ED North hallway TU install.pdf
PDF 445 KB Posted
- Solicitation number
- 36C26223Q1055
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26223Q1055 0001.docx | DOCX document | |
| Lead _ Asbestos Survey.pdf | ||
| 36C26223Q1055.docx | DOCX document | |
| VA10091.pdf | ||
| fw9.pdf | ||
| Titus cut sheets.pdf | ||
| S01. HVAC Modification (LL).pdf | ||
| Control Loops.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHALOMPAVLEB
Sticky Note New TU to be installed on the 16" High pressure side, to include all water and electrical and controls
VHALOMHANKSM
Line
VHALOMHANKSM
Line
VHALOMHANKSM
Line
VHALOMHANKSM
Rectangle
VHALOMHANKSM
Typewritten Text
NEW TU
Unit
VHALOMHANKSM
Typewritten Text Hot water supply tie in Hot water return tie in
VHALOMHANKSM
Line
VHALOMHANKSM
Typewritten Text Electrical to connect to new box.
120 Volt circuit.
File details come from the government source that posted it. Updated .