About this file

Solicitation No. ED-IES-16-R-0014

View the file

Other files

File Type Posted
Summary_of_Proposal_Price.xlsx XLSX spreadsheet
Amendment_0001_to_ED-IES-16-R-0014_(SF30).pdf PDF
Past_Performance_Form.docx DOCX document
Summary_of_Proposal_Price.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED

ORDER UNDER DPAS (15 CFR 700)

RATING

PAGE OF

PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

ED-IES-16-R-0014 SEALED BID (IFB)

NEGOTIATED (RFP)

7. ISSUED BY CODE CAMPCP 8. ADDRESS OFFER TO (If other than Item 7)

US Dept of ED-550 12th Street SW - Room 7169 Washington DC 20065

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in until 10:00

AM ET

local time AUG 01, (Hour) (Date)

CAUTION - LATE Submissions, Modifications, and Withdrawls: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION CALL

A. NAME

Stephen Madsen

B. TELEPHONE (NO COLLECT CALLS)

202-245-6293

C. E-MAIL ADDRESS

Stephen.Madsen@ed.gov

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGES(S) (X) SEC. DESCRIPTION PAGE(S)

PART 1 - THE SCHEDULE PART II - CONTRACT CLAUSES

X A SOLICITATION/CONTRACT FORM 1 - 1 X I CONTRACT CLAUSES 21 - 28

B SUPPLIES OR SERVICES AND PRICES/COSTS 6 - 8 PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACH.

X C DESCRIPTION/SPECS./WORK STATEMENT 9 - 9 X J LIST OF ATTACHMENTS 29 - 52

D PACKAGING AND MARKING - PART IV - PRESENTATIONS AND INSTRUCTIONS

X E INSPECTION AND ACCEPTANCE 10 - 10 X K REPRESENTATIONS, CERTIFICATIONS AND OTHER 53 - 65

X F DELIVERIES OR PERFORMANCE 11 - 11 STATEMENTS OF OFFERORS

X G CONTRACT ADMINISTRATION DATA 12 - 13 X L INSTRS., CONDS., AND NOTICES TO OFFERORS 66 - 85

X H SPECIAL CONTRACT REQUIREMENTS 14 - 20 X M EVALUATION FACTORS FOR AWARD 86 - 88

OFFER

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all itmes upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

14. ACKNOWLEDGMENT OF AMENDMENTS AMENDMENT NO. DATE AMENDMENT NO. DATE

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

15A. NAME AND

ADDRESS OF

OFFEROR

DUNS: (Type or print)

15B. TELEPHONE NUMBER

15C. CHECK IF REMITTANCE ADDRESS IS DIFFERENT FROM

ABOVE - ENTER SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

See Schedule

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C 23004(c) ( ) 41 U.S.C 253(c) ( )

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

ITEM

24. ADMINISTERED BY CODE 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER(Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

(Signature of Contracting Officer)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice. (Must be fully completed by offeror)

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA - FAR (48 CFR) 53.214(c)

Table of Contents

PAGE 2 OF 88 ED-IES-16-R-0014

SECTION B SUPPLIES OR SERVICES AND PRICES/COSTS

B. 1 Contract Value, Period of Perf., and Line Items

SECTION C DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 302-2 SCOPE OF WORK (FEBRUARY 1985)

SECTION E INSPECTION AND ACCEPTANCE

E. 1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

E. 2 52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)

SECTION F DELIVERIES OR PERFORMANCE

F. 1 52.242-15 STOP-WORK ORDER (AUG 1989)

F. 2 52.242-15 I STOP-WORK ORDER (AUG 1989)--ALTERNATE I (APR 1984)

F. 3 305-4 PERIOD OF PERFORMANCE (MARCH 1986)

SECTION G CONTRACT ADMINISTRATION DATA

G. 1 3452.201-70 CONTRACTING OFFICER`s REPRESENTATIVE (COR) (MAY 2011)

G. 2 306-1b Invoice and Contract Financing Requests Submission - IPP (December 2013)

G. 3 306-8 CONTRACT ADMINISTRATOR (FEB 1985)

G. 4 306-9 PROVISIONAL AND NEGOTIATED FINAL OVERHEAD RATES (OCTOBER 1993)

SECTION H SPECIAL CONTRACT REQUIREMENTS

H. 1 3452.202-1 DEFINITIONS--DEPARTMENT OF EDUCATION (MAY 2011)

H. 2 3452.208-71 PRINTING (MAY 2011)

H. 3 3452.208-72 PAPERWORK REDUCTION ACT (MAY 2011)

H. 4 3452.209-71 CONFLICT OF INTEREST (MAY 2011)

H. 5 3452.215-70 RELEASE OF RESTRICTED DATA (MAY 2011)

H. 6 3452.224-70 RELEASE OF INFORMATION UNDER THE FREEDOM OF INFORMATION ACT (MAY 2011)

H. 7 3452.224-71 NOTICE ABOUT RESEARCH ACTIVITIES INVOLVING HUMAN SUBJECTS (MAY 2011)

H. 8 3452.227-71 ADVERTISING OF AWARDS (MAY 2011)

H. 9 3452.227-72 USE AND NON-DISCLOSURE AGREEMENT (MAY 2011)

H. 10 3452.227-73 LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED

WITH RESTRICTIVE LEGENDS (MAY 2011)

H. 11 3452.228-70 REQUIRED INSURANCE (MAY 2011)

H. 12 3452.237-70 SERVICES OF CONSULTANTS (MAY 2011)

H. 13 3452.237-71 OBSERVANCE OF ADMINISTRATIVE CLOSURES (MAY 2011)

H. 14 EDAR 3452.237-71 (Holidays) Addendum

H. 15 3452.242-70 LITIGATION AND CLAIMS (MAY 2011)

H. 16 3452.242-71 NOTICE TO THE GOVERNMENT OF DELAYS (MAY 2011)

H. 17 3452.242-73 ACCESSIBILITY OF MEETINGS, CONFERENCES, AND SEMINARS TO PERSONS WITH

DISABILITIES (MAY 2011)

H. 18 3452.247-70 FOREIGN TRAVEL (MAY 2011)

H. 19 3452.227-70 PUBLICATION AND PUBLICITY (MAY 2011)

H. 20 3452.239-72 Department Security Requirements

H. 21 3452.243-70 KEY PERSONNEL (MAY 2011)

H. 22 31.205.71 TRAVEL COSTS

H. 23 307-19 REDACTED PROPOSALS (DECEMBER 1998)

H. 24 313.237-72 CLEARANCE OF CONFERENCES/MEETINGS (FEBRUARY 2015):

H. 25 316-1 ACCESSIBILITY OF SOFTWARE (OCTOBER 1999)

PAGE 3 OF 88 ED-IES-16-R-0014

SECTION I CONTRACT CLAUSES

I. 1 52.202-1 DEFINITIONS (NOV 2013)

I. 2 52.203-3 GRATUITIES (APR 1984)

I. 3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

I. 4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

I. 5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

I. 6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY

(MAY 2014)

I. 7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

I. 8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)

I. 9 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)

I. 10 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF

WHISTLEBLOWER RIGHTS (APR 2014)

I. 11 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)... 21

I. 12 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2015).. 21

I. 13 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)

I. 14 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (JAN 2014)

I. 15 52.209-6 PROTECTING THE GOVERNMENT`S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS

DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)

I. 16 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY

2013)

I. 17 52.210-1 MARKET RESEARCH (APR 2011)

I. 18 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)

I. 19 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

I. 20 52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA (AUG 2011)

I. 21 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA--MODIFICATIONS (AUG

2011)

I. 22 52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (OCT 2010)

I. 23 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA--MODIFICATIONS (OCT 2010)

I. 24 52.215-22 LIMITATIONS ON PASS-THROUGH CHARGES -- IDENTIFICATION OF SUBCONTRACT EFFORT (OCT

2009)

I. 25 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009)

I. 26 52.216-7 ALLOWABLE COST AND PAYMENT (JULY 2013)

I. 27 52.216-8 FIXED FEE (JUN 2011)

I. 28 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS (OCT

2014)

I. 29 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)

I. 30 52.219-9 II SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2015)--ALTERNATE II (OCT 2001)

I. 31 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)

I. 32 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (OCT 2014)

I. 33 52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)

I. 34 52.222-3 CONVICT LABOR (JUN 2003)

I. 35 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

I. 36 52.222-26 EQUAL OPPORTUNITY (APR 2015)

I. 37 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. [OCT 2015]

I. 38 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

I. 39 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

I. 40 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC

2010)

I. 41 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

PAGE 4 OF 88 ED-IES-16-R-0014

I. 42 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

I. 43 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

I. 44 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011). 24

I. 45 52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)

I. 46 52.224-2 PRIVACY ACT (APR 1984)

I. 47 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

I. 48 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

I. 49 52.227-17 RIGHTS IN DATA--SPECIAL WORKS (DEC 2007)

I. 50 52.228-7 INSURANCE--LIABILITY TO THIRD PERSONS (MAR 1996)

I. 51 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

I. 52 52.230-2 COST ACCOUNTING STANDARDS (OCT 2015)

I. 53 52.230-3 DISCLOSURE AND CONSISTENCY OF COST ACCOUNTING PRACTICES (OCT 2015)

I. 54 52.232-1 PAYMENTS (APR 1984)

I. 55 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)

I. 56 52.232-11 EXTRAS (APR 1984)

I. 57 52.232-17 INTEREST (MAY 2014)

I. 58 52.232-20 LIMITATION OF COST (APR 1984)

I. 59 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

I. 60 52.232-25 PROMPT PAYMENT (JUL 2013)

I. 61 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (JUL 2013)... 25

I. 62 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

I. 63 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

I. 64 52.233-1 I DISPUTES (MAY 2014)--ALTERNATE I (DEC 1991)

I. 65 52.233-3 PROTEST AFTER AWARD (AUG 1996)

I. 66 52.233-3 I PROTEST AFTER AWARD (AUG 1996)--ALTERNATE I (JUN 1985)

I. 67 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

I. 68 52.239-1 PRIVACY OR SECURITY SAFEGUARDS (AUG 1996)

I. 69 52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)

I. 70 52.242-3 PENALTIES FOR UNALLOWABLE COSTS (MAY 2014)

I. 71 52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)

I. 72 52.242-13 BANKRUPTCY (JUL 1995)

I. 73 52.243-1 I CHANGES--FIXED-PRICE (AUG 1987)--ALTERNATE I (APR 1984)

I. 74 52.243-2 I CHANGES--COST-REIMBURSEMENT (AUG 1987)--ALTERNATE I (APR 1984)

I. 75 52.244-2 I SUBCONTRACTS (OCT 2010)--ALTERNATE I (JUN 2007)

I. 76 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)

I. 77 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (FEB 2016)

I. 78 52.246-25 LIMITATION OF LIABILITY--SERVICES (FEB 1997)

I. 79 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)

I. 80 52.249-6 TERMINATION (COST-REIMBURSEMENT) (MAY 2004)

I. 81 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

I. 82 52.249-14 EXCUSABLE DELAYS (APR 1984)

I. 83 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

I. 84 3452.208-72 PAPERWORK REDUCTION ACT (MAY 2011)

I. 85 3452.224-72 RESEARCH ACTIVITIES INVOLVING HUMAN SUBJECTS (MAY 2011)

I. 86 3452.242-70 LITIGATION AND CLAIMS (MAY 2011)

I. 87 3452.242-73 ACCESSIBILITY OF MEETINGS, CONFERENCES, AND SEMINARS TO PERSONS WITH

DISABILITIES (MAY 2011)

I. 88 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

I. 89 52.217-9 OPTION TO EXTEND THE TERM OF THE CONTRACT (MAR 2000)

I. 90 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

PAGE 5 OF 88 ED-IES-16-R-0014

SECTION J LIST OF ATTACHMENTS

J. 1 309-1a LIST OF ATTACHMENTS (APRIL 1984)

J. 2 Performance Work Statement

SECTION K REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS

K. 1 52.203-11 CERTIFICATION AND DISCLOSURE REGARDING PAYMENTS TO INFLUENCE CERTAIN FEDERAL

TRANSACTIONS (SEP 2007)

K. 2 52.204-5 WOMEN-OWNED BUSINESS (OTHER THAN SMALL BUSINESS) (OCT 2014)

K. 3 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014)

K. 4 52.215-6 PLACE OF PERFORMANCE (OCT 1997)

K. 5 52.222-22 PREVIOUS CONTRACTS AND COMPLIANCE REPORTS (FEB 1999)

K. 6 52.222-25 AFFIRMATIVE ACTION COMPLIANCE (APR 1984)

K. 7 52.222-26 EQUAL OPPORTUNITY (APR 2015)

K. 8 52.222-38 COMPLIANCE WITH VETERANS` EMPLOYMENT REPORTING REQUIREMENTS (FEB 2016)

K. 9 52.225-20 PROHIBITION ON CONDUCTING RESTRICTED BUSINESS OERATIONS IN SUDAN--CERTIFICATION

(AUG 2009)

K. 10 52.225-25 PROHIBITION ON CONTRACTING WITH ENTITIES ENGAGING IN CERTAIN ACTIVITIES OR

TRANSACTIONS RELATING TO IRAN--REPRESENTATION AND CERTIFICATIONS (OCT 2015)

K. 11 3452.227-72 USE AND NON-DISCLOSURE AGREEMENT (MAY 2011)

K. 12 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (APR 2016)

K. 13 52.209-5 CERTIFICATION REGARDING RESPONSIBILITY MATTERS (OCT 2015)

K. 14 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

K. 15 52.219-1 SMALL BUSINESS PROGRAM REPRESENTATIONS (OCT 2014)

K. 16 52.230-1 COST ACCOUNTING STANDARDS NOTICES AND CERTIFICATION (OCT 2015)

K. 17 52.230-7 PROPOSAL DISCLOSURE -- COST ACCOUNTING PRACTICE CHANGES (APR 2005)

K. 18 3452.209-70 CONFLICT OF INTEREST CERTIFICATION (MAY 2011)

K. 19 310-9 APPROVAL OF ACCOUNTING SYSTEM (MARCH 1985)

K. 20 310-10 GENERAL FINANCIAL AND ORGANIZATIONAL INFORMATION (APRIL 1984)

SECTION L INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

L. 1 52.204-7 SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

L. 2 52.215-1 I INSTRUCTIONS TO OFFERORS--COMPETITIVE ACQUISITION (JAN 2004)--ALTERNATE I (OCT

1997)

L. 3 Instructions to Offerors

L. 4 52.215-16 FACILITIES CAPITAL COST OF MONEY (JUN 2003)

L. 5 52.215-20 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER THAN CERTIFIED COST

OR PRICING DATA (OCT 2010)

L. 6 52.215-22 LIMITATIONS ON PASS-THROUGH CHARGES -- IDENTIFICATION OF SUBCONTRACT EFFORT (OCT

2009)

L. 7 52.216-1 TYPE OF CONTRACT (APR 1984)

L. 8 52.233-2 SERVICE OF PROTEST (SEP 2006)

L. 9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)

L. 10 3452.239-71 Department Security Requirements

SECTION M EVALUATION FACTORS FOR AWARD

M. 1 52.217-5 EVALUATION OF OPTIONS (JUL 1990)

M. 2 Evaluation Factors for Award

PAGE 6 OF 88 ED-IES-16-R-0014

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

B. 1 Contract Value, Period of Perf., and Line Items

PAGE 7 OF 88 ED-IES-16-R-0014

Contract Value & Period of Performance Version Date:

Period of Perf. Fixed Price CR Fee on CR Total Fixed Price CR Fee on CR Total Base Period Baseline Tasks 9/30/16 - 9/29/17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Base Period Optional Tasks 9/30/16 - 9/29/17 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Opt. Period 1 Baseline Tasks 9/30/17 - 9/29/18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Opt. Period 1 Optional Tasks 9/30/17 - 9/29/18 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Opt. Period 2 Baseline Tasks 9/30/18 - 9/29/19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Opt. Period 2 Optional Tasks 9/30/18 - 9/29/19 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Opt. Period 3 Baseline Tasks 9/30/19 - 9/29/20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Opt. Period 3 Optional Tasks 9/30/19 - 9/29/20 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Opt. Period 4 Baseline Tasks 9/30/20 - 9/29/21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Opt. Period 4 Optional Tasks 9/30/20 - 9/29/21 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00

Total: $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 Total: $0.00 $0.00 $0.00 $0.00

Total Value (including unexercised options) Funded Value (including unexercised options)

$0.00 $0.00

This is a "Cost Plus Fixed Fee" contract. In the chart above, "Fixed Price" refers to the Firm Fixed Price work, "CR" refers to the Cost Reimbursement work (not including fixed fee), and "Fee on CR" refers to the fixed fee to be paid on CR work proposed.

PAGE 8 OF 88 ED-IES-16-R-0014

Line Items: ED-IES-16-R-0014 Fixed Fee on CR:

Version Date:

Line Item # Line Item Name Amount Base Period Baseline Tasks (Firm Fixed Price) Base Period Baseline Tasks (Cost Reimbursement, excluding Fee on CR) Total Basline:

Base Period Baseline Tasks (Fee on CR) $0.00 $0.00 Base Period Optional Task 11 (Firm Fixed Price) Total Options:

Base Period Optional Task 12 (Firm Fixed Price) $0.00 Base Period Optional Task 13 (Cost Reimbursement, excluding Fee on CR) Total:

Base Period Optional Task 13 (Fee on CR) $0.00 $0.00 Option Period 1 Baseline Tasks (Firm Fixed Price) Option Period 1 Baseline Tasks (Cost Reimbursement, excluding Fee on CR) Total Basline:

Option Period 1 Baseline Tasks (Fee on CR) $0.00 $0.00 Option Period 1 Optional Task 11 (Firm Fixed Price) Total Options:

Option Period 1 Optional Task 12 (Firm Fixed Price) $0.00 Option Period 1 Optional Task 13 (Cost Reimbursement, excluding Fee on CR) Total:

Option Period 1 Optional Task 13 (Fee on CR) $0.00 $0.00 Option Period 2 Baseline Tasks (Firm Fixed Price) Option Period 2 Baseline Tasks (Cost Reimbursement, excluding Fee on CR) Total Basline:

Option Period 2 Baseline Tasks (Fee on CR) $0.00 $0.00 Option Period 2 Optional Task 11 (Firm Fixed Price) Total Options:

Option Period 2 Optional Task 12 (Firm Fixed Price) $0.00 Option Period 2 Optional Task 13 (Cost Reimbursement, excluding Fee on CR) Total:

Option Period 2 Optional Task 13 (Fee on CR) $0.00 $0.00 Option Period 3 Baseline Tasks (Firm Fixed Price) Option Period 3 Baseline Tasks (Cost Reimbursement, excluding Fee on CR) Total Basline:

Option Period 3 Baseline Tasks (Fee on CR) $0.00 $0.00 Option Period 3 Optional Task 11 (Firm Fixed Price) Total Options:

Option Period 3 Optional Task 12 (Firm Fixed Price) $0.00 Option Period 3 Optional Task 13 (Cost Reimbursement, excluding Fee on CR) Total:

Option Period 3 Optional Task 13 (Fee on CR) $0.00 $0.00 Option Period 4 Baseline Tasks (Firm Fixed Price) Option Period 4 Baseline Tasks (Cost Reimbursement, excluding Fee on CR) Total Basline:

Option Period 4 Baseline Tasks (Fee on CR) $0.00 $0.00 Option Period 4 Optional Task 11 (Firm Fixed Price) Total Options:

Option Period 4 Optional Task 12 (Firm Fixed Price) $0.00 Option Period 4 Optional Task 13 (Cost Reimbursement, excluding Fee on CR) Total:

Option Period 4 Optional Task 13 (Fee on CR) $0.00 $0.00

Baseline Tasks FFP: $0.00 Baseline Tasks CR: $0.00

Baseline Tasks Fee on CR: $0.00

TOTAL BASELINE TASKS: $0.00

Optional Tasks FFP: $0.00 Optional Tasks CR: $0.00

Optional Tasks Fee on CR: $0.00

TOTAL OPTIONAL TASKS: $0.00

TOTAL CONTRACT VALUE: $0.00

PAGE 9 OF 88 ED-IES-16-R-0014

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

C. 1 302-2 SCOPE OF WORK (FEBRUARY 1985)

The contractor shall furnish all personnel, materials, services, and facilities necessary to perform the requirements set forth in the Statement of Work, ("Performance Work Statement," attached) .

This shall also be done in accordance with the specified General and Special Provisions and the contractor's final technical proposal, which are hereby incorporated by reference as a part of the contract.

PAGE 10 OF 88 ED-IES-16-R-0014

SECTION E

INSPECTION AND ACCEPTANCE

E. 1 52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)

(Reference 52.246-4)

E. 2 52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)

(Reference 52.246-5)

PAGE 11 OF 88 ED-IES-16-R-0014

SECTION F

DELIVERIES OR PERFORMANCE

F. 1 52.242-15 STOP-WORK ORDER (AUG 1989)

(Reference 52.242-15)

F. 2 52.242-15 I STOP-WORK ORDER (AUG 1989)--ALTERNATE I (APR 1984)

(Reference 52.242-15 I)

F. 3 305-4 PERIOD OF PERFORMANCE (MARCH 1986)

The period of performance shall be from the dates set forth in the clause titled "Contract Value, Period of Performance, and Line Items" to , inclusive of all specified deliveries and/or task work.

PAGE 12 OF 88 ED-IES-16-R-0014

SECTION G

CONTRACT ADMINISTRATION DATA

G. 1 3452.201-70 CONTRACTING OFFICER`s REPRESENTATIVE (COR) (MAY 2011)

(a) The Contracting Officer`s Representative (COR) is responsible for the technical aspects of the project, technical liaison with the contractor, and any other responsibilities that are specified in the contract. These responsibilities include inspecting all deliverables, including reports, and recommending acceptance or rejection to the contracting officer.

(b) The COR is not authorized to make any commitments or otherwise obligate the Government or authorize any changes that affect the contract price, terms, or conditions. Any contractor requests for changes shall be submitted in writing directly to the contracting officer or through the COR. No such changes shall be made without the written authorization of the contracting officer.

(c) The COR`s name and contact information: (To be inserted at time of award)

(d) The COR may be changed by the Government at any time, but notification of the change, including the name and address of the successor COR, will be provided to the contractor by the contracting officer in writing.

(End of Clause)

G. 2 306-1b Invoice and Contract Financing Requests Submission - IPP (December 2013)

(a) Payments shall be rendered in accordance with the identified payment schedule(s), and any other incorporated payment clause(s), specified rates, and/or fixed price amounts.

(b) The contractor shall submit invoices electronically by means of the web-based system, Invoice Processing Platform (IPP) that can be accessed at: http://www.ipp.gov/. All submitted invoices must be accompanied by supporting documentation in accordance with the contract's terms and conditions. The supporting documentation shall be submitted in the following formats: Adobe Acrobat (pdf), Microsoft Word (doc), Pictures (jpeg), Microsoft Excel (excel), and Microsoft Outlook message (msg).

(c) Invoice Number Format - The format for the invoice shall be the contract number followed by the invoice number. The invoice number shall have no spaces, dashes, or other special characters. The invoice number cannot exceed 21 characters. Examples of acceptable invoice number formats are as follows:

Example 1, Definitive Contract:

Contract Number: ED-ABC-13-C-1234 Contractor's Invoice No.: 15897126341 IPP Invoice No.: EDABC13C1234158971263 (Note that the "-" characters were removed due to the requirement of not having special characters and the last two digits ["41"] from the contractor's invoice number were removed due to the 21 character limitation)

Example 2, Task/Delivery Order Contract:

Contract Number: ED-CDE-13-A-4567/0001 Contractor's Invoice No.: 158971263 IPP Invoice No.: EDCDE13A4567000115897 (Note that the "/" and "-" characters were removed due to the requirement of not having special characters and the last four digits ["1263"] from the contractor's invoice number were removed due to the 21 character limitation)

(d) If the Contractor has not already established an IPP account that is active, an IPP account will be automatically created on behalf of the Contractor. The automatically created IPP account will be issued to the Designated Primary Administrator, which will be the individual that has been identified in the "Accounts Receivable POC" Section of the Contractor's System for Award Management (SAM) registration located at https://www.sam.gov/portal/public/SAM/.

(e) Within ten (10) business days of the Contractor entering or updating the Accounts Receivable POC information within the Contractor's SAM registration, the Designated Primary Administrator will receive an email from the IPP Customer Support Team containing the Designated Primary Administrator's IPP username. Within 24 hours of receiving the initial email, the Designated Primary Administrator will receive a second email containing their IPP password. Once both emails have been received, the Designated Primary Administrator must log into IPP and complete the registration process.

PAGE 13 OF 88 ED-IES-16-R-0014

(f) The Contractor's Designated Primary Administrator will be authorized to further designate other administrators under the Contractor's IPP account who may submit invoices on behalf of the Contractor.

(g) The Contractor must ensure that the "Accounts Receivable POC" Section of its SAM registration is accurate and up to date.

(h) In the event that an invoice is rejected, the contractor shall make the necessary corrections and resubmit the invoice by means of IPP. Any questions, concerns, or issues regarding the use of IPP should be directed to IPP Customer Support Team, as identified at http://www.ipp.gov/

G. 3 306-8 CONTRACT ADMINISTRATOR (FEB 1985)

The Contractor shall designate one individual to be contacted during the period of the contract for prompt contract administration.

TO BE FILLED IN AT TIME OF AWARD

G. 4 306-9 PROVISIONAL AND NEGOTIATED FINAL OVERHEAD RATES (OCTOBER 1993)

(a) Pending the establishment of final indirect cost rates, as required by the clause entitled "Allowable Cost and Payment" FAR 52.216-7, the Contractor shall be reimbursed for its indirect costs on the basis of the negotiated provisional, or billing, rates as set forth below. Those rates shall remain in effect until the contract is modified to incorporate either negotiated final indirect rates, as directed by either paragraph (d) or (f) of the same clause, as applicable, or revised provisional indirect cost rates, as explained in paragraph (e).

(b) The provisional overhead rate(s) applicable to this contract:

TO BE FILLED IN AT TIME OF AWARD

PAGE 14 OF 88 ED-IES-16-R-0014

SECTION H

SPECIAL CONTRACT REQUIREMENTS

H. 1 3452.202-1 DEFINITIONS--DEPARTMENT OF EDUCATION (MAY 2011)

(Reference 3452.202-1)

H. 2 3452.208-71 PRINTING (MAY 2011)

(Reference 3452.208-71)

H. 3 3452.208-72 PAPERWORK REDUCTION ACT (MAY 2011)

(Reference 3452.208-72)

H. 4 3452.209-71 CONFLICT OF INTEREST (MAY 2011)

(Reference 3452.209-71)

H. 5 3452.215-70 RELEASE OF RESTRICTED DATA (MAY 2011)

(Reference 3452.215-70)

H. 6 3452.224-70 RELEASE OF INFORMATION UNDER THE FREEDOM OF INFORMATION ACT (MAY 2011)

(Reference 3452.224-70)

H. 7 3452.224-71 NOTICE ABOUT RESEARCH ACTIVITIES INVOLVING HUMAN SUBJECTS (MAY 2011)

(Reference 3452.224-71)

H. 8 3452.227-71 ADVERTISING OF AWARDS (MAY 2011)

(Reference 3452.227-71)

H. 9 3452.227-72 USE AND NON-DISCLOSURE AGREEMENT (MAY 2011)

(Reference 3452.227-72)

H. 10 3452.227-73 LIMITATIONS ON THE USE OR DISCLOSURE OF GOVERNMENT-FURNISHED INFORMATION MARKED

WITH RESTRICTIVE LEGENDS (MAY 2011)

(Reference 3452.227-73)

H. 11 3452.228-70 REQUIRED INSURANCE (MAY 2011)

(Reference 3452.228-70)

H. 12 3452.237-70 SERVICES OF CONSULTANTS (MAY 2011)

(Reference 3452.237-70)

H. 13 3452.237-71 OBSERVANCE OF ADMINISTRATIVE CLOSURES (MAY 2011)

(Reference 3452.237-71)

PAGE 15 OF 88 ED-IES-16-R-0014

H. 14 EDAR 3452.237-71 (Holidays) Addendum

Addendum to EDAR 3452.237-71

The following holidays are classified by the Office of Personnel and Management as Federal Holidays.

New Year’s Day Birthday of Martin Luther King, Jr.

Washington’s Birthday Memorial Day Independence Day Labor Day Columbus Day Veterans Day Thanksgiving Day Christmas Day

H. 15 3452.242-70 LITIGATION AND CLAIMS (MAY 2011)

PAGE 16 OF 88 ED-IES-16-R-0014

(Reference 3452.242-70)

H. 16 3452.242-71 NOTICE TO THE GOVERNMENT OF DELAYS (MAY 2011)

(Reference 3452.242-71)

H. 17 3452.242-73 ACCESSIBILITY OF MEETINGS, CONFERENCES, AND SEMINARS TO PERSONS WITH DISABILITIES

(MAY 2011)

(Reference 3452.242-73)

H. 18 3452.247-70 FOREIGN TRAVEL (MAY 2011)

(Reference 3452.247-70)

H. 19 3452.227-70 PUBLICATION AND PUBLICITY (MAY 2011)

(a) Unless otherwise specified in this contract, the contractor is encouraged to publish and otherwise promote the results of its work under this contract. A copy of each article or work submitted by the contractor for publication shall be promptly sent to the contracting officer`s representative. The contractor shall also inform the representative when the article or work is published and furnish a copy in the published form.

(b) The contractor shall acknowledge the support of the Department of Education in publicizing the work under this contract in any medium. This acknowledgement shall read substantially as follows:

"This project has been funded at least in part with Federal funds from the U.S. Department of Education under contract number TBD The content of this publication does not necessarily reflect the views or policies of the U.S. Department of Education nor does mention of trade names, commercial products, or organizations imply endorsement by the U.S. Government."

H. 20 3452.239-72 Department Security Requirements

PAGE 17 OF 88 ED-IES-16-R-0014

EDAR 3452.239-72 Department Security Requirements (MAY 2011)

(a) The contractor and its subcontractors shall comply with Department security policy requirements as set forth in the ‘‘Bidder’s Security Package: Security Requirements for Contractors Doing Business with the Department of Education’’ at http://www.ed.gov/fund/contract/about/bsp.html.

(b) The following are the contractor employee positions required under this contract and their designated risk levels:

High Risk (HR): NONE Moderate Risk (MR): NONE Low Risk (LR):

Personnel Position Job Description Risk Level

Project Director - Leads the managerial team in planning, conducting, monitoring, and evaluating the work. Has no access to sensitive but unclassified or Privacy Act protected information.

Low Risk

Senior Researchers - Leads specific tasks in planning, conducting, monitoring, and evaluating the work. Has no access to sensitive but unclassified or Privacy Act protected information.

Low Risk

Senior Administrator - Provides administrative support to the Project Director. Has no access to sensitive but unclassified or Privacy Act protected information.

Low Risk

Research Associates and Research Analysts - Assists in the identification of interventions and reviews studies using study review guide. Has no access sensitive but unclassified or Privacy Act protected information.

Low Risk

Senior Programmer - Develops programming language for web-based posting of research documentation and products. Has no access to sensitive but unclassified or Privacy Act protected information.

Low Risk

Editor - Edits and supervises the production of major deliverables. Has no access to sensitive but unclassified or Privacy Act protected information.

Low Risk

Clerical - Carries out administrative work. Has no access to sensitive but unclassified or Privacy Act protected information.

Low Risk

(a) All contractor employees must undergo personnel security screening if they will be employed for 30 days or more, in accordance with Departmental Directive OM:5–101, ‘‘Contractor Employee Personnel Security Screenings.’’ The type of screening and the timing of the screening will depend upon the nature of the contractor position, the type of data to be accessed, and the type of information technology (IT) system access required. Personnel security screenings will be commensurate with the risk and magnitude of harm the individual could cause.

(b) The contractor shall –

1) Ensure that all non-U.S. citizen contractor employees are lawful permanent residents of the United States or have appropriate work authorization documents as required by the Department of Homeland Security, Bureau of Immigration and Appeals, to work in the United States.

2) Ensure that no employees are assigned to high risk designated positions prior to a completed preliminary screening.

3) Submit all required personnel security forms to the contracting officer’s representative (COR) within 24 hours of an assignment to a Department contract and ensure that the forms are complete.

4) Ensure that no contractor employee is placed in a higher risk position than that for which he or she was previously approved, without the approval of the contracting officer or the COR, the Department personnel security officer, and the Department computer security officer.

5) Ensure that all contractor employees occupying high-risk designated positions submit forms for reinvestigation every five years for the duration of the contract or if there is a break in service to a Department contract of 365 days or more.

6) Report to the COR all instances of individuals seeking to obtain unauthorized access to any departmental IT system, or sensitive but unclassified and/or Privacy Act protected information.

7) Report to the COR any information that raises an issue as to whether a contractor employee’s eligibility for continued employment or access to Department IT systems, or sensitive but unclassified and/or Privacy Act protected information, promotes the efficiency of the service or violates the public trust.

8) Withdraw from consideration under the contract any employee receiving an unfavorable adjudication determination.

9) Officially notify each contractor employee if he or she will no longer work on a Department contract.

10) Abide by the requirements in Departmental Directive OM:5–101, ‘‘Contractor Employee Personnel Security

Screenings.’’

(c) Further information including definitions of terms used in this clause and a list of required investigative forms for each risk designation are contained in Departmental Directive OM:5–101, ‘‘Contractor Employee Personnel Security Screenings’’ available at the Web site listed in the first paragraph of this clause.

(d) Failure to comply with the contractor personnel security requirements may result in a termination of the contract for default.

H. 21 3452.243-70 KEY PERSONNEL (MAY 2011)

PAGE 18 OF 88 ED-IES-16-R-0014

(a) The personnel designated as key personnel in this contract are considered to be essential to the work being performed hereunder. Prior to diverting any of the specified individuals to other programs, or otherwise substituting any other personnel for specified personnel, the contractor shall notify the contracting officer reasonably in advance and shall submit justification (including proposed substitutions) in sufficient detail to permit evaluation of the impact on the contract effort. No diversion or substitution shall be made by the contractor without written consent of the contracting officer; provided, that the contracting officer may ratify a diversion or substitution in writing and that ratification shall constitute the consent of the contracting officer required by this clause. The contract shall be modified to reflect the addition or deletion of key personnel.

(b) The following personnel have been identified as Key Personnel in the performance of this contract:

Labor Category Name

TBD TBD

H. 22 31.205.71 TRAVEL COSTS

No invitational travel (defined as: Official government travel conducted by a non-federal employee in order to provide a "direct service" [i.e. presenting on a topic, serving as a facilitator, serving on a Federal Advisory Committee Act, or advising in an area of expertise] to the government) may be provided under this contract or in association with this contract unless consent is provided below. The cost of invitational travel under this contract is unallowable unless the contractor receives written consent from the Contracting Officer prior to the incurrence of the cost. If the contractor wishes to be reimbursed for a cost related to invitational travel, it must make a request in writing at least 21 days prior to the day that costs would be incurred. The contractor shall include in its request the following: why the invitational travel cost is integral to fulfill a government requirement in the contract, and the proposed cost that must be in accordance with federal travel regulations . The lack of a timely response from the Contracting Officer shall not constitute constructive acceptance of the allowability of the proposed charge. Consent is hereby given to the contractor to travel in accordance with the contractor's final technical and business proposals .

H. 23 307-19 REDACTED PROPOSALS (DECEMBER 1998)

The contractor shall provide a redacted copy of its successful technical proposal to the Contracting Officer within five (5) days after contract award. The redacted proposal shall be suitable for release by the Government under a Freedom of Information Act (FOIA) request. The redacted proposal shall be submitted in an electronic format that is readable by Microsoft Office applications.

H. 24 313.237-72 CLEARANCE OF CONFERENCES/MEETINGS (FEBRUARY 2015):

Any hotel/venue contract that the Contractor negotiates must be reviewed by and receive concurrence from a Conference Policy and Operations Team member prior to final agreement. All hotel/venue contracts shall be submitted electronically via email to the cognizant Contracting Officer's Representative, with a carbon copy to the Contracting Officer, who will ensure Conference Policy and Operations reviews the contract.

Complimentary Items "Comps": The Contractor does not have authority to negotiate or accept room upgrades for Department or Contractor staff. However, the Contractor is authorized to exercise its best efforts to obtain other Comps of necessary items/services that the Department would otherwise seek to procure in furtherance of the conference/meeting (i.e., meeting rooms, sleeping rooms, audio-visual equipment, etc.) Dual Compensation: Contractors are prohibited from receiving compensation from both the Department and any other source for conference planning performed pursuant to the terms of this Contract. If the Contractor receives any compensation from another source as a result of conference services performed for the Department, the Contractor shall report this compensation to the Contracting Officer and offset its invoice to the Department in an equal amount.

