ECSS_Lawn_Maintenance_RFB_2026_docx.pdf

PDF 141 KB Posted

Attached to
Early County Board of Education Lawncare Services
Solicitation number
PE-55045-NONST-2026-000000005
Issued by
Douglas County, Georgia

About this file

This is a Request for Bid document issued by the Early County Board of Education (Early County School System) in Georgia for lawn maintenance services across eight school and administrative sites totaling approximately 60.7 acres. The scope of services includes mowing, weed eating, edging, blowing, weed spraying in non-turf areas, hedge and shrub trimming, and strawing performed two times annually. Minimum service frequency requirements include bi-weekly mowing during the growing season (March through September), quarterly weed control and hedge trimming, and routine off-season maintenance (October through February) encompassing leaf and debris removal, spot trimming, and site inspections. The bid was issued on February 2, 2026, with responses due by February 24, 2026, at 3:00 PM EST, delivered in person to the Early County Administrative and Training Site. Site visits are encouraged prior to bid submission and can be scheduled through Seth Taylor, Finance Director, at 229-723-4337 ext. 8575 or staylor@early.k12.ga.us. No pre-bid meeting will be held. The contract term runs from March 1, 2026, through February 28, 2027.

The bid document does not specify pricing terms, set-aside provisions, or incumbent contractor information. The successful bidder must provide proof of general liability insurance prior to contract execution and comply with all federal and state employment eligibility verification requirements, including participation in the E-Verify program. The Early County School System reserves the right to reject any or all bids and to terminate the contract at any time with written notice if deemed in the best interest of the school system. Bidders are responsible for determining actual turf areas within the identified sites, with Google Maps recommended as a reference tool for acreage estimation.

View the file

Other files

File Type Posted
ECSS_Lawn_Maintenance_RFB_2026_Addendum 1.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Request for Bid For

Lawn Maintenance Services

Early County School System Contract Term: March 1, 2026 – February 28, 2027

Bid Issue Date: February 2, 2026 Bid Due Date: February 24, 2026 (3:00 PM EST)

Contact Information

Seth Taylor, Finance Director Early County Administrative and Training Site

40 Harold Ragan Drive Blakely, GA 39823

Phone: 229-723-4337 ext. 8575 Email: staylor@early.k12.ga.us

1. Overview

The Early County Board of Education (Early County School System or ECSS) invites sealed bids from qualified lawn maintenance providers. This bid is intended to be straightforward and accessible for local service providers.

2. Scope of Services Services include mowing, weed eating, edging, blowing, weed spraying in non-turf areas, hedge and shrub trimming, and strawing two (2) times per year.

3. Service Frequency (Minimum Expectations)

● Mowing:

No less than bi-weekly during the growing season, with frequency adjusted as needed based on grass growth and weather conditions. Off-season services shall be provided in accordance with the Off-Season Grounds Maintenance requirements below.

● Weed eating, edging, and blowing:

Performed with each service visit.

● Weed control / spraying:

Performed as needed, with a minimum of quarterly service.

● Hedge and shrub trimming:

Performed as needed, with a minimum of quarterly service.

● Strawing:

Performed two (2) times per year, or as needed for erosion control or bare areas.

● Off-Season Grounds Maintenance:

During the off-season, the contractor shall perform routine site inspections and general grounds maintenance as needed, including leaf and debris removal, spot trimming, and identification of issues impacting safety, drainage, or overall site appearance.

Growing season is defined as March–September.

Off-season is defined as October–February.

4. Acreage & Measurement Guidance

Acreage figures represent total site acreage and may include buildings and paved areas.

Bidders are responsible for determining actual turf areas. See Google Maps for visual reference. Vendors may use Google Maps measuring tools to estimate mowable turf by outlining grass areas at each site.

5. Sites and Acreage Site Address Acreage

Early County Administrative and Training Site

40 Harold Ragan Dr., Blakely, GA 8.9

Early County Family Connection

11927 Columbia St., Blakely, GA 2.2

Early County Ag Center 5188 Freeman Road, Blakely, GA 4.1

Early County Bus Shop 5200 Freeman Road, Blakely, GA 2.3

Early County Elementary School

283 Martin Luther King Jr Dr., Blakely, GA

28.0

Early County Middle School and Field

12053 Columbia St., Blakely, GA 7.3

Early County High School & Band Field

12020 Columbia St., Blakely, GA 4.5

Early County Football Field 12020 Columbia St., Blakely, GA 3.4

Total Estimated Acreage: 60.7 acres

6. Insurance Requirement The successful bidder must provide proof of general liability insurance prior to contract execution.

7. Employment Eligibility Verification The successful bidder shall comply with all applicable federal and state laws related to employment eligibility and work authorization, including participation in the federal E-Verify program. The bidder shall verify the employment eligibility of all employees performing work under this contract and maintain such compliance for the duration of the contract. Upon request, the bidder shall provide its E-Verify Company Identification Number and any required documentation or affidavits.

8. Scheduling and Communication The successful bidder shall coordinate lawn maintenance services with the Early County School System’s Director of Operations or designee. A general service schedule shall be established, and the contractor shall communicate planned service dates and any necessary changes to ensure all sites are serviced as required under the contract.

9. Termination for Convenience ECSS reserves the right to terminate the contract, in whole or in part, at any time, with written notice, if it is determined to be in the best interest of the school system.

10. Additional Information Bids should be delivered in person to:

Early County Administrative and Training Site 40 Harold Ragan Drive, Blakely, GA 39823

- No pre-bid meeting will be held.

- Bidders are encouraged to contact Mr. Seth Taylor to schedule site visits prior to submitting a bid.

- All bidders will be notified of the award decision.

- ECSS reserves the right to reject any or all bids.

Request for Bid
ForLawn Maintenance Services
2. Scope of Services
3. Service Frequency (Minimum Expectations)
4. Acreage & Measurement Guidance
Acreage figures represent total site acreage and may include buildings and paved areas. Bidders are responsible for determining actual turf areas. See Google Maps for visual reference. Vendors may use Google Maps measuring tools to estimate mowable turf by outlining grass areas at each site.
5. Sites and Acreage
6. Insurance Requirement
7. Employment Eligibility Verification
8. Scheduling and Communication
9. Termination for Convenience
10. Additional Information

File details come from the government source that posted it. Updated .