AttachmentI_TechnicalProposalWorksheet_12.xls

XLS spreadsheet 47 KB Posted

Attached to
2011-12 NATIONAL POSTSECONDARY STUDENT AID STUDY (NPSAS:12) Federal contract opportunity
Solicitation number
ED-IES-09-R-0015
Issued by
Department of Education Contracts and Acquisition Management

About this file

Attachment I - Worksheet for Technical Proposal

View the file

Other files for this federal contract opportunity

Other files attached to 2011-12 NATIONAL POSTSECONDARY STUDENT AID STUDY (NPSAS:12), newest first.
File Type Posted
AttachmentA_PWS 5-28-08.doc DOC document
AttachmentB_AwardFeeExhAB_12_revised 5-28-09.xls XLS spreadsheet
AttachmentF_AdditionalSecurityCompliance_12_pagenumbers.doc DOC document
AttachmentM_SmallBusinessSubcontractingPlan_12_pagenumbers.doc DOC document
RFP - NPSAS.pdf PDF
AttachmentE_Security_Procedures_12_pagenumbers.doc DOC document
Attachment N - Pricing Table.doc DOC document
AttachmentL_ContractorInformationForm_12_pagenumbers.doc DOC document
AttachmentD_WebDASspecs_12_pagenumbers.doc DOC document
AttachmentJ_BusinessProposalWorksheet_12_revised_5-28-09.xls XLS spreadsheet
AttachmentG_DataElements_12.xls XLS spreadsheet
AttachmentC_Billing_Instructions_12_pagenumbers.doc DOC document
Attachment O - Conflict of Interest Certification Form.doc DOC document
NPSAS Draft SOW 4-15-09.doc DOC document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHD

Attachment I RFP ED-09-R-0185
Worksheet for Technical Proposal for 2012 National Postsecondary Student Aid Study
As part of their technical proposal, offerors shall submit the information requested using the following format exactly. Numbers presented in this worksheet shall be the same as those used in an offeror's cost proposal. Offerors shall not provide cost information as part of this technical proposal worksheet. Answers provided on this worksheet will be used (in part) in evaluating offerors' technical proposals. Thus, this worksheet is intended primarily to assist the proposal evaluation panel in determining what is being proposed, including specific technical assumptions made by the offeror. However, it also serves as a guide to offerors to indicate the overall complexity of the project. Offerors not providing the information exactly as requested may be considered nonresponsive to this solicitation. Offerors shall list separately any additional products and services, following the last entry in the worksheet. Offerors shall submit this worksheet as an Excel spreadsheet on CD-ROM.
Base ContractOption 6 BPS:12/14Option 7 BPS:12/17TOTAL
Total person-days of Project Director time:
Percentage (100=full-time) of Project Director time during
Field test (data specification through collection):
Field test analysis through full-scale OMB clearance:
Full-scale collection:
Data Analysis System file construction:
Reporting:
TECHNICAL REVIEW PANEL FOR EACH COMPONENTBase ContractOption 6 BPS:12/14Option 7 BPS:12/17
Number of panel members:
Number of panel members from outside Washington DC area:
Number of meetings:
First meeting date (number of weeks from contract start):
Person-days for preparing materials:
Person-days for meetings (include panelists/consultants):
Person-days for attending and preparing meeting summaries:
Number of pages per review panel summary:
Number of periodic 2-page summaries (e.g., "Project Updates")
How frequently will these summaries be posted to the IMS?
INTEGRATED MONITORING SYSTEM
How will the following modules/submodules be linked? Circle or highlight such linkage type and include the page number(s) in the technical proposal that discusses the specific module. Will the modules be under IMS control through a direct link
(e.g., directly accesses company billing system), an indirect link (e.g., imported from output from SAS or SPSS, etc.) or not included. If a module is included as a direct link, indicate D; if included but through an indirect link, indicate I; if not included in the IMS, indicate N.
Type of
linkagePage number

in proposal

Project schedule:D I N
Technical Review Panel name, addresses, phone, etc.:D I N
Project costs by study (i.e., student survey and BPS options):D I N
Summary of project costs by task and subtask:D I N
Project documentation: including a logbook for activities & meeting summariesD I N
OMB clearance packages:D I N
How will the data elements identified in the OMB
package be linked to separate interview protocols for
the following:
Student Web/CATI:D I N
FIELD TEST MODULES
Institution selection:D I N
Locating/tracing institutions:D I N
Student sampling:D I N
BPS:12/14 (Option 6) sampling:D I N
BPS:12/17 (Option 7) sampling:D I N
Locating/tracing students:D I N
Locating/tracing BPS students (Options 6 and 7):D I N
Field test institutional records CADE:D I N
Field test student web/CATI:D I N
Field test BPS students web/CATI (Options 6 and 7):D I N
Type of
linkagePage number

in proposal

FULL SCALE MODULES
Institution selection:D I N
Locating/tracing institutions:D I N
Student sampling:D I N
BPS sampling (Options 6 and 7):D I N
Locating/tracing students:D I N
Locating/tracing BPS students (Options 6 and 7):D I N
Full scale institutional records CADE:D I N
Full scale student web/CATI:D I N
Full scale BPS students CATI (Options 6 and 7):D I N
Routine status/yield reporting:D I N
Electronic codebook generation for each major component:D I N
DAS file construction:D I N
DAS data sets:D I N
Data library:D I N
Including input files needed for data analysis systems:D I N
Frequency of IMS routine reports:
Will the COR have remote access to IMS?Yes/No
Will the IMS be PC based?Yes/No
if yes,
Will a copy be provided for COR's PC?Yes/No
if yes, how often will it be updated?
Number of OMB clearance packages to be prepared:
Number of pages per package:
Total number of copies of the final clearance packages (including contractor
staff, copies of submitted to NCES, plus any extra copies):
Will the first package for student component include request for clearance for the
the web-based student collection?Yes/No
Will each OMB package be revised for
COR comments?Yes/No
NCES managers comments?Yes/No
NCES interdivisional review comments?Yes/No
NCES forms clearance coordinator comments?Yes/No
RIMS comments?Yes/No
OMB comments?Yes/No
FIELD TESTBase ContractOption 6 BPS:12/14Option 7 BPS:12/17
Field Test sample
Number of institutions selected:
Total Number of mailings/etc. to schools: ( no. of mailings X no. of schools):
Number of institutions requiring locating/tracing:
Average operator time needed for tracing/locating these schools:
Final percentage yield for schools requiring tracing:
Average number of IMS/Locating module updates per institution:
Average number of minutes to convert institutional nonresponse:
Overall expected institution response rate (unweighted):
Number of pages in the institution coordinator training materials:
Number of sets of coordinator training manuals to be printed:
Number of institutions providing data electronically:
Total sample size from these schools:
Number of institutions to be visited by field data collector:
Total sample size from these schools:
Undergraduates (assuming no BPS options):
Undergraduates (assuming BPS options):
Graduate students:
First professional students:
Will COR receive preliminary data files and documentation?Yes/NoYes/NoYes/No
Will results be provided for a Review Panel meeting?Yes/NoYes/NoYes/No
Will Field Test Report be available before RIMS review of full scale OMB package?Yes/NoYes/NoYes/No
Anticipated number of drafts Field Test Report revisions needed from your first draft through camera-ready copy stage (enter a value from 2 through 10)?
Will the first draft of each report be submitted according to NCES Standards?Yes/NoYes/NoYes/No
FULL-SCALE STUDY:Base ContractOption 6 BPS:12/14Option 7 BPS:12/17
Number of institutions selected:
Number of mailings/etc.
Number of institutions requiring locating/tracing:
Average operator time needed for tracing/locating these schools:
Final percentage yield for school requiring tracing:
Average number of IMS/Locating module updates per institution:
Average number of minutes to convert institutional nonresponse:
Expected instituion response rate:
Number of CADE modules for institution coordinator training:
Number of pages in the institution coordinator training materials:
Number of sets of coordinator training manuals to be printed:
Total sample size:
Undergraduates :
BPS students (assuming BPS options):
Other undergraduates (assuming BPS options)
Graduate students:
First professional students:
CATI TRAININGBase ContractOption 6 BPS:12/14Option 7 BPS:12/17
CATI Training
Number of CATI supervisors:
Number of CATI supervisors (FTE):
Number of locations for CATI supervisor training:
Number of days of CATI supervisor training:
Total number of hours of CATI supervisor training:
Number of CATI interviewers:
Number of CATI interviewers: (FTE):
Number of locations for CATI interviewer training:
Number of days of CATI interviewer training:
Total number of hours of CATI interviewer training:
Number of pages in the CATI training manuals:
Number of training manuals to be printed:
CATI DEVELOPMENT AND PROGRAMMINGBase ContractOption 6 BPS:12/14Option 7 BPS:12/17
Number of Senior Staff hours:
Number of Development hours:
Number of Operations/Training hours:
Number of Programming hours:
WEB/CATI (DATA COLLECTION)Base ContractOption 6 BPS:12/14Option 7 BPS:12/17
Sample size
Locating/tracing
Number of mailings/etc.:
Percentage yield:
Percentage of sample requiring tracing:
Number in sample requiring tracing:
Average operator time needed for tracing:
Average number of ICS/Locating module
updates per respondent:
Number of preloaded data elements:
Number of consistency paths:
Number of time stamps:
Number of screens:
Total number of questions entered into web/CATI instrument:
Number of variables with alpha strings to be coded:
Total number of alpha values to be coded:
Number of interviewers:
Number of interviewers (FTE):
Average length of interview (in minutes):
Base ContractOption 6 BPS:12/14Option 7 BPS:12/17
Number responding via web (assume 50 percent of repondents)
Number of cases worked in CATI (web-based) for each component
Number of supervisors (during CATI):
Number of supervisor hours excluding training:
Number of supervisors (FTE):
Average length of interview (assume minimum of 35 minutes):
Number of CATI stations:
Expected response rate for CATI:
Number of re-interviews:
Number of different incentive levels to increase participation (explain after last row in table):
Expected unweighted response rate:
Lowest expected unweighted response rate in any sector:
Which sector do you anticipate will have the lowest unweighted response rate?
Expected overall weighted response rate:
Frequency of IMS routine reports during full-scale study:
Will COR receive preliminary data files and documentation?Yes/NoYes/NoYes/No
Will COR receive raw data and documentation on CD-ROM?Yes/NoYes/NoYes/No
Will raw data and documentation be available for COR from IMS download area?Yes/NoYes/NoYes/No
DATA LIBRARY FOR EACH COMPONENTBase ContractOption 6 BPS:12/14Option 7 BPS:12/17
Will the electronic codebooks developed for each component include
Variable labels:Yes/NoYes/NoYes/No
Codes and value labels:Yes/NoYes/NoYes/No
Unweighted frequencies/percents:Yes/NoYes/NoYes/No
Weighted frequencies/percents:Yes/NoYes/NoYes/No
Complete data element definition (prose):Yes/NoYes/NoYes/No
Exact item (screen) wording:Yes/NoYes/NoYes/No
SPSS(-PC+) code generation capacity:Yes/NoYes/NoYes/No
SAS(-PC) code generation capacity:Yes/NoYes/NoYes/No
Help for weighting, programming, nonresponse, design effects, etc.Yes/NoYes/NoYes/No
Will Data File User's Manual for each component be revised for
COR comments?Yes/NoYes/NoYes/No
NCES managers comments?Yes/NoYes/NoYes/No
NCES adjudication review comments?Yes/NoYes/NoYes/No
IES/Information Services comments?Yes/NoYes/NoYes/No
Base ContractOption 6 BPS:12/14Option 7 BPS:12/17
For the restricted-use base datafile (merged file of institution, student):
Number of weights to be constructed:
Number of BRR weights to be constructed:
Number of analysis strata to be constructed:
Number of analysis replicates to be constructed:
Number of variables to be imputed (enter a value from 15 to 500):
Method of imputation:
Number of composite variables to be constructed:
CD ROM delivery date (number of weeks from end of data collection):
FIRST LOOK/ DESCRIPTIVE REPORTS FOR EACH COMPONENTEACH COMPONENT
Will each deliverable be edited prior to delivery to COR to verify that all table titles, source notes and tables, graphs, figures are formatted according to NCES Standards?Yes/No
Anticipated number of drafts needed from your first draft through camera-ready copy stage of each deliverable [enter a value from 2 through 10]?
Will each First Look/ Descriptive report be revised for
COR comments?
NCES managers comments?
NCES adjudication review comments?
POC review comments?
IES Information Services comments?
For each First Look/Meth Report/Descriptive Report indicate theFirst Look reportMethodology ReportsDescriptive Reports
Number of Senior Staff person-days:
Number of Statistician person-days:
Number of Programmer person-days:
Number of Analyst person-days:
Number of Secretarial person-days:
Number of tables:
Number of graphs:
Total number of pages:
For special analyses and tabulations:
Number of data analysis system input files:
Average number of variables in each data analysis systems:
Number of Senior Staff person-days for all data analysis systems:
Number of Statistician person-days for all data analysis systems:
Number of Programmer person-days for all data analysis systems:
Number of special tabulations:
Average number of pages of prose per tabulation:
Average number of graphs per special analysis/tabulation:
Average number of pages per tabulation:
For each First Look/Meth Report/Descriptive Report indicate theFirst Look reportMethodology ReportsDescriptive Reports
Average number of Senior Staff person-days per tabulation:
Average number of Analyst person-days per tabulation:
Average number of Statistician person-days per tabulation:
Average number of Programmer person-days per tabulation:
Average number of Secretarial person-days per tabulation:
SMALL BUSINESS PARTNERS
Names of proposed small business partners:
General activity expected:
FTE effort expected:
Percentage of contract costs:
Other products or explanations of numbers provided in the worksheet:

&C&P of &N

File details come from the government source that posted it. Updated .