H. 25 316-1 ACCESSIBILITY OF SOFTWARE (OCTOBER 1999)

The Department of Education (ED) considers universal

PAGE 19 OF 88 ED-IES-16-R-0014

accessibility to information a priority for all its employees and external customers, including individuals with disabilities.

Under Sections 504 and 508 of the Rehabilitation Act of 1973

(29 U.S.C. sections 794 and 794d,as amended), ED must ensure the accessibility of its programs and activities, specifically its obligation to acquire and use accessible electronic and information technology. ED maintains the manual, "Requirements for Accessible Software Design," to convey the accessibility needs of the Department to the developers and suppliers of computer applications. To comply with the provisions of this clause, the contractor may use the edition of the ED manual

"Requirements for Accessible Software Design" in effect at the date of award of this contract or any more recent edition.

A copy of the most recent edition of the manual may be found at http://www.ed.gov/fund/contract/apply/clibrary/software.html

(a) Software delivered to or developed for ED--Except as provided in paragraph (b) or (c) of this clause, all software delivered to or developed for ED, under this contract, for use by ED's employees or external customers must meet all the requirements of the ED manual "Requirements for Accessible Software Design." However, in accordance with paragraph (c) of this clause, the contracting officer may waive a particular requirement of the ED Manual, provided that ED's use of the software will meet the requirements of Sections 504 and 508 of the Rehabilitation Act of 1973 (29 U.S.C. sections 794 and 794d, as amended).

(b) Software enhanced or modified for ED--Any enhancements and other modifications, made under this contract to software for use by ED's employees or external customers, are subject to the requirements of paragraph (a) of this clause, regardless of where or how the software was first developed. Except as otherwise specified elsewhere in the contract schedule, the contractor is only required to ensure that enhancements or modifications (not other, preexisting features or components) of the software fully comply with the accessibility requirements of paragraph (a).

However, the contractor is encouraged point out any preexisting features or components that do not meet accessibility requirements and to suggest solutions to ensure the software complies.

(c) Waiver of requirements--It is recognized that new technologies may provide solutions that are not envisioned in or consistent with the provisions of the manual "Requirements for Accessible Software Design." Also, compliance with certain requirements of the manual may not be feasible for the particular software required. In such extraordinary circumstances, the contracting officer may grant a waiver, in writing, to any requirement of the manual or of this clause if it furthers a public interest of ED and will not significantly

PAGE 20 OF 88 ED-IES-16-R-0014

impair ED's ability to ensure accessibility of its programs and activities to all its employees and external customers, including individuals with disabilities. To request a waiver, the contractor shall notify the contracting officer in writing, listing the specific accessibility requirements that would not be met and explaining how the accessibility of a particular feature can be achieved by alternative means or why it is not feasible to make a feature of the software accessible.

(d) Condition of payment--The contractor agrees that compliance with the provisions of this clause upon delivery of the software to ED is a condition of payment under this contract.

PAGE 21 OF 88 ED-IES-16-R-0014

SECTION I

CONTRACT CLAUSES

I. 1 52.202-1 DEFINITIONS (NOV 2013)

(Reference 52.202-1)

I. 2 52.203-3 GRATUITIES (APR 1984)

(Reference 52.203-3)

I. 3 52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(Reference 52.203-5)

I. 4 52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

(Reference 52.203-6)

I. 5 52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

(Reference 52.203-7)

I. 6 52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(Reference 52.203-8)

I. 7 52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(Reference 52.203-10)

I. 8 52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS (OCT 2010)

(Reference 52.203-12)

I. 9 52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (OCT 2015)

(Reference 52.203-13)

I. 10 52.203-17 CONTRACTOR EMPLOYEE WHISTLEBLOWER RIGHTS AND REQUIREMENT TO INFORM EMPLOYEES OF

WHISTLEBLOWER RIGHTS (APR 2014)

(Reference 52.203-17)

I. 11 52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT PAPER (MAY 2011)

(Reference 52.204-4)

I. 12 52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT AWARDS (OCT 2015)

(Reference 52.204-10)

I. 13 52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)

(Reference 52.204-13)

PAGE 22 OF 88 ED-IES-16-R-0014

I. 14 52.204-14 SERVICE CONTRACT REPORTING REQUIREMENTS (JAN 2014)

(Reference 52.204-14)

I. 15 52.209-6 PROTECTING THE GOVERNMENT`S INTEREST WHEN SUBCONTRACTING WITH CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT (OCT 2015)

(Reference 52.209-6)

I. 16 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (JULY 2013)

(Reference 52.209-9)

I. 17 52.210-1 MARKET RESEARCH (APR 2011)

(Reference 52.210-1)

I. 18 52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)

(Reference 52.215-2)

I. 19 52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(Reference 52.215-8)

I. 20 52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA (AUG 2011)

(Reference 52.215-10)

I. 21 52.215-11 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA--MODIFICATIONS (AUG 2011)

(Reference 52.215-11)

I. 22 52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (OCT 2010)

(Reference 52.215-12)

I. 23 52.215-13 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA--MODIFICATIONS (OCT 2010)

(Reference 52.215-13)

I. 24 52.215-22 LIMITATIONS ON PASS-THROUGH CHARGES -- IDENTIFICATION OF SUBCONTRACT EFFORT (OCT 2009)

(Reference 52.215-22)

I. 25 52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009)

(Reference 52.215-23)

I. 26 52.216-7 ALLOWABLE COST AND PAYMENT (JULY 2013)

(Reference 52.216-7)

PAGE 23 OF 88 ED-IES-16-R-0014

I. 27 52.216-8 FIXED FEE (JUN 2011)

(Reference 52.216-8)

I. 28 52.219-4 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS CONCERNS (OCT 2014)

(Reference 52.219-4)

I. 29 52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2014)

(Reference 52.219-8)

I. 30 52.219-9 II SMALL BUSINESS SUBCONTRACTING PLAN (OCT 2015)--ALTERNATE II (OCT 2001)

(Reference 52.219-9 II)

I. 31 52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)

(Reference 52.219-16)

I. 32 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REPRESENTATION (OCT 2014)

(Reference 52.219-28)

I. 33 52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)

(Reference 52.222-2)

(The following clause shall apply as prescribed in FAR 22.202.)

