About this file

Drawings for ED9099-09-H-0020

View the file

Other files

File Type Posted
Am_0002.pdf PDF
Am_0001.pdf PDF
ED9099-09-H-0020.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

47032W2.dgn 7/10/2009 1:45:33 PM

BANK TIE-IN

NOTES:

1. ROCK DIKE CONSIST OF A 6’ CROWN AT AN ELEVATION

2. ALL DIKE TIE-INS SHALL BE PERPENDICULAR TO THE SHORELINE.

SHALL ALSO BE CONSTRUCTED ACCORDING TO THE

TYPICAL SECTIONS SHOWN ON SHEET 5.

OF 7.0’ M.L.G. WITH A 1 ON 2 SIDE SLOPES. ROCK BERMS

DIKE P.I. X- COORDINATE Y- COORDINATE

164+69.55

187+78.08

132+71.53

141+32.20

2,650,002.81 568,773.50

2,650,320.62 571,073.60

2,650,231.77 565,657.91

Safety is a Part of Your Contract

A DC

2,649,874.96 566,440.04

43 43

41 4040

4040 40

39 39

D I K

E

P I

C

L

S T

A

37 37

30 3030

30 30

2222 2221

NAVIGATION

LIGHT

NAVIGATION

LIGHT

C-02

A P

P R

O X

IM

A T

E M

IL

E

.7 T

O

C A

L C

A S

IE

U R

IV

E R A

N D P

A S

S

F O

R E

S H

O R

E P

R O

T E

C T

IO

N

A P

P R

O X

IM

A T

E M

IL

E

.0

P L

A N V

IE

W

B M

L

B M

L R

W B

K .J

O ’C

A

IN

A N

S I E

W P -0

-B -0

W P -0

-C

H -1

W .d g n

:1

C A

M E

R O

N A

N D C

A L

C A

S

IE

U P

A R

IS

H E

S L

O U

IS

IA

N A

J U

N

J U

N

BANK TIE-IN

BANK TIE-IN

AZ.4̂33’

CALCASIEU LAKE

P

A

AZ.4̂33’

NEW ORLEANS DISTRICT

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D A

T E

A P

P R fi

US Army Corps of Engineers

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N E

W O

R L E

A N

S D

IS

T R

IC

T

N E

W O

R L E

A N

S L

O U

IS

IA

N A

PROPOSED FORESHORE PROTECTION

CAMERON PARISH 600’0 300’

SCALE:1"=300’

P

A

X 2648315.350

Y 566582.210

X 2650374.520

Y 566372.840

M A

T

H

A T

IO

N

INCENTIVE

CLAUSES

E ER

I N

G

N I

G N

E

LA

V

UE

YOUR KEY TO

HIGHER PROFITS

N

REACH 1

OPTION REACH

P

A

GAS PIPELINE CROSSING

TO BE REMOVED

FROM THE CHANNEL

TEJAS GAS CORP.

C/L 1003+58 EL. -56.4

HILCORPS

6" GAS PIPELINE

TIE IN TO

EXISTING LINE

AREA 17

DISPOSAL

X=2,649,834.06

Y= 571,715.52

U P

P

R

M

O F

W

R K

A P

P R

O X

M

L

E

A P

P R

O

L

E

C

A

47032W3.dgn 7/10/2009 1:50:03 PM

BANK TIE-IN

NOTES:

DIKE P.I. X- COORDINATE Y- COORDINATE

55+96.24

65+56.20

66+50.31

74+59.44

75+55.85

82+29.37

114+29.08

121+37.41

132+71.53

141+31.20

2,649,137.84

2,649,919.14

2,650,013.02

2,649,993.45

558,961.88

559,515.59

559,509.02

560,317.91

2,649,897.29

2,649,404.88

560,324.64

560,784.17

2,649,717.21

2,650,153.73

563,968.60

564,526.43

2,650,231.77 565,657.91

Safety is a Part of Your Contract

A DC

2,649,874.96 566,440.04

44 40

P I

P

A

P I

P

A

P I

P I

36 34

22 22

NAVIGATION

LIGHT

NAVIGATION

LIGHT

NAVIGATION

LIGHT

NAVIGATION

LIGHT

6 6

4 4

3 3

2 2

CALCASIEU SHIP CHANNELAZ.4̂33’

AZ. 4̂33’

CALCASIEU LAKE

CAMERON PARISH

P

A

P I

D O

C K

NEW ORLEANS DISTRICT

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D A

T E

A P

P R fi

US Army Corps of Engineers

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N E

W O

R L E

A N

S D

IS

T R

IC

T

N E

W O

R L E

A N

S L

O U

IS

IA

N A

1. ROCK DIKE CONSIST OF A 6’ CROWN AT AN ELEVATION

2. ALL DIKE TIE-INS SHALL BE PERPENDICULAR TO THE SHORELINE.

SHALL ALSO BE CONSTRUCTED ACCORDING TO THE

TYPICAL SECTIONS SHOWN ON SHEET 5.

OF 7.0’ M.L.G. WITH A 1 ON 2 SIDE SLOPES. ROCK BERMS

600’0 300’

SCALE:1"=300’

PROTECTION

FORESHORE

PROPOSED

N

Y 566582.210

X 2648315.350

P I

INCENTIVE

CLAUSES

E ER

I N

G

N I

G N

E

LA

V

UE

YOUR KEY TO

HIGHER PROFITS

A P

P R

O X

IM

A T

E M

IL

E

.7 T

O

C A

L C

A S

IE

U R

IV

E R A

N D P

A S

S

F O

R E

S H

O R

E P

R O

T E

C T

IO

N

A P

P R

O X

IM

A T

E M

IL

E

.0

P L

A N V

IE

W

B M

L

B M

L R

W B

K .J

O ’C

A

IN

A N

S I E

W P -0

-B -0

W P -0

-C

H -1

M A

T

A T

IO

N

C-03

:1

M A

T

A T

IO

N

OPTION REACH

C A

M E

R O

N A

N D C

A L

C A

S

IE

U P

A R

IS

H E

S L

O U

IS

IA

N A

W .d g n

J U

N

J U

N

P

A

X 2650374.520

Y 566372.840

GAS PIPELINE CROSSING

TO BE REMOVED

FROM THE CHANNEL

TEJAS GAS CORP.

TIE IN TO EXISTING LINE

C/L 1003+58 EL. -56.4

HILCORPS

6" GAS PIPELINE

IT

G

E

N

A

V I

L

IG

D

C K

W R

T

E

N E R

Y

R P

IN

/L .0

G

DISPOSAL

AREA 22

AREA 17

DISPOSAL

X=2,648,739.80

Y= 560,409.29

A P

P R

O

L

E

C

A

A P

P R

O

L

E

C

A

47032W4.dgn 7/10/2009 10:51:48 AM

BANK TIE-IN

NOTES:

2. ALL DIKE TIE-INS SHALL BE PERPENDICULAR TO THE SHORELINE.

SHALL ALSO BE CONSTRUCTED ACCORDING TO THE

TYPICAL SECTIONS SHOWN ON SHEET 5.

OF 7.0’ M.L.G. WITH A 1 ON 2 SIDE SLOPES. ROCK BERMS

DIKE P.I. X- COORDINATE Y- COORDINATE

0+00

12+09.86

55+96.24

65+56.20

66+50.31

74+59.44

1. FORESHORE DIKE CONSIST OF A 6’ CROWN AT AN ELEVATION

75+55.85

82+29.37

2,648,417.55 553,359.70

2,648,704.84 554,599.24

2,649,137.84

2,649,919.14

2,650,013.02

2,649,993.45

558,961.88

559,515.59

559,509.02

560,317.91

2,649,897.29

2,649,404.88

560,324.64

560,784.17

Safety is a Part of Your Contract

A DC

INCENTIVE

CLAUSES

E ER

I N

G

N I

G N

E

LA

V

UE

YOUR KEY TO

HIGHER PROFITS

D I K

A

P I

P

A

P

A

P I

P I

P I

P I

31 31

30 30 27

21 21

20 19

4 4

4 4

3 3

3 3

3 2

2 2

2 2

PROPOSED FORESHORE PROTECTION

REACH 2

1 1

1 11

1 1

CALCASIEU SHIP CHANNEL

AZ. 4̂33’

CALCASIEU LAKE

CAMERON PARISH

M A

T

A T

IO

N

NEW ORLEANS DISTRICT

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N

C O

N T

R A

C T N

O

SHEET

IDENTIFICATION

D A

T E

A P

P R fi

US Army Corps of Engineers

U .S

A R

M Y C

O R

P S O

F E

N G

IN

E E

R S

N E

W O

R L E

A N

S D

IS

T R

IC

T

N E

W O

R L E

A N

S L

O U

IS

IA

N A

0 0

N

R W

B

T O A

P P

R O

X

IM

A T

E M

IL

E

.0

C A

L C

A S

IE

U R

IV

E R A

N D P

A S

S

F O

R E

S H

O R

E P

R O

T E

C T

IO

N

A P

P R

O X

IM

A T

E M

IL

E

.7

P L

A N V

IE

W

B M

L

B M

L

K .J

O ’C

A

IN

A N

S I E

W P -0

-B -0

W P -0

-C

H -1

-4

600’0 300’

