Attachment_B-_Cost-Price_Template.xlsx

XLSX spreadsheet 98 KB Posted

Attached to
Peer Review and Support for Regional Educational Laboratories Federal contract opportunity
Solicitation number
ED-IES-17-R-0025
Issued by
Department of Education Contracts and Acquisition Management

About this file

Cost-Price Template (Excel Document)

View the file

Other files for this federal contract opportunity

Other files attached to Peer Review and Support for Regional Educational Laboratories, newest first.
File Type Posted
Attachment_F-_Security_Clearance_Application_Initiation.xlsx XLSX spreadsheet
RFP__ED-IES-17-R-0025_(Peer_Support_RELs).pdf PDF
Attachment_D-_Small_Business_Subcontracting_Plan.docx DOCX document
Attachment_E_-Contractor_Personnel_Listing.xlsx XLSX spreadsheet
Attachment_C-_Contractor_Performance_Information.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Summary

Peer Review and Support for Regional Educational Laboratories
Solicitation #ED-IES-17-R-0025
Price Summary
Base PeriodOption Years
Base Year 1Base Year 2Option Year 1Option Year 2Option Year 3Grand Total
Core Tasks$ 200.00$ - 0$ - 0$ - 0$ - 0$ 200.00
Fixed PriceCost ReimbursementFixed PriceCost ReimbursementFixed PriceCost ReimbursementFixed PriceCost ReimbursementFixed PriceCost Reimbursement
$ 100.00$ 100.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
Optional Tasks$ 200.00$ - 0$ - 0$ - 0$ - 0$ 200.00
Fixed PriceCost ReimbursementFixed PriceCost ReimbursementFixed PriceCost ReimbursementFixed PriceCost ReimbursementFixed PriceCost Reimbursement
$ 100.00$ 100.00$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

Total (Fixed & CR) $ 200.00 $ 200.00 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0 $ - 0

Grand Total $ 400.00 $ - 0 $ - 0 $ - 0 $ - 0 $ 400.00

Attachment B -Cost-Price Template

Base Year 1

Cost for Base Period (Year 1)
Task 1: Communication with IESTask 2: Refine, Improve, and Implement Review Criteria and Processes for REL Work (Cost reimbursement, Non-IT)Task 3: Build and Support a Web-Based Tracking and Review Application for REL WorkTask 4: Technical Editing, Formatting, and Production of ReportsTask 5: As-Needed Guidance for Improvement of REL ProductsTask 6: As-Needed Analytic and Methods Oriented Projects (Optional Task)Task 7: Logistical Support
FFP, Non-ITFFP, Non-ITCPFFFFP, Non-ITFFP, Non-ITTotal Task 1CPFFTotal Task 2CPFFFFP ITCPFFTotal Task 3CPFFTotal Task 4CPFFTotal Task 5CPFFTotal Task 6Now CPFF ITNow CPFF ITFFP, Non-IT
Task 1.1 Security Clearance RequirementsTask 1.2 KickoffTask 1.3 Periodic CallsTask 1.4 Monthly Progress ReportsTask 1.5 Progress AssessmentTotal Labor HoursTotal CostTask 2.1 Refine CriteriaTask 2.2 Review ResearchTotal Labor HoursTotal CostTask 3.1 Build Web-Based ApplicationTask 3.2 Training, Tech supportTask 3.3 Temp email processTotal Labor HoursTotal CostSubtask 4.1: Update GuideSubtasks 4.2 Report Editing, Formatting, and ProductionSubtasks 4.3: Update Report TemplatesTotal Labor HoursTotal CostTask 5: As-Needed Guidance for Improvement of REL ProductsTotal Labor HoursTotal CostTask 6.1: Analytic ProjectsTask 6.2: MeetingsTotal Labor HoursTotal CostTask 7.1A: Ask-A-REL SummaryTask 7.2 SFS Sum. (FP, IT)Task 7.3 REL DIR Mtg (CR, Non-IT)
Labor PrimeLabor Rate (per hour)Labor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor Hours
Name, Title, Company (example: John Smith, Project Director - XYZ Co)$100.0010$1,000.0010$ 1,000.0010$ 1,000.0010$ 1,000.0010$ 1,000.0040$4,000.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Labor Subcontractor$ - 0$ - 0$ - 0$ - 0
Name, Title, Company (example: Jane Smith, Research Assistant - ABC Company)$150.0010$ 1,500.0010$ 1,500.0010$ 1,500.0010$1,500.0010$ 1,500.0040$6,000.00
0$0.00
0$0.00
0$0.00
0$0.00
Total labor:20250020$2,500.00$2,500.00$2,500.00$2,500.00$10,000.00
ODCs
Consultant 1 (Name)
Consultant 2 (Name)
Consultant 3 (Name)
Facilities
Equipment/AV
Phone/Courier/Postage
Printing and Publication
Meeting
Travel
Fringe Benefit @
G & A @
Fixed Fee @
Total ODCs per task:$ - 0$0.00$0.00$0.00$0.00$0.00
TOTAL COST:$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00$10,000.00
Costs by the four types of funds
Total Cost Reimbursement Non-IT (Base Year 1)$ - 0
Total Cost Reimbursement IT (Base Year 1)$ - 0
Firm-Fixed-Price IT (Base Year 1)$ - 0
Firm-fixed-price non-IT (Base Year 1)$ - 0
Total COSTS (Base Year 1)$ - 0