I. 34 52.222-3 CONVICT LABOR (JUN 2003)

(Reference 52.222-3)

I. 35 52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)

(Reference 52.222-21)

I. 36 52.222-26 EQUAL OPPORTUNITY (APR 2015)

(Reference 52.222-26)

(The following clause shall apply as prescribed in FAR 22.1308.)

I. 37 52.222-35 EQUAL OPPORTUNITY FOR VETERANS. [OCT 2015]

(Reference 52.222-35)

(The following clause shall apply as prescribed in FAR 22.1408.)

I. 38 52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

(Reference 52.222-36)

I. 39 52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)

(Reference 52.222-37)

PAGE 24 OF 88 ED-IES-16-R-0014

I. 40 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010)

(Reference 52.222-40)

I. 41 52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

(Reference 52.222-50)

I. 42 52.222-54 EMPLOYMENT ELIGIBILITY VERIFICATION (OCT 2015)

(Reference 52.222-54)

I. 43 52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

(Reference 52.223-6)

I. 44 52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE DRIVING (AUG 2011)

(Reference 52.223-18)

I. 45 52.224-1 PRIVACY ACT NOTIFICATION (APR 1984)

(Reference 52.224-1)

I. 46 52.224-2 PRIVACY ACT (APR 1984)

(Reference 52.224-2)

I. 47 52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

(Reference 52.225-13)

I. 48 52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

(Reference 52.227-1)

I. 49 52.227-17 RIGHTS IN DATA--SPECIAL WORKS (DEC 2007)

(Reference 52.227-17)

I. 50 52.228-7 INSURANCE--LIABILITY TO THIRD PERSONS (MAR 1996)

(Reference 52.228-7)

I. 51 52.229-3 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)

(Reference 52.229-3)

I. 52 52.230-2 COST ACCOUNTING STANDARDS (OCT 2015)

(Reference 52.230-2)

I. 53 52.230-3 DISCLOSURE AND CONSISTENCY OF COST ACCOUNTING PRACTICES (OCT 2015)

(Reference 52.230-3)

PAGE 25 OF 88 ED-IES-16-R-0014

I. 54 52.232-1 PAYMENTS (APR 1984)

(Reference 52.232-1)

(The following clause shall apply as prescribed in FAR 32.111(c)(2).)

I. 55 52.232-9 LIMITATION ON WITHHOLDING OF PAYMENTS (APR 1984)

(Reference 52.232-9)

I. 56 52.232-11 EXTRAS (APR 1984)

(Reference 52.232-11)

I. 57 52.232-17 INTEREST (MAY 2014)

(Reference 52.232-17)

I. 58 52.232-20 LIMITATION OF COST (APR 1984)

(Reference 52.232-20)

I. 59 52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

(Reference 52.232-23)

I. 60 52.232-25 PROMPT PAYMENT (JUL 2013)

(Reference 52.232-25)

I. 61 52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD MANAGEMENT (JUL 2013)

(Reference 52.232-33)

I. 62 52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUNE 2013)

(Reference 52.232-39)

I. 63 52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (DEC 2013)

(Reference 52.232-40)

I. 64 52.233-1 I DISPUTES (MAY 2014)--ALTERNATE I (DEC 1991)

(Reference 52.233-1 I)

I. 65 52.233-3 PROTEST AFTER AWARD (AUG 1996)

(Reference 52.233-3)

I. 66 52.233-3 I PROTEST AFTER AWARD (AUG 1996)--ALTERNATE I (JUN 1985)

(Reference 52.233-3 I)

I. 67 52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

PAGE 26 OF 88 ED-IES-16-R-0014

(Reference 52.233-4)

I. 68 52.239-1 PRIVACY OR SECURITY SAFEGUARDS (AUG 1996)

(Reference 52.239-1)

I. 69 52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)

(Reference 52.242-1)

I. 70 52.242-3 PENALTIES FOR UNALLOWABLE COSTS (MAY 2014)

(Reference 52.242-3)

I. 71 52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)

(Reference 52.242-4)

I. 72 52.242-13 BANKRUPTCY (JUL 1995)

(Reference 52.242-13)

I. 73 52.243-1 I CHANGES--FIXED-PRICE (AUG 1987)--ALTERNATE I (APR 1984)

(Reference 52.243-1 I)

I. 74 52.243-2 I CHANGES--COST-REIMBURSEMENT (AUG 1987)--ALTERNATE I (APR 1984)

(Reference 52.243-2 I)

I. 75 52.244-2 I SUBCONTRACTS (OCT 2010)--ALTERNATE I (JUN 2007)

(Reference 52.244-2 I)

I. 76 52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)

(Reference 52.244-5)

I. 77 52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (FEB 2016)

(Reference 52.244-6)

I. 78 52.246-25 LIMITATION OF LIABILITY--SERVICES (FEB 1997)

(Reference 52.246-25)

I. 79 52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR 2012)

(Reference 52.249-2)

I. 80 52.249-6 TERMINATION (COST-REIMBURSEMENT) (MAY 2004)

(Reference 52.249-6)

I. 81 52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)

PAGE 27 OF 88 ED-IES-16-R-0014

(Reference 52.249-8)

I. 82 52.249-14 EXCUSABLE DELAYS (APR 1984)

(Reference 52.249-14)

I. 83 52.253-1 COMPUTER GENERATED FORMS (JAN 1991)

(Reference 52.253-1)

I. 84 3452.208-72 PAPERWORK REDUCTION ACT (MAY 2011)

(Reference 3452.208-72)

I. 85 3452.224-72 RESEARCH ACTIVITIES INVOLVING HUMAN SUBJECTS (MAY 2011)

(Reference 3452.224-72)

I. 86 3452.242-70 LITIGATION AND CLAIMS (MAY 2011)

(Reference 3452.242-70)

I. 87 3452.242-73 ACCESSIBILITY OF MEETINGS, CONFERENCES, AND SEMINARS TO PERSONS WITH DISABILITIES

(MAY 2011)

(Reference 3452.242-73)

I. 88 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .