Echo Canyon Project_Part1.pdf
PDF 797 KB Posted
- Attached to
- FY 2018, PKAA, Echo Canyon Project
- Solicitation number
- DQ1 PKAA 2017001573 2
- Issued by
- Kit Carson County, Denver City, Colorado
About this file
This is a Documented Quote (bid solicitation) issued by the Colorado Division of Reclamation, Mining and Safety (DRMS) for the Echo Canyon Project located near Twin Lakes, Colorado. The project involves safeguarding six adits and two shafts using various closure methods including backfilling, corrugated steel pipes, grating, and polyurethane foam, with bat gates incorporated into several closures. A mandatory pre-bid meeting and site showing was scheduled for June 27, 2017, at 10:00 a.m. in Twin Lakes, Colorado. Sealed bids were due by July 11, 2017, at 4:00 p.m., with bid opening on July 12, 2017, at 10:00 a.m. The project construction was scheduled between August 28, 2017, and September 29, 2017, with a completion time of thirty-three calendar days after receipt of the Notice to Proceed, including ten days of mobilization. Specific mine features requiring closure include Feature 203 (36-inch CSP with bat gate), Feature 205 (grated adit closure with bat gate), Feature 207 (48-inch CSP with bat gate and drain pipe), Feature 208 (36-inch CSP with bat gate and drain pipe), Feature 214 (polyurethane foam), Feature 215 (grated shaft closure), Feature 217 (hand backfill), and Feature 224 (grated adit closure with bat gate).
Bids must include a bid schedule, bid bond of at least five percent of the total bid price, and a list of equipment. A performance and payment bond equal to one hundred percent of the original contract price is required if the bid exceeds $50,000. Retainage will be withheld at ten percent for bids between $50,000 and $149,999.99, and five percent for bids of $150,000 or greater, until project completion and advertisement. Liquidated damages are set at $400 per day for delays beyond the completion deadline. The contractor must obtain commercial general liability insurance with $1,000,000 per occurrence limits, automobile liability insurance with $1,000,000 combined single limits, and worker's compensation insurance as required by state law. The State of Colorado must be named as an additional insured on all liability policies. The project is funded by federal grant money through the U.S. Department of Interior, Office of Surface Mining, Reclamation and Enforcement under Title IV of the Surface Mining Control and Reclamation Act (Public Law 95-87, CFDA 15.252). Award will be made to the low responsive and responsible bidder meeting all requirements and criteria, with consideration given to the lowest grand total price, equipment capabilities, and ability to meet performance time requirements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment #1 Echo Canyon Project.pdf | ||
| Echo Canyon Project_Part3.pdf | ||
| Echo Canyon Project_Part2.pdf | ||
| Attendees Echo Canyon Project Pre-Bid Mtg.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us John W. Hickenlooper, Governor | Robert Randall, Executive Director | Virginia Brannon, Director
DATE: June 6, 2017
TO: Interested Contractors
FROM : Craig Bissonnette, Division of Reclamation, Mining and Safety
RE: Documented Quote, Echo Canyon Project Bid, 2017 - 1573
Enclosed is a brief description and bid schedule for the Echo Canyon Project.
PROJECT LOCATION
The project is located near the town of Twin Lakes, Colorado. Please see the attached map.
WORK SUMMARY
The project work will include safeguarding six (6) adits and two (2) shafts using various closure methods such as backfilling, grating and polyurethane foam. Bat gates will be incorporated into several closures.
PRE-BID MEETING AND SITE SHOWING
A mandatory pre-bid meeting and site showing will be held on Tuesday, June 27, 2017 at 10:00 in Twin Lakes, Colorado. Meet at the public parking area in downtown Twin Lakes, on the south side of Highway 82. The parking area is located directly across the road from the Twin Lakes General Store. Please see attached map.
Access to some of the mine features is limited. Oversized vehicles are not recommended.
The Pre-bid Meeting is for the purpose of showing prospective bidders the work site and vicinity.
Bidders are advised to be prompt. A sign-in sheet will be available at the Pre-Bid meeting for firms to register their attendance. It is the bidder's responsibility to make certain their attendance and all contact information is recorded completely and legibly on the sign-in sheet. If the contractor does not provide all information in legible form on the pre-bid sign-in sheet, DRMS is unable to make contact with the bidder for forwarding amendments or notices.
The bidder will be considered non-responsive, and may be disqualified from the bidding process.
Please review Meeting Requirements PRIOR to the meeting. All interested bidders MUST attend. Bidding documents must be obtained prior to the pre-bid meeting. Any Documents that cannot be loaded to the VSS System are the ONLY documents that will be distributed at the Pre-Bid Meeting.
http://mining.state.co.us/
Each individual may represent him/herself or a single company for the purpose of bidding. Signing the Pre-Bid Meeting attendance list to represent more than one person or company is not permitted. Failure to sign-in and out or to attend the entire meeting will be cause for rejection of a bid.
THIS PRE-BID MEETING INVOLVES INSPECTION OF HAZARDOUS AND
UNSTABLE MINE OPENINGS. THE SAFETY OF PROSPECTIVE BIDDERS IS OF
UTMOST IMPORTANCE TO THE DIVISION OF RECLAMATION, MINING AND
SAFETY. NO ONE WILL BE ALLOWED WITHIN 15 FEET OF ANY VERTICAL MINE
OPENING WITHOUT PROPER SAFETY EQUIPMENT INCLUDING: SAFETY BELT
OR HARNESS PROPERLY SECURED TO A SAFETY LANYARD AND ANCHOR. NO
ONE WILL BE ALLOWED TO EXAMINE ANY HORIZONTAL MINE OPENING
WITHOUT WEARING A HARD HAT.
BID SUBMISSION AND EVALUATION
Bidders are cautioned that, notwithstanding any remarks or clarifications given at this meeting and site showing, all terms and conditions of the contract documents remain unchanged unless they are changed by written amendment issued by the OWNER. If the answers to questions, or any amendment to the contract documents create ambiguities, it is the responsibility of the bidder to seek clarification prior to submitting a bid.
BID SUBMITTAL DATE
The Deadline for all bids to be submitted is no later than 4:00 p.m. on Tuesday, July 11, 2017.
All bids need to be submitted as SEALED BIDS in single copy for the work described herein.
Bids will be received until the date and time specified above at the Colorado Division of Reclamation, Mining and Safety, 1313 Sherman Street, Suite 215, Denver, Colorado 80203.
Electronic bids are NOT being accepted by the Vendor Self Service system at this time.
A responsive bid must include the following, properly completed:
• Bid Schedule
• Bid Bond
• List of Equipment
BID OPENING DATE
The Bids for this project will be opened on Wednesday, July 12, 2017 at 10:00 a.m.
A written tabulation of the Documented Quote (DQ) results will be available to those bidders who submit an email address or a clearly-visible, self-addressed, stamped envelope with their bid.
Please allow two weeks for receipt of DQ results. Telephone requests cannot be honored because of time constraints.
PROJECT DATES
The project is scheduled for construction between August 28, 2017 and September 29, 2017. This includes ten (10) days mobilization time. These dates are tentative and may change.
TIME OF COMPLETION
The time of completion allowed for the project is thirty-three (33) calendar days after receipt of the Notice to Proceed. This includes ten (10) days mobilization time.
BID BOND
Bid Bond. A bid bond is required for all jobs over $50,000.00. A bid guarantee in an amount not less than five percent (5%) of the total bid price must be submitted in the form of a firm commitment, such as a bid bond, bank money order, certified check or cashier's check. Checks or money orders should be made payable to the Treasurer, State of Colorado. If a bid bond is submitted, the State form shall be used. An irrevocable letter of credit is not acceptable as a bid guarantee. Bid guarantees, other than bid bonds, will be returned (a) to unsuccessful bidders as soon as practicable after the opening of bids, and (b) to the successful bidder upon execution of such further contractual documents and bonds (including any necessary coinsurance or reinsurance agreements) as may be required by the bid as accepted.
Failure to furnish a bid guarantee in the proper form and amount by the time set for opening of bids may be cause for rejection of the bid.
If the successful bidder, upon acceptance of his bid by the OWNER, fails to execute such further contractual documents, and give such bond(s) (including any necessary coinsurance or reinsurance agreements) as may be required within ten (10) days after receipt of the Notice of Award, the contract may be terminated for default. In such event the CONTRACTOR shall be liable for any cost of procuring the work which exceeds the amount of his bid, and the bid guarantee shall be available toward offsetting such difference.
PERFORMANCE AND PAYMENT BONDS
A Performance and Payment bond is required if the amount bid is $50,000.00 or greater. The Contractor shall furnish a labor and material payment bond for 100 percent of the original contract price and a performance bond for 100 percent of the original amount of the contract. The bonds are required by State Law, Title 24-105, 202-203, C.R.S., as amended. The bonds shall be submitted using the State forms. A certified or cashier’s check or bank money order may be accepted in lieu of the bonds. If a surety other than a bond is used, the State will hold fifty percent (50%) of the surety until the final settlement date and fifty percent (50%) for six (6) months after the final settlement date.
BID AWARD
Award will be made with reasonable promptness, by written notice to the low responsive and responsible bidder whose bid meets the requirements and criteria set forth in the Invitation for bid. These criteria will include, but not be limited to the lowest GRAND TOTAL PRICE, corrected if necessary for errors in price extension and/or addition, on the Bidder's equipment if a List of Equipment Offered is required with the bid, and capability to meet the performance time requirements. The GRAND TOTAL PRICE will be used for comparing bids only.
To be considered responsive and responsible, bidders may not have a Below Standard "(1)", OVERALL (averaged) performance rating in the Colorado Contract Management System (CMS), for any construction project completed for Colorado in the last five years, per C.R.S. 24- 105-1(2)
NOTICE OF AWARD AND EXECUTION OF DOCUMENTS
A Notice of Award will be sent to the apparent low bidder within a reasonable time following the bid opening. The Division of Reclamation, Mining and Safety must receive the following by the date specified in the award letter:
(a) Fully-executed Performance and Payment Bonds, accompanied by appropriate Power of Attorney, effectively dated, if required;
(b) Certificates of Insurance showing proof of required coverage and
Additional Insured Endorsement;
(c) AML Contractor Ownership and Control Form;
(d) Minority (MBE)/women (WBE) Business Participation form;
(e) Completed W-9 forms, if required;
(f) Project Schedule.
If the above documents are not submitted properly by the date specified in the award letter, the Division of Reclamation, Mining and Safety may elect to award the project to the next lowest bidder.
The apparent low bidder must submit a certificate of insurance with the following limits:
THREE-WAY AGREEMENT
A three way "Agreement for Reclamation Activities" is not required for this job. Please see Article 4 of the General Conditions for the applicable insurance requirements.
INSURANCE
A. The contractor shall obtain at his own expense, and maintain at all times during the term of this contract, insurance listed below. Proof of insurance must be submitted on certificates showing the following minimum coverage:
1) Worker’s Compensation Insurance as required by state statute, and Employer’s
Liability Insurance covering all of contractor’s employees acting within the course and scope of their employment.
2) Commercial General Liability Insurance written on ISO occurrence form CG 00 01
10/93 or equivalent, covering premises operations, fire damage, independent contractors, products and completed operations, blanket contractual liability, personal injury, and advertising liability with minimum limits as follows:
a. $1,000,000 each occurrence;
b. $1,000,000 general aggregate;
c. $1,000.00 products and completed operations aggregate; and
d. $50,000.00 any one fire.
If any aggregate limit is reduced below $1,000,000 because of claims made or paid, the contractor shall immediately obtain additional insurance to restore the full aggregate limit and furnish to the State a certificate or other document satisfactory to the State showing compliance with this provision.
3) Automobile Liability Insurance covering any auto (including owned, hire and non
-owned autos) with a minimum limit as follows: $1,000,000 each accident combined single limit.
The Certificates of Insurance and insurance policies required above shall be subject to the following stipulations:
B. The State of Colorado shall be named as additional insured on the Commercial General
Liability Policy (leases and construction contracts will require the additional insured coverage for completed operations on endorsements CG 2010 11/85, CG 2037 or equivalent). Coverage required of the contract will be primary over any insurance or self-insurance program carried by the State of Colorado.
C. The Insurance shall include provisions preventing cancellation or non-renewal without at least forty-five (45) days prior notice to the State by certified mail.
D. The contractor will require all insurance policies in any way related to the contract and secured and maintained by the contractor to include clauses stating that each carrier will waive all rights of recovery, under subrogation or otherwise, against the State of Colorado, its agencies, institutions, organizations, officers, agents, employees and volunteers.
E. All policies evidencing the insurance coverages required hereunder shall be issued by insurance companies satisfactory to the State.
F. The contractor shall provide certificates showing insurance coverage required by this contract to the State within ten days of the notice of award. No later than 15 days prior to the expiration date of any such coverage, the contractor shall deliver the State certificates of insurance evidencing renewals thereof. At any time during the term of this contract, the State may request in writing, and the contractor shall thereupon within 10 days supply to the State, evidence satisfactory to the State of compliance with the provisions of this section.
Bidders are advised to consult with their insurance carrier concerning these requirements.
Submit a bid only if you are prepared to complete these requirements.
RETAINAGE
If the Documented Quote bid amount is between $50,000.00 and $149,999.00, ten percent (10%) retainage will be withheld until the project has been satisfactorily completed and advertised. If the bid amount is $150,000.00 or over, five percent (5%) retainage will be withheld until the project has been satisfactorily completed and advertised.
LIQUIDATED DAMAGES
The liquidated damages for this project will be $400.00 per day. Please see General Bid Specifications 2009, Article 39.
NOTICE OF CONTRACTOR’S SETTLEMENT
When the project is completed, the contractor’s settlement will be advertised electronically on Colorado Vendor Self Service (ColoradoVSS).
PROJECT FUNDING
This project is funded by Federal grant money made available to the State of Colorado through the U.S. Department of Interior, Office of Surface Mining, Reclamation and Enforcement through Title IV of the Surface Mining Control and Reclamation Act, Public Law 95-87. (CFDA 15.252).
CORA DISCLOSURE
To the extent not prohibited by federal law, this Contract and the performance measures and standards under CRS 24-103.5-101, if any, are subject to public release through the Colorado Open Records Act, CRS 24-72-101, et.seq.
HISTORIC PRESERVATION
Areas adjacent to the mine sites often contain related artifacts and structures, such as buildings, tipples, ore houses, headframes and foundations that may be historically significant. Care shall be exercised to avoid any disturbances to these structures and artifacts, in order to preserve their integrity. Existing structures shall not be used as load-bearing devices.
INDEMNIFICATION
Contractor shall indemnify, save and hold harmless the State, its employees and agents, against any and all claims, damages, liability and court awards including costs, expenses and attorney fees and related costs, incurred as a result of any act or omission by Contractor or its employees, agents, subcontractors, or assignees pursuant to the terms of this contract.
GENERAL BID SPECIFICATIONS
The Colorado Inactive Mine Reclamation Program General Bid Specifications 2009, which include General Conditions, Standard Work Specifications, and Standard Drawings and Figures are intended to complement this Documented Quote. The Documented Quote combined with the General Bid Specifications 2009 form the complete Invitation and Bid document. Please refer to the Standard Work Specifications for all applicable types of work required in the Documented Quote. Copies of the General Bid Specifications are available at the Pre-Bid Meeting or from the Division of Reclamation, Mining and Safety (CDRMS), 1313 Sherman Street, Room 215, Denver, Colorado 80203 (303) 866-3567.
Work Description The project work will include safeguarding six (6) adits and two (2) shafts using various closure methods such as backfilling, corrugated steel pipes, grating and polyurethane foam. Bat gates will be incorporated into several closures. The attached General Conditions of the Contract and Purchase Order Terms and Conditions apply to all work.
Item 1.0: Mobilization/Demobilization This item includes all costs necessary and incidental to move equipment and supplies onto the project area, perform minimal road improvements, if required, move equipment within the project area during prosecution of the project, and any other requirements necessary for the successful completion of this project per Section 1.0 of the General Bid Specifications 2009. The CONTRACTOR shall also operate and maintain such temporary works and equipment throughout the period of construction. This item also includes all labor, equipment, and costs associated with demobilization and clean-up of the project site following the completion of the project. Applicable temporary works, such as sanitation facilities, shall fully comply with all rules and regulations.
Noxious Weeds In an attempt to mitigate the rampant spread of noxious weeds from one area to another, there will be a mandatory inspection of all equipment to be used during the course of construction at the project site. Prior to inspection, it is the responsibility of the Contractor to employ whatever cleaning methods are necessary to ensure that all equipment is free of soil, seeds, vegetative matter, or other debris that could contain or hold seeds. Equipment shall be considered clean when a visual inspection determines the equipment free of such material. The CONTRACTOR will be required to notify the PROJECT MANAGER in advance of mobilizing equipment on site to arrange for inspection. Disassembly of equipment components will not be required.
Measurement and payment No measurement for payment shall be made for mobilization and demobilization. Equipment cleaning and inspection costs for noxious weed mitigation shall be included in the Mobilization/Demobilization bid item. Payment of two-thirds of the lump sum price bid for Item
1.0 of the Bid Schedule shall be made with the first monthly progress payment after completion of the work described above for mobilization. Payment of one-third of the lump sum price bid for this task will be made with the progress payment following completion of all work. In the event the price bid for mobilization and demobilization items is greater than 15 percent (15%) of the total contract price, original invoices supporting the mobilization costs will be required before payment is approved.
Remobilization, if required, will be paid in accordance with the General Bid Specifications Section 1.4.4.
Item 2.0: Project Safety, Health, and Environmental Action Plan (SHEAP) The job will involve working around inactive mine features and hazards, and it is the responsibility of the CONTRACTOR to be aware of all OSHA regulations which apply to this contract. This task includes all the contractors expenses for employee time, labor, materials, and safety equipment and safety training necessary for preparing and executing a job safety plan. The Successful Bidder will be required to prepare the Project Safety Plan (SHEAP) and submit it for review and approval to the DRMS. The CONTRACTOR is required to develop and implement a Project Safety Plan in conjunction with project implementation. PROJECT MANAGER must receive the Project Safety Plan within five (5) working days of Notice to Proceed date.
The Project Safety Plan must be submitted to:
Craig Bissonnette PO Box 1619 Leadville, CO 80461
FAX (303) 832-8106
craig.bissonnette@state.co.us
At a minimum, the plan MUST provide specific, detailed responses to the following list of safety concerns that are likely to present themselves during the course of Project completion. When developing the Project Safety Plan, please list specific types of equipment to be provided by CONTRACTOR, including subcontractor(s), in order to address the safety concern, or specifically state the actions to be taken by CONTRACTOR, including crew and subcontractor(s) order to address the safety concern.
It is expected that the Project Safety Plan will be comprehensive and sufficiently detailed so that every member of the work crew, including sub-contractors, on site understands their responsibilities and the responsibilities of CONTRACTOR to ensure a safe and injury free work place. The Project Safety Plan must be provided to the work crew members in the language in which they are most readily able to comprehend.
Upon receipt of the SHEAP, the OWNER will either accept the plan, or request that more detail be provided.
The CONTRACTOR and their employees or sub-contractors are expected to follow the SHEAP during performance of every component of the Project. If the PROJECT MANAGER determines that the SHEAP is not being followed, either in whole or in part, the Project may be immediately suspended, without stopping the job clock, until such time as the SHEAP is implemented.
Measurement and Payment There will be no measurement for payment. Payment for this task shall be for the lump sum bid price under Item 2.0 of the Bid Schedule. This lump sum bid will cover all costs for developing and implementing the SHEAP, including writing and revising the plan as required, provisions and maintenance of safety equipment and personnel, conduct of daily safety meetings, employee training, and all other items necessary and incidental to fulfilling the requirements of this task and of the SHEAP. Payment of two-thirds of the lump sum price bid for Item 2.0 shall be made with the first monthly progress payment. Payment of one-third of the lump sum price bid will be made with the progress payment following completion of all work. Payment will only be made upon approval from the PROJECT MANAGER.
Item 3.0: Install Mine Closures Closure of the following hazardous mine features shall include all costs associated with the work of safeguarding and revegetating the features in accordance with the 2009 General Bid Specifications and all applicable regulations.
SEDIMENT CONTROL
Any safety closure work involving disturbance to the ground will require sediment control measures. It will be the responsibility of the CONTRACTOR to implement these measures to ensure sediment generated during construction activities does not migrate from the project site.
Features requiring sediment control measures will be specified in the work description for each feature. The cost for constructing sediment controls shall be included in the price bid for closure of each mine feature.
The surface of disturbed ground will be intensely roughened to minimize sediment transport. This will be done by digging gouges or trenches perpendicular to the slope over the entire surface of disturbed ground and by creating small earthen berms approximately six inches (6”) in height along the downhill edge or toe of all disturbed areas. The ends of the berm shall extend beyond the area of disturbance by approximately eighteen inches (18”) and tie into the uphill slope to effectively catch any sediment.
REVEGETATION REQUIREMENTS
All areas disturbed during reclamation work and any other areas specified in these Special Conditions will be revegetated according to the Revegetation Specifications, SWS 20, in the General Bid Specifications 2009. Commercial fertilizer and weed-free mulch is required for this project. Seed will be supplied by the OWNER. Cost for revegetation must be included in the lump sum price bid for each mine closure.
Zone 5: High-Elevation Meadow, Coniferous Woodland/Forest & Aspen Seed Mix will be used on all disturbed areas.