ECP 23-11131130E5 Elongated FSP_signed_fordistribution.pdf

PDF 1024 KB Posted

Attached to
Authorized Protective Eyewear List
Solicitation number
W91CRB-26-32432A
Issued by

About this file

This is an Engineering Change Request (ECR) for the PM SPE program focused on alternative use of elongated Fragment Simulating Projectiles (FSP) for MCEP Ballistic Testing. The ECR, submitted by Timothy M. Horne (Product Engineer, PdM SPE), proposes updating MIL-PRF-32432A to allow use of both regular and elongated FSP for ballistic testing. ATC conducted comparison tests between standard and elongated FSP, finding that the elongated FSP had less yaw, a lower V50 velocity, and potentially more challenging testing conditions. The document includes attachments of FSP requirements and a test report, and has received approvals from the Contracting Officer's Representative and APM. The ECR is classified as a Major change and aims to provide vendors and test facilities more flexibility in projectile selection while potentially reducing misfires during testing.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PM SPE ENGINEERING CHANGE REQUEST (ECR)

(Vendors – Complete Blocks 2 – 19 and Submit to PM SPE)

1. PM SPE CONTROL NUMBER

2. ORIGINATOR 3. ECR TYPE

a. TYPED NAME (First, Middle Initial, Last) b. ADDRESS (Street, City, State, Zip Code)

RFD

RFW

4. CLASSIFICATION

5. TITLE OF ECR

6. ITEM DESIGNATION 7. PROCUREMENT ACTIVITY

8. BASELINE AFFECTED

a. MCN / NSN b. MODEL / DESIGN CODE

9. END ITEM NOMENCLATURE 10. CONTRACT NUMBER AND LINE ITEM

11. LOTS / MATERIAL AFFECTED 12. REOCCURING DEVIATION (if Yes, Provide CAR# in Block 12 & Status in Block 18)

13. EFFECT ON COST / PRICE 14. EFFECT ON DELIVERY SCHEDULE

15. OTHER SYSTEMS / CONFIGURATION ITEMS / INTERFACES AFFECTED

16. DESCRIPTION OF ECR

17. NEED FOR ECR

18. CORRECTIVE ACTION TAKEN

19. SUBMITTING ACTIVITY

a. TYPED NAME (FIRST, MIDDLE INITIAL, LAST) c. SIGNATURE

b. TITLE / ORGANIZATION d. DATE (YYYYMMDD)

PM SPE FORM 1 (ECR), JULY 15 Page 1

PM SPE CONTROL NUMBER

TITLE OF ECR

20. PM SPE JUSTIFICATION

21. ATTACHMENTS

22. COR (APPROVAL AUTHORITY FOR MINOR ECRS) / PM SPE TECHNICAL STAFF APPROVAL / DISAPPROVAL FOR MAJOR OR CRITICAL ECRS)

a. APPROVAL

b. SIGNATURE c. DATE SIGNED

(YYYYMMDD)

23. APM APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR MAJOR ECRs)

24. PM SPE APPROVAL / DISAPPROVAL (APPROVAL AUTHORITY FOR CRITICAL ECRs)

PM SPE FORM 1 (ECR), JULY 15 Page 2

PM SPE CONTROL NUMBER

TITLE OF ECR

PM SPE FORM 1 (ECR), JULY 15 Page 3

File details come from the government source that posted it. Updated .