Attachment B -Pricing Template

Base Year 2

Cost for Base Period (Year 2)
Task 1: Communication with IESTask 2: Refine, Improve, and Implement Review Criteria and Processes for REL Work (Cost reimbursement, Non-IT)Task 3: Build and Support a Web-Based Tracking and Review Application for REL WorkTask 4: Technical Editing, Formatting, and Production of ReportsTask 5: As-Needed Guidance for Improvement of REL ProductsTask 6: As-Needed Analytic and Methods Oriented Projects (Optional Task)Task 7: Logistical Support
FFP, Non-ITFFP, Non-ITCPFFFFP, Non-ITFFP, Non-ITTotal Task 1CPFFTotal Task 2CPFFFFP ITCPFFTotal Task 3CPFFTotal Task 4CPFFTotal Task 5CPFFTotal Task 6Now CPFF ITNow CPFF ITFFP, Non-IT
Task 1.1 Security Clearance RequirementsTask 1.2 KickoffTask 1.3 Periodic CallsTask 1.4 Monthly Progress ReportsTask 1.5 Progress AssessmentTotal Labor HoursTotal CostTask 2.1 Refine CriteriaTask 2.2 Review ResearchTotal Labor HoursTotal CostTask 3.1 Build Web-Based ApplicationTask 3.2 Training, Tech supportTask 3.3 Temp email processTotal Labor HoursTotal CostSubtask 4.1: Update GuideSubtasks 4.2 Report Editing, Formatting, and ProductionSubtasks 4.3: Update Report TemplatesTotal Labor HoursTotal CostTask 5: As-Needed Guidance for Improvement of REL ProductsTotal Labor HoursTotal CostTask 6.1: Analytic ProjectsTask 6.2: MeetingsTotal Labor HoursTotal CostTask 7.1A: Ask-A-REL SummaryTask 7.2 SFS Sum. (FP, IT)Task 7.3 REL DIR Mtg (CR, Non-IT)
Labor PrimeLabor Rate (per hour)Labor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor Hours
Name, Title, Company (example: John Smith, Project Director - XYZ Co)$100.0010$1,000.0010$ 1,000.0010$ 1,000.0010$ 1,000.0010$ 1,000.0040$4,000.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Labor Subcontractor$ - 0$ - 0$ - 0$ - 0
Name, Title, Company (example: Jane Smith, Research Assistant - ABC Company)$150.0010$ 1,500.0010$ 1,500.0010$ 1,500.0010$1,500.0010$ 1,500.0040$6,000.00
0$0.00
0$0.00
0$0.00
0$0.00
Total labor:20250020$2,500.00$2,500.00$2,500.00$2,500.00$10,000.00
ODCs
Consultant 1 (Name)
Consultant 2 (Name)
Consultant 3 (Name)
Facilities
Equipment/AV
Phone/Courier/Postage
Printing and Publication
Meeting
Travel
Fringe Benefit @
G & A @
Fixed Fee @
Total ODCs per task:$ - 0$0.00$0.00$0.00$0.00$0.00
TOTAL COST:$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00$10,000.00
Costs by the four types of funds
Total Cost Reimbursement Non-IT (Base Year 2)$ - 0
Total Cost Reimbursement IT (Base Year 2)$ - 0
Firm-Fixed-Price IT (Base Year 2)$ - 0
Firm-fixed-price non-IT (Base Year 2)$ - 0
Total COSTS (Base Year 2)$ - 0

Option Year 1 ( Year 3)

Cost for Option Year 1 (Year 3)
Task 1: Communication with IESTask 2: Refine, Improve, and Implement Review Criteria and Processes for REL Work (Cost reimbursement, Non-IT)Task 3: Build and Support a Web-Based Tracking and Review Application for REL WorkTask 4: Technical Editing, Formatting, and Production of ReportsTask 5: As-Needed Guidance for Improvement of REL ProductsTask 6: As-Needed Analytic and Methods Oriented Projects (Optional Task)Task 7: Logistical Support
FFP, Non-ITFFP, Non-ITCPFFFFP, Non-ITFFP, Non-ITTotal Task 1CPFFTotal Task 2CPFFFFP ITCPFFTotal Task 3CPFFTotal Task 4CPFFTotal Task 5CPFFTotal Task 6Now CPFF ITNow CPFF ITFFP, Non-IT
Task 1.1 Security Clearance RequirementsTask 1.2 KickoffTask 1.3 Periodic CallsTask 1.4 Monthly Progress ReportsTask 1.5 Progress AssessmentTotal Labor HoursTotal CostTask 2.1 Refine CriteriaTask 2.2 Review ResearchTotal Labor HoursTotal CostTask 3.1 Build Web-Based ApplicationTask 3.2 Training, Tech supportTask 3.3 Temp email processTotal Labor HoursTotal CostSubtask 4.1: Update GuideSubtasks 4.2 Report Editing, Formatting, and ProductionSubtasks 4.3: Update Report TemplatesTotal Labor HoursTotal CostTask 5: As-Needed Guidance for Improvement of REL ProductsTotal Labor HoursTotal CostTask 6.1: Analytic ProjectsTask 6.2: MeetingsTotal Labor HoursTotal CostTask 7.1A: Ask-A-REL SummaryTask 7.2 SFS Sum. (FP, IT)Task 7.3 REL DIR Mtg (CR, Non-IT)
Labor PrimeLabor Rate (per hour)Labor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor Hours
Name, Title, Company (example: John Smith, Project Director - XYZ Co)$100.0010$1,000.0010$ 1,000.0010$ 1,000.0010$ 1,000.0010$ 1,000.0040$4,000.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Labor Subcontractor$ - 0$ - 0$ - 0$ - 0
Name, Title, Company (example: Jane Smith, Research Assistant - ABC Company)$150.0010$ 1,500.0010$ 1,500.0010$ 1,500.0010$1,500.0010$ 1,500.0040$6,000.00
0$0.00
0$0.00
0$0.00
0$0.00
Total labor:20250020$2,500.00$2,500.00$2,500.00$2,500.00$10,000.00
ODCs
Consultant 1 (Name)
Consultant 2 (Name)
Consultant 3 (Name)
Facilities
Equipment/AV
Phone/Courier/Postage
Printing and Publication
Meeting
Travel
Fringe Benefit @
G & A @
Fixed Fee @
Total ODCs per task:$ - 0$0.00$0.00$0.00$0.00$0.00
TOTAL COST:$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00$10,000.00
Costs by the four types of funds
Total Cost Reimbursement Non-IT (Option Year 1)$ - 0
Total Cost Reimbursement IT (Option Year 1)$ - 0
Firm-Fixed-Price IT (Option Year 1)$ - 0
Firm-fixed-price non-IT (Option Year 1)$ - 0
Total COSTS (Option Year 1)$ - 0

Option Year 2 ( Year 4)

Cost for Option Year 2 (Year 4)
Task 1: Communication with IESTask 2: Refine, Improve, and Implement Review Criteria and Processes for REL Work (Cost reimbursement, Non-IT)Task 3: Build and Support a Web-Based Tracking and Review Application for REL WorkTask 4: Technical Editing, Formatting, and Production of ReportsTask 5: As-Needed Guidance for Improvement of REL ProductsTask 6: As-Needed Analytic and Methods Oriented Projects (Optional Task)Task 7: Logistical Support
FFP, Non-ITFFP, Non-ITCPFFFFP, Non-ITFFP, Non-ITTotal Task 1CPFFTotal Task 2CPFFFFP ITCPFFTotal Task 3CPFFTotal Task 4CPFFTotal Task 5CPFFTotal Task 6Now CPFF ITNow CPFF ITFFP, Non-IT
Task 1.1 Security Clearance RequirementsTask 1.2 KickoffTask 1.3 Periodic CallsTask 1.4 Monthly Progress ReportsTask 1.5 Progress AssessmentTotal Labor HoursTotal CostTask 2.1 Refine CriteriaTask 2.2 Review ResearchTotal Labor HoursTotal CostTask 3.1 Build Web-Based ApplicationTask 3.2 Training, Tech supportTask 3.3 Temp email processTotal Labor HoursTotal CostSubtask 4.1: Update GuideSubtasks 4.2 Report Editing, Formatting, and ProductionSubtasks 4.3: Update Report TemplatesTotal Labor HoursTotal CostTask 5: As-Needed Guidance for Improvement of REL ProductsTotal Labor HoursTotal CostTask 6.1: Analytic ProjectsTask 6.2: MeetingsTotal Labor HoursTotal CostTask 7.1A: Ask-A-REL SummaryTask 7.2 SFS Sum. (FP, IT)Task 7.3 REL DIR Mtg (CR, Non-IT)
Labor PrimeLabor Rate (per hour)Labor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor Hours
Name, Title, Company (example: John Smith, Project Director - XYZ Co)$100.0010$1,000.0010$ 1,000.0010$ 1,000.0010$ 1,000.0010$ 1,000.0040$4,000.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Labor Subcontractor$ - 0$ - 0$ - 0$ - 0
Name, Title, Company (example: Jane Smith, Research Assistant - ABC Company)$150.0010$ 1,500.0010$ 1,500.0010$ 1,500.0010$1,500.0010$ 1,500.0040$6,000.00
0$0.00
0$0.00
0$0.00
0$0.00
Total labor:20250020$2,500.00$2,500.00$2,500.00$2,500.00$10,000.00
ODCs
Consultant 1 (Name)
Consultant 2 (Name)
Consultant 3 (Name)
Facilities
Equipment/AV
Phone/Courier/Postage
Printing and Publication
Meeting
Travel
Fringe Benefit @
G & A @
Fixed Fee @
Total ODCs per task:$ - 0$0.00$0.00$0.00$0.00$0.00
TOTAL COST:$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00$10,000.00
Costs by the four types of funds
Total Cost Reimbursement Non-IT (Option Year 2)$ - 0
Total Cost Reimbursement IT (Option Year 2)$ - 0
Firm-Fixed-Price IT (Option Year 2)$ - 0
Firm-fixed-price non-IT (Option Year 2)$ - 0
Total COSTS (Option Year 2)$ - 0

Option Year 3 ( Year 5)

Cost for Option Year 3 (Year 5)
Task 1: Communication with IESTask 2: Refine, Improve, and Implement Review Criteria and Processes for REL Work (Cost reimbursement, Non-IT)Task 3: Build and Support a Web-Based Tracking and Review Application for REL WorkTask 4: Technical Editing, Formatting, and Production of ReportsTask 5: As-Needed Guidance for Improvement of REL ProductsTask 6: As-Needed Analytic and Methods Oriented Projects (Optional Task)Task 7: Logistical Support
FFP, Non-ITFFP, Non-ITCPFFFFP, Non-ITFFP, Non-ITTotal Task 1CPFFTotal Task 2CPFFFFP ITCPFFTotal Task 3CPFFTotal Task 4CPFFTotal Task 5CPFFTotal Task 6Now CPFF ITNow CPFF ITFFP, Non-IT
Task 1.1 Security Clearance RequirementsTask 1.2 KickoffTask 1.3 Periodic CallsTask 1.4 Monthly Progress ReportsTask 1.5 Progress AssessmentTotal Labor HoursTotal CostTask 2.1 Refine CriteriaTask 2.2 Review ResearchTotal Labor HoursTotal CostTask 3.1 Build Web-Based ApplicationTask 3.2 Training, Tech supportTask 3.3 Temp email processTotal Labor HoursTotal CostSubtask 4.1: Update GuideSubtasks 4.2 Report Editing, Formatting, and ProductionSubtasks 4.3: Update Report TemplatesTotal Labor HoursTotal CostTask 5: As-Needed Guidance for Improvement of REL ProductsTotal Labor HoursTotal CostTask 6.1: Analytic ProjectsTask 6.2: MeetingsTotal Labor HoursTotal CostTask 7.1A: Ask-A-REL SummaryTask 7.2 SFS Sum. (FP, IT)Task 7.3 REL DIR Mtg (CR, Non-IT)
Labor PrimeLabor Rate (per hour)Labor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor HoursCostLabor Hours
Name, Title, Company (example: John Smith, Project Director - XYZ Co)$100.0010$1,000.0010$ 1,000.0010$ 1,000.0010$ 1,000.0010$ 1,000.0040$4,000.00
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0$ - 0
Labor Subcontractor$ - 0$ - 0$ - 0$ - 0
Name, Title, Company (example: Jane Smith, Research Assistant - ABC Company)$150.0010$ 1,500.0010$ 1,500.0010$ 1,500.0010$1,500.0010$ 1,500.0040$6,000.00
0$0.00
0$0.00
0$0.00
0$0.00
Total labor:20250020$2,500.00$2,500.00$2,500.00$2,500.00$10,000.00
ODCs
Consultant 1 (Name)
Consultant 2 (Name)
Consultant 3 (Name)
Facilities
Equipment/AV
Phone/Courier/Postage
Printing and Publication
Meeting
Travel
Fringe Benefit @
G & A @
Fixed Fee @
Total ODCs per task:$ - 0$0.00$0.00$0.00$0.00$0.00
TOTAL COST:$2,500.00$2,500.00$2,500.00$2,500.00$2,500.00$10,000.00
Costs by the four types of funds
Total Cost Reimbursement Non-IT (Option Year 3)$ - 0
Total Cost Reimbursement IT (Option Year 3)$ - 0
Firm-Fixed-Price IT (Option Year 3)$ - 0
Firm-fixed-price non-IT (Option Year 3)$ - 0
Total COSTS (Option Year 3)$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .