Editable_Exhibit_B-1_-_Rate_Sheet.xlsx

XLSX spreadsheet 45 KB Posted

Attached to
C5612135-D, Fire Suppression System Maintenance Services
Solicitation number
0000032461
Issued by
Imperial County, Kings County, Lassen County, Anaheim City, Stockton City, California

About this file

This document is a Rate Sheet for a state and local government contract opportunity issued by the California Department of Corrections and Rehabilitation (CDCR) for Fire Suppression System Services. The contract covers a variety of services including preventative maintenance, fire sprinkler and standpipe services, fire pump services, five-year fire sprinkler and standpipe testing and certification, fire hydrant flow testing, and repair services across 39 different CDCR facilities. The contract has an estimated total of over 20,000 hours of services, with the contractor to be compensated per the applicable hourly rates specified. The contract term is for an unspecified duration, and the CDCR reserves the right to increase or omit portions of the work as deemed necessary.

The Rate Sheet provides detailed pricing information, including hourly rates and estimated parts costs, for each of the CDCR facilities. Bidders may bid on one or more locations, but must provide rates for all items within a location. A zero-dollar bid will be interpreted as the bidder providing the service at no cost to the state. The CDCR also reserves the right to augment the contract value by 25% to 100% of the total bid amount. There are no set-asides or incumbents specified, and the funding source is not explicitly stated.

View the file

Other files

File Type Posted
C5612135-D_IFB_Package.pdf PDF
Addendum_5.pdf PDF
Addendum_6.pdf PDF
Addendum_4_Editable_-_Rate_Sheet.xlsx XLSX spreadsheet
Addendum_1.pdf PDF
Addendum_2.pdf PDF
Addendum_3.pdf PDF
Addendum_4.pdf PDF
Addendum_5_Editable_-_Rate_Sheet.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Rate Sheet

FIRE SUPPRESSION SYSTEM SERVICES

Electronic bid packages include an Excel version of this Rate Sheet (Exhibit B-1) in addition to the PDF file, in order to assist bidders in computing accurate totals. Bidders should download the Excel version and complete ALL highlighted cells.
The Contractor will be compensated for services performed in accordance with the applicable rate(s) specified on the Exhibit B-1, Rate Sheet which shall include all labor, personnel, transportation (including per diem, fuel, and mileage), materials, supplies, tools, any necessary equipment, permits, licenses, taxes, fees, shipping/freight charges, and every other item of expense necessary (unless otherwise specified herein) to provide services
Bidders may bid on one or more locations. Bidders are not required to bid on all locations; however, bidders must include a rate for all items within that location. Failure to indicate a dollar amount (blank cell) on any item may be grounds to reject the entire bid for that location. A zero dollar amount ($0.00 or $ -) listed for any and/or all items shall be interpreted and understood by the State to mean that the bidder will perform any such services at NO COST to the State.
Any and all services performed outside the scope of this Agreement shall be at the sole risk and expense of the Contractor. All prices and notations must be printed in ink or typewritten. All prices must be bid in U.S. currency and shall encompass every item of expense necessary to perform the services.
Quantities and services listed on the Exhibit B-1, Rate Sheet are the State's estimates only and are offered as a basis for the comparison of bids. The State does not expressly or by implication agree that the actual amount of work will correspond therewith and reserves the right to increase/omit portions of the work as may be deemed necessary or advisable by the State.
Hourly rates must meet minimum prevailing wage determination made by the Director of the California Department of Industrial Relations.
Emergency and overtime services provided by the Contractor at the request of the CDCR Contract Liaison or designee will be paid at 150% of the hourly service rate.
Contractor may offer a discount on invoices paid within thirty (30) days of receipt. Discount offered must be at least one percent and a minimum of $50.00.
Discount offered on invoices paid within 30 days of receipt =
In the event of a tie, absent other determining factors, the lowest responsible bid with the highest discount shall prevail. IF the highest discounts also tie, the awarded bidder shall be determined by a public coin toss.
The California Department of Corrections and Rehabilitation (CDCR) reserves the right to augment the dollar amount of this Master Agreement by 25% - 100% of the total bid amount.
There are no guarantees that any services will be requested from this agreement.
1. AVENAL STATE PRISON (ASP)
A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services120x=$ - 0
Fire Sprinkler and Standpipe Services440x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services110x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services600x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 30,000.00
Total for B$ 30,000.00

ASP TOTAL BASIS OF AWARD (A + B) $ - 0

2. CALIPATRIA STATE PRISON (CAL)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services168x=$ - 0
Fire Sprinkler and Standpipe Services212x=$ - 0
Fire Pump Services12x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services53x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services80x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 15,000.00
Total for B$ 15,000.00

CAL TOTAL BASIS OF AWARD (A + B) $ - 0

3. CALIFORNIA CORRECTIONAL CENTER (CCC) - (managed by HDSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services300x=$ - 0
Fire Sprinkler and Standpipe Services176x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services44x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services100x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 35,000.00
Total for B$ 35,000.00

CCC TOTAL BASIS OF AWARD (A + B) $ - 0

4. CALIFORNIA CORRECTIONAL INSTITUTION (CCI)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services24x=$ - 0
Fire Sprinkler and Standpipe Services12x=$ - 0
Fire Pump Services10x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services8x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services120x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 1,000.00
Total for B$ 1,000.00

CCI TOTAL BASIS OF AWARD (A + B) $ - 0

5. CENTRAL CALIFORNIA WOMEN'S FACILITY (CCWF)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services156x=$ - 0
Fire Sprinkler and Standpipe Services132x=$ - 0
Fire Pump Services12x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services33x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services25x=$ - 0
Repair Services500x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 150,000.00
Total for B$ 150,000.00

CCWF TOTAL BASIS OF AWARD (A + B) $ - 0

6. CENTINELA STATE PRISON (CEN)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services204x=$ - 0
Fire Sprinkler and Standpipe Services216x=$ - 0
Fire Pump Services12x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services55x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services300x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 15,000.00
Total for B$ 15,000.00

CEN TOTAL BASIS OF AWARD (A + B) $ - 0

7. CALIFORNIA HEALTH CARE FACILITY (CHCF)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services168x=$ - 0
Fire Sprinkler and Standpipe Services572x=$ - 0
Fire Pump Services12x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services127x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services400x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 45,000.00
Total for B$ 45,000.00

CHCF TOTAL BASIS OF AWARD (A + B) $ - 0

8. CALIFORNIA INSTITUTION FOR MEN (CIM)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services144x=$ - 0
Fire Sprinkler and Standpipe Services140x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services35x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services74x=$ - 0
Repair Services300x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 10,000.00
Total for B$ 10,000.00

CIM TOTAL BASIS OF AWARD (A + B) $ - 0

9. CALIFORNIA INSTITUTION FOR WOMEN (CIW)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services108x=$ - 0
Fire Sprinkler and Standpipe Services148x=$ - 0
Fire Pump Services12x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services37x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services250x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 10,000.00
Total for B$ 10,000.00

CIW TOTAL BASIS OF AWARD (A + B) $ - 0

10. CALIFORNIA MEN'S COLONY (CMC)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services204x=$ - 0
Fire Sprinkler and Standpipe Services304x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services76x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services100x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 30,000.00
Total for B$ 30,000.00

CMC TOTAL BASIS OF AWARD (A + B) $ - 0

11. CALIFORNIA MEDICAL FACILITY (CMF)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services132x=$ - 0
Fire Sprinkler and Standpipe Services392x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services18x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services400x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 60,000.00
Total for B$ 60,000.00

CMF TOTAL BASIS OF AWARD (A + B) $ - 0

12. CALIFORNIA STATE PRISON, CORCORAN (COR)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services252x=$ - 0
Fire Sprinkler and Standpipe Services224x=$ - 0
Fire Pump Services12x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services56x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services120x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 27,500.00
Total for B$ 27,500.00

COR TOTAL BASIS OF AWARD (A + B) $ - 0

13. CALIFORNIA REALITY BASED TRAINING CENTER (CRBTC)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services156x=$ - 0
Fire Sprinkler and Standpipe Services52x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services13x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services40x=$ - 0
Project Management20x=$ - 0
Total A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 3,000.00
Total for B$ 3,000.00

CRBTC TOTAL BASIS OF AWARD (A + B) $ - 0

14. CALIFORNIA REHABILITATION CENTER (CRC)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services48x=$ - 0
Fire Sprinkler and Standpipe Services192x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services48x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services192x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 50,000.00
Total for B$ 50,000.00

CRC TOTAL BASIS OF AWARD (A + B) $ - 0

15. RICHARD A. MCGEE CORRECTIONAL TRAINING CENTER (CTC)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services24x=$ - 0
Fire Sprinkler and Standpipe Services88x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services22x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services300x=$ - 0
Project Management20x=$ - 0
Total A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 4,500.00
Total for B$ 4,500.00

CTC TOTAL BASIS OF AWARD (A + B) $ - 0

16. CORRECTIONAL TRAINING FACILITY (CTF)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services132x=$ - 0
Fire Sprinkler and Standpipe Services392x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services94x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services40x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 5,500.00
Total for B$ 5,500.00

CTF TOTAL BASIS OF AWARD (A + B) $ - 0

17. CHUCKAWALLA VALLEY STATE PRISON (CVSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services264x=$ - 0
Fire Sprinkler and Standpipe Services260x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services65x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services112x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 50,000.00
Total for B$ 50,000.00

CVSP TOTAL BASIS OF AWARD (A + B) $ - 0

18. FOLSOM STATE PRISON (FSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services96x=$ - 0
Fire Sprinkler and Standpipe Services44x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services11x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services4x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 6,000.00
Total for B$ 6,000.00

FSP TOTAL BASIS OF AWARD (A + B) $ - 0

19. HIGH DESERT STATE PRISON (HDSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services216x=$ - 0
Fire Sprinkler and Standpipe Services240x=$ - 0
Fire Pump Services12x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services53x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services24x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 7,600.00
Total for B$ 7,600.00

HDSP TOTAL BASIS OF AWARD (A + B) $ - 0

20. IRONWOOD STATE PRISON (ISP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services252x=$ - 0
Fire Sprinkler and Standpipe Services192x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services48x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services80x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 20,000.00
Total for B$ 20,000.00

ISP TOTAL BASIS OF AWARD (A + B) $ - 0

21. KERN VALLEY STATE PRISON (KVSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services372x=$ - 0
Fire Sprinkler and Standpipe Services208x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services52x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services75x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 10,000.00
Total for B$ 10,000.00

KVSP TOTAL BASIS OF AWARD (A + B) $ - 0

22. CALIFORNIA STATE PRISON, LOS ANGELES COUNTY (LAC)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services120x=$ - 0
Fire Sprinkler and Standpipe Services252x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services58x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services160x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 110,000.00
Total for B$ 110,000.00

LAC TOTAL BASIS OF AWARD (A + B) $ - 0

23. MULE CREEK STATE PRISON (MCSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services336x=$ - 0
Fire Sprinkler and Standpipe Services408x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services232x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services150x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 4,000.00
Total for B$ 4,000.00

MCSP TOTAL BASIS OF AWARD (A + B) $ - 0

24. NORTH KERN STATE PRISON (NKSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services72x=$ - 0
Fire Sprinkler and Standpipe Services196x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services80x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services200x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 23,200.00
Total for B$ 23,200.00

NKSP TOTAL BASIS OF AWARD (A + B) $ - 0

25. PELICAN BAY STATE PRISON (PBSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services120x=$ - 0
Fire Sprinkler and Standpipe Services348x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services87x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services300x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Other
DescriptionRate
(per technician)=Total
Service Fee
(One charge per PBSP service call per week. Requires prior written approval from CDCR Contract Liaison or designee. See Exhibit A, Scope of Work.)=$ - 0
Total for B$ - 0
C. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 20,000.00
Total C$ 20,000.00

PBSP TOTAL BASIS OF AWARD (A + B + C) $ - 0

26. PLEASANT VALLEY STATE PRISON (PVSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services156x=$ - 0
Fire Sprinkler and Standpipe Services180x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services45x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services120x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 10,000.00
Total for B$ 10,000.00

PVSP TOTAL BASIS OF AWARD (A + B) $ - 0

27. RICHARD J. DONOVAN CORRECTIONAL FACILITY (RJD)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services108x=$ - 0
Fire Sprinkler and Standpipe Services336x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services84x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services320x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 40,000.00
Total for B$ 40,000.00

RJD TOTAL BASIS OF AWARD (A + B) $ - 0

28. CALIFORNIA STATE PRISON, SACRAMENTO (SAC)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services168x=$ - 0
Fire Sprinkler and Standpipe Services328x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services82x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services90x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 10,000.00
Total for B$ 10,000.00

SAC TOTAL BASIS OF AWARD (A + B) $ - 0

29. CALIFORNIA SUBSTANCE ABUSE TREATMENT FACILITY AND STATE PRISON (SATF)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services168x=$ - 0
Fire Sprinkler and Standpipe Services672x=$ - 0
Fire Pump Services12x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services98x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services120x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 20,000.00
Total for B$ 20,000.00

SATF TOTAL BASIS OF AWARD (A + B) $ - 0

30. SIERRA CONSERVATION CENTER (SCC)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services96x=$ - 0
Fire Sprinkler and Standpipe Services160x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services40x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services120x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 20,000.00
Total for B$ 20,000.00

SCC TOTAL BASIS OF AWARD (A + B) $ - 0

31. CALIFORNIA STATE PRISON, SOLANO (SOL)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services84x=$ - 0
Fire Sprinkler and Standpipe Services308x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services77x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services100x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 20,000.00
Total for B$ 20,000.00

SOL TOTAL BASIS OF AWARD (A + B) $ - 0

32. SAN QUENTIN REHABILITATION CENTER (SQRC)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services108x=$ - 0
Fire Sprinkler and Standpipe Services636x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services159x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services50x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 18,000.00
Total for B$ 18,000.00

SQRC TOTAL BASIS OF AWARD (A + B) $ - 0

33. SALINAS VALLEY STATE PRISON (SVSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services456x=$ - 0
Fire Sprinkler and Standpipe Services964x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services58x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services40x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 50,000.00
Total for B$ 50,000.00

SVSP TOTAL BASIS OF AWARD (A + B) $ - 0

34. VALLEY STATE PRISON (VSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services60x=$ - 0
Fire Sprinkler and Standpipe Services136x=$ - 0
Fire Pump Services12x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services34x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services25x=$ - 0
Repair Services400x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 45,000.00
Total for B$ 45,000.00

VSP TOTAL BASIS OF AWARD (A + B) $ - 0

35. WASCO STATE PRISON (WSP)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services120x=$ - 0
Fire Sprinkler and Standpipe Services236x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services57x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services1,390x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 160,000.00
Total for B$ 160,000.00

WSP TOTAL BASIS OF AWARD (A + B) $ - 0

36. ANTELOPE CAMP - SCC (CC #25)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services36x=$ - 0
Fire Sprinkler and Standpipe Services36x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services12x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services50x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 5,000.00
Total for B$ 5,000.00

CC #25 TOTAL BASIS OF AWARD (A + B) $ - 0

37. NORTH COAST WAREHOUSE (managed by SCC)
A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services36x=$ - 0
Fire Sprinkler and Standpipe Services16x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services133x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services50x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 5,000.00
Total for B$ 5,000.00

NORTH COAST WAREHOUSE TOTAL BASIS OF AWARD (A + B) $ - 0

38. CCTRP LOS ANGELES (LA CADA)

A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services36x=$ - 0
Fire Sprinkler and Standpipe Services132x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services132x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services200x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 25,000.00
Total for B$ 25,000.00
CCTRP LOS ANGELES TOTAL BASIS OF AWARD (A + B)$ - 0
39. CCTRP SAN DIEGO (Westcare)
A. Hourly Services
DescriptionEstimated Number of Hours
(full term of agreement)xHourly Rate
(per technician)=Total
Preventative Maintenance Services24x=$ - 0
Fire Sprinkler and Standpipe Services132x=$ - 0
Fire Pump Services25x=$ - 0
Five-Year Fire Sprinkler and Standpipe Testing and Certification Services132x=$ - 0
Fire Hydrant Flow Testing and Roll-Down Door Services12x=$ - 0
Repair Services200x=$ - 0
Project Management20x=$ - 0
Total for A$ - 0
B. Estimated Parts
Any parts requiring replacement on equipment not included in preventative maintenance$ 25,000.00
Total for B$ 25,000.00

CCTRP SAN DIEGO TOTAL BASIS OF AWARD (A + B) $ - 0

&11 California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &"Arial,Bold"

&11Bid Number C5612135-D Exhibit B-1&"Arial,Bold"

&11 California Department of Corrections and Rehabilitation (CDCR) Rate Sheet &11Bid Number C5607909-D Exhibit B-1 Addendum 7

&11Page &P of &N

File details come from the government source that posted it. Updated .