SCALE:1"=300’

:1

C-04

C A

M E

R O

N A

N D C

A L

C A

S

IE

U P

A R

IS

H E

S L

O U

IS

IA

N A

W .d g n

J U

N

J U

N

W R

T

E

N E R

Y

R P

IN

/L

IT

E

A

V I

L

IG

D

C K

DISPOSAL

AREA 22

X=2,648,739.80

Y= 560,409.29

L O

W

M

R K

A P

P R

O

L

E

A P

P R

O

L

E

C

A

DISPOSAL

AREA 23

47032W5.dgn 7/10/2009 10:53:54 AM

1. ROCK BERMS SHALL BE CONSTRUCTED BEFORE

DIKE ELEVATION EXCEEDS +2.0 M.L.G.

2. ALL MATERIAL TAKEN FROM THE FLOTATION CHANNEL

DEPOSITED ON THE LAND SIDE OF THE ROCK DIKE.

1. ROCK BERMS SHALL BE CONSTRUCTED BEFORE

DIKE ELEVATION EXCEEDS +2.0 M.L.G.

2. ALL MATERIAL TAKEN FROM THE FLOTATION CHANNEL

DEPOSITED ON THE LAND SIDE OF THE ROCK DIKE.

7. All dike tie-ins shall be perpendicular to the shoreline.

8. All elevations are refereneced to MLG PRE-83 epoch.

AA

Existing ground surface

Ban k p av ing

10’

Tie into natural ground.

Dr es s ba nk a s re qu ire d

3’ Th ick

A DC

INCENTIVE

CLAUSES

E ER

I N

G

N I

G N

E

LA

V

UE

YOUR KEY TO

HIGHER PROFITS

Safety is a Part of Your Contract

3’ MINIMUM 3’ MINIMUM

GEOTEXTILE)

(SEPARATOR

3’ MINIMUM

GEOTEXTILE)

(SEPARATOR

3’ MINIMUM

GEOTEXTILE)

(REINFORCEMENT

NOTES:

3’ MINIMUM

(REINFORCEMENT

GEOTEXTILE)

3’ MINIMUM

GEOTEXTILE)

(SEPARATOR

3’ MINIMUM

GEOTEXTILE)

(SEPARATOR

3’ MINIMUM

GEOTEXTILE)

(REINFORCEMENT

3’ MINIMUM

(REINFORCEMENT

GEOTEXTILE)

3’ MINIMUM

GEOTEXTILE)

(SEPARATOR

3’ MINIMUM

GEOTEXTILE)

(SEPARATOR

3’ MINIMUM

GEOTEXTILE)

(REINFORCEMENT

NOTES:

(REINFORCEMENT

GEOTEXTILE)(460 lb/in)

DRESSED BANK

V o n

H

V o n

H

1V on 2H

1V on 2H

REPOSE OF EXISTING GROUND

F

T

3-FT THICK

ROCK BERM

CROWN ELEV. +7.0 MLG

25’

50’

TYPICAL TIE-IN TO BANKLINE

FORESHORE PROTECTION DIKE

PLAN VIEW

(Not To Scale)

Toe of Cut

SECTION B-B

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

US ARMY CORPS

OF ENGINEERS

NEW ORLEANS DISTRICT

SHEET

IDENTIFICATION

NUMBER

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

C O

R P

S O

F E

N G

IN

E E

R S

M

IS

S

IS

S

IP

P I

V A

L L E

Y D

IV

IS

IO

N

C A

L C

A S

IE

U R

IV

E R A

N D P

A S

S L

A

F O

R E

S H

O R

E D

IK

E C

O N

S T

R U

C T

IO

N

T O

D E

T A

IL

S

H E

E T

A N

S I E

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

K J O

M A

R

:1

R

IC

K B

R O

U S

S A

R D

H -1

-4

W .D

G N

W P -0

-B -0

J U

N E

C-05

C A

M E

R O

N A

N D C

A L

C A

S

IE

U P

A R

IS

H E

S L

A

A P

P R

O X

IM

A T

E M

IL

E

.8

B M

L

B M

L

A P

P R

O X

IM

A T

E M

IL

E

.0

DISPOSAL SIDECHANNEL SIDE

TYPICAL CORE SECTION

DISPOSAL SIDECHANNEL SIDE

APPROX. C/L STA. 164+69.55 to APPROX. C/L STA. 187+78.08

APPROX. C/L STA. 132+71.53 to APPROX. C/L STA. 74+59.44

DISPOSAL SIDECHANNEL SIDE

APPROX. C/L STA. 66+50.31 to APPROX. C/L STA. 0+00.00

TYPICAL FORESHORE SECTION - REACH 1

TYPICAL FORESHORE SECTION - REACH 2

TYPICAL FORESHORE SECTION - OPTION REACH

DIKECL

2H:

V

2H:

V

EL 7

MINIMUM 3’ COVER ARMOR STONE

EL -7.0

6 FEET

1H :1

V

3 FT

CORE SECTION

SEPARATOR GEOTEXTILE

2H: 1V

REINFORCEMENT GEOTEXTILE

FLOATATION CHANNEL/EARTHEN

BERM BORROW SOURCE

65’ FEET MINIMUM

30H: 1V

15 FEET

EL 3.5

20H: 1V

10 FEET

3 FT

MINIMUM 3’ COVER EARTHEN FILL

DIKECL

2H:

V

EL 7

MINIMUM 3’ COVER ARMOR STONE

EL -7.0

6 FEET

1H :1

V

CORE SECTION

SEPARATOR GEOTEXTILE

2H: 1V

REINFORCEMENT GEOTEXTILE

FLOATATION CHANNEL/EARTHEN

BERM BORROW SOURCE

50’ FEET MINIMUM

DIKECL

2H:

V

2H:

V

EL 7

MINIMUM 3’ COVER ARMOR STONE

EL -7.0

6 FEET

1H :1

V

3 FT

CORE SECTION

SEPARATOR GEOTEXTILE

2H: 1V

REINFORCEMENT GEOTEXTILE

FLOATATION CHANNEL/EARTHEN

BERM BORROW SOURCE

65’ FEET MINIMUM

10H: 1V

5 FEET

EL 3.5

20H: 1V

10 FEET

3 FT

MINIMUM 3’ COVER EARTHEN FILL

(UNCOMPACTED)

(UNCOMPACTED)

ARMOR STONE

EXISTING

GROUND SURFACE

SECTION

NOT TO SCALE

A

5’ MAX.

3’ MIN.

END DETAIL

CORE MATERIAL

EL.4.0+/- (MLG)

EL.7.0 MLG

ELEVATION

VARIES

CHANNEL SIDE

LAND SIDE

CORE MATERIAL

EL.4.0

4’

1V o n 2H 1V on 2H

EXISTING GROUND

C/L COMPOSITE CLOSURE

REINFORCEMENT GEOTEXTILE

WIDTH DETERMINED BY DESIGN SECTION

CHANNEL SIDE LAND SIDE

(NOT TO SCALE)

TYPICAL PLAN VIEW

(NOT TO SCALE)

north and south limits of dike, where the structure

Notes:

4. Bankline shall be dressed as required to assure acceptance of stone paving. Dress slope shall be no steeper than 1V on 2H.

and 25 feet landward of the dike C/L as shown on the plan drawings.

5. Bank paving shall be constructed and accepted prior to construction of dike tie-in.

6. Spoil material resulting from bank dressing shall be

3. Paving shall extend 50 feet channelward of the dike C/L, disposed of on overbank, or behind the stone dike alignment.

dike, where the structure ties into existing land.

2. Stone bank paving is required at the interior gap in the ties into existing land.

1. Stone bank tie-ins are required at both the

REQUIRED BANK TIE-INS

Dike C/L of bank

Top of bank paving

BB

Slope to Dress

Steepest

Allowable

CHANNEL SIDE

LAND SIDE

10’

Approx. top

1V on 3H

47032W6.dgn 7/23/2009 12:56:12 PM

NOTES:

1. ALL ELEVATIONS IN BOTH SECTION AND PROFILE

ARE M.L.G. PRE-83 EPOCH.

2. EXISTING GROUND ELEVATIONS WERE TAKEN

4. ROCK DIKE CONSIST OF A 6’ CROWN AT AN ELEVATION

OF THE DIKE, AT AN ELEVATION 3’ ABOVE THE NATURAL

5. BASELINE TRAVERSE INFORMATION IS AVAILABLE UPON

THE U.S. ARMY CORPS OF ENGINEERS.

REQUEST AT THE NEW ORLEANS DISTRICT OF

OF 7.0’ M.L.G. WITH A 1 ON 2 SIDE SLOPES. A BERM

SHALL ALSO BE CONSTRUCTED AT THE CHANNEL SIDE TOE

GROUND LINE AND AT A WIDTH ACCORDING TO THE TYPICAL

3. ALL P.I. & P.T. STATION NUMBERS REFLECT DIKE CENTERLINE.

FROM SURVEY TAKEN ON APR 2009.

SECTIONS SHOWN ON SHEET 5.

6. THE DIKE TIE-IN AT THE NORTHERN AND SOUTHERN

LIMITS OR WORK SHALL BE PERPENDICULAR TO THE

SHORELINE.

-5

-10

-15

E l e v a t i o n i n e t

L G

0 25 50 75 100-25-50-75-100

-5

-10

-15

E l e v a t i o n

L G

-5

-10

-15

E l e v a t i o n

G L

0 25 50 75 100-25-50-75-100

-5

-10

-15

E l e v a t i o n

G L

-5

-10

-15

E l e v a t i o n

L G

0 25 50 75 100-25-50-75-100

-5

-10

-15

E l e v a t i o n

L G

-5

-10

-15

E l e v a t i o n

G L

0 25 50 75 100-25-50-75-100

-5

-10

-15

E l e v a t i o n

G L

EARTHEN BERM

-5

-10

-15

E l e v a t i o n

L G

0 25 50 75 100-25-50-75-100

-5

-10

-15

E l e v a t i o n

L G

-5

-10

-15

E l e v a t i o n

G L

0 25 50 75 100-25-50-75-100

-5

-10

-15

E l e v a t i o n

G L

-5

-10

-15

E l e v a t i o n

L G

0 25 50 75 100-25-50-75-100

-5

-10

-15

E l e v a t i o n

L G

-5

-10

-15

E l e v a t i o n

G L

0 25 50 75 100-25-50-75-100

-5

-10

-15

E l e v a t i o n

G L

EARTHEN BERM

-5

-10

-15

E l e v a t i o n

L G

0 25 50 75 100-25-50-75-100

-5

-10

-15

E l e v a t i o n

L G

DIKE C/L STA 9+21

DIKE C/L STA 27+11

EARTHEN BERM

DIKE C/L STA 51+14

EARTHEN BERM

DIKE C/L STA 83+08

DIKE C/L STA 95+10

DIKE C/L STA 113+40

DIKE C/L STA 169+35

DIKE C/L STA 175+36

EARTHEN BERM

DIKE C/L STA 181+38

EARTHEN BERM

A DC

INCENTIVE

CLAUSES

E ER

I N

G

N I

G N

E

LA

V

UE

YOUR KEY TO

HIGHER PROFITS

Safety is a Part of Your Contract

D E

S C

R

IP

T

IO

N

D

2 3

C

4 5

A

B

M A

R K

A P

P R

D A

T E

M A

R K

D E

S C

R

IP

T

IO

N A

P P

R

D A

T E

US ARMY CORPS

OF ENGINEERS

NEW ORLEANS DISTRICT

SHEET

IDENTIFICATION

NUMBER

U S

A R

M Y E

N G

IN

E E

R D

IS

T R

IC

T

C O

R P

S O

F E

N G

IN

E E

R S

M

IS

S

IS

S

IP

P I

V A

L L E

Y D

IV

IS

IO

N

C A

L C

A S

IE

U R

IV

E R A

N D P

A S

S L

A

F O

R E

S H

O R

E D

IK

E C

O N

S T

R U

C T

IO

N

T O

A N

S I E

S O

L

IC

IT

A T

IO

N N

O

F

IL

E N

A M

E

D W

N B

Y

C K

D B

Y

D E

S

IG

N E

D B

Y

D A

T E

F

IL

E N

U M

B E

R

S

IZ

E

S U

B M

IT

T E

D B

Y

P L

O T S

C A

L E

P L

O T D

A T

E

C O

N T

R A

C T N

O

K J O

:1

R

IC

K B

R O

U S

S A

R D

H -1

-4

W .D

G N

W P -0

-B -0

J U

N E

C-06

C A

M E

R O

N A

N D C

A L

C A

S

IE

U P

A R

IS

H E

S L

A

A P

P R

O X

IM

A T

E M

IL

E

.8

B M

L

B M

L

C R

O S

S -S

E C

T

IO

N S

J U

L

A P

P R

O X

IM

A T

E M

IL

E

47032W1
47032W2
47032W3
47032W4
47032W5
47032W6

File details come from the government source that posted it. Updated .