquisition Regulation (FAR), the word or term has the same meaning as the definition in FAR

2.101 in effect at the time the solicitation was issued, unless--

(a) The solicitation, or amended solicitation, provides a different definition;

(b) The contracting parties agree to a different definition;

(c) The part, subpart, or section of the FAR where the provision or clause is prescribed provides a different meaning; or

(d) The word or term is defined in FAR Part 31, for use in the cost principles and procedures.

I. 10 52.212-4 CONTRACT TERMS AND CONDITIONS--COMMERCIAL ITEMS (JAN 2017)

(a) Inspection/Acceptance. The Contractor shall only tender for acceptance those items that conform to the requirements of this contract. The Government reserves the right to inspect or test any supplies or services that have been tendered for acceptance. The Government may require repair or

PAGE 20 OF 31 ED-NAG-17-R-0002

replacement of nonconforming supplies or reperformance of nonconforming services at no increase in contract price. If repair/replacement or reperformance will not correct the defects or is not possible, the Government may seek an equitable price reduction or adequate consideration for acceptance of nonconforming supplies or services. The Government must exercise its post-acceptance rights--

(1) Within a reasonable time after the defect was discovered or should have been discovered; and

(2) Before any substantial change occurs in the condition of the item, unless the change is due to the defect in the item.

(b) Assignment. The Contractor or its assignee may assign itsrights to receive payment due as a result of performance of this contract to a bank, trust company, or other financing institution, including any Federal lending agency in accordance with the Assignment of Claims Act (31 U.S.C. 3727).

However, when a third party makes payment (e.g., use of the Governmentwide commercial purchase card), the Contractor may not assign its rights to receive payment under this contract.

(c) Changes. Changes in the terms and conditions of this contract may be made only by written agreement of the parties.

(d) Disputes. This contract is subject to 41 U.S.C. chapter 71, Contract Disputes. Failure of the parties to this contract to reach agreement on any request for equitable adjustment, claim, appeal or action arising under or relating to this contract shall be a dispute to be resolved in accordance with the clause at FAR 52.233-1, Disputes, which is incorporated herein by reference. The Contractor shall proceed diligently with performance of this contract, pending final resolution of any dispute arising under the contract.

(e) Definitions. The clause at FAR 52.202-1, Definitions, is incorporated herein by reference.

(f) Excusable delays. The Contractor shall be liable for default unless nonperformance is caused by an occurrence beyond the reasonable control of the Contractor and without its fault or negligence such as, acts of God or the public enemy, acts of the Government in either its sovereign or contractual capacity, fires, floods, epidemics, quarantine restrictions, strikes, unusually severe weather, and delays of common carriers. The Contractor shall notify the Contracting Officer in writing as soon as it is reasonably possible after the commencement of any excusable delay, setting forth the full particulars in connection therewith, shall remedy such occurrence with all reasonable dispatch, and shall promptly give written notice to the Contracting Officer of the cessation of such occurrence.

(g) Invoice.

(1) The Contractor shall submit an original invoice and three copies (or electronic invoice, if authorized) to the address designated in the contract to receive invoices. An invoice must include--

(i) Name and address of the Contractor;

(ii) Invoice date and number;

(iii) Contract number, line item number and, if applicable, the order number;

(iv) Description, quantity, unit of measure, unit price andextended price of the items delivered;

(v) Shipping number and date of shipment, including the billof lading number and weight of shipment if shipped on Government bill of lading;

(vi) Terms of any discount for prompt payment offered;

(vii) Name and address of official to whom payment is to be sent;

(viii) Name, title, and phone number of person to notify in event of defective invoice; and

(ix) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(x) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision, contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer-System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer-Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by

EFT.

(2) Invoices will be handled in accordance with the Prompt Payment Act (31 U.S.C. 3903) and Office of Management and Budget (OMB) prompt payment regulations at 5 CFR part 1315.

(h) Patent indemnity. The Contractor shall indemnify the Government and its officers, employees and agents against liability, including costs, for actual or alleged direct or contributory infringement of, or inducement to infringe, any United States or foreign patent, trademark or copyright, arising out of the performance of this contract, provided the Contractor is reasonably notified of such claims and proceedings.

(i) Payment.--

(1) Items accepted. Payment shall be made for items acceptedby the Government that have been delivered to the delivery destinations set forth in this contract.

(2) Prompt Payment. The Government will make payment in accordance with the Prompt Payment Act (31 U.S.C. 3903) and prompt payment regulations at 5 CFR Part 1315.

PAGE 21 OF 31 ED-NAG-17-R-0002

(3) Electronic Funds Transfer (EFT). If the Government makes payment by EFT, see 52.212-5(b) for the appropriate EFT clause.

(4) Discount. In connection with any discount offered for early payment, time shall be computed from the date of the invoice. For the purpose of computing the discount earned, payment shall be considered to have been made on the date which appears on the payment check or the specified payment date if an electronic funds transfer payment is made.

(5) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall--

(i) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the--

(A) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) of overpayment);

(B) Affected contract number and delivery order number, if applicable;

(C) Affected line item or subline item, if applicable; and

(D) Contractor point of contact.

(ii) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(6) Interest.

(i) All amounts that become payable by the Contractor to the Government under this contract shall bear simple interest from the date due until paid unless paid within 30 days of becoming due. The interest rate shall be the interest rate established by the Secretary of the Treasury as provided in 41 U.S.C. 7109, which is applicable to the period in which the amount becomes due, as provided in (i)(6)(v) of this clause, and then at the rate applicable for each six-month period as fixed by the Secretary until the amount is paid.

(ii) The Government may issue a demand for payment to the Contractor upon finding a debt is due under the contract.

(iii) Final decisions. The Contracting Officer will issue a final decision as required by 33.211 if--

(A) The Contracting Officer and the Contractor are unable to reach agreement on the existence or amount of a debt within 30 days;

(B) The Contractor fails to liquidate a debt previously demanded by the Contracting Officer within the timeline specified in the demand for payment unless the amounts were not repaid because the Contractor has requested an installment payment agreement; or

(C) The Contractor requests a deferment of collection on a debt previously demanded by the Contracting Officer (see 32.607-2).

(iv) If a demand for payment was previously issued for the debt, the demand for payment included in the final decision shall identify the same due date as the original demand for payment.

(v) Amounts shall be due at the earliest of the following dates:

(A) The date fixed under this contract.

(B) The date of the first written demand for payment, including any demand for payment resulting from a default termination.

(vi) The interest charge shall be computed for the actual number of calendar days involved beginning on the due date and ending on--

(A) The date on which the designated office receives payment from the Contractor;

(B) The date of issuance of a Government check to the Contractor from which an amount otherwise payable has been withheld as a credit against the contract debt; or

(C) The date on which an amount withheld and applied to the contract debt would otherwise have become payable to the Contractor.

(vii) The interest charge made under this clause may be reduced under the procedures prescribed in 32.608-2 of the Federal Acquisition Regulation in effect on the date of this contract.

(j) Risk of loss. Unless the contract specifically provides otherwise, risk of loss or damage to the supplies provided under this contract shall remain with the Contractor until, and shall pass to the Government upon:

(1) Delivery of the supplies to a carrier, if transportation is f.o.b. origin; or

(2) Delivery of the supplies to the Government at the destination specified in the contract, if transportation is f.o.b. destination.

(k) Taxes. The contract price includes all applicable Federal, State, and local taxes and duties.

(l) Termination for the Government`s convenience. The Government reserves the right to terminate this contract, or any part hereof, for its sole convenience. In the event of such termination, the Contractor shall immediately stop all work hereunder and shall immediately cause any and all of its suppliers and subcontractors to cease work. Subject to the terms of this contract, the Contractor shall be paid a percentage of the contract price reflecting the percentage of the work performed prior to the notice of termination, plus reasonable charges the Contractor can demonstrate to the satisfaction of the Government using its standard record keeping system, have resulted from the termination. The Contractor shall not be required to comply with the cost accounting standards or contract cost principles for this purpose. This paragraph does not give the Government any right

PAGE 22 OF 31 ED-NAG-17-R-0002

to audit the Contractor`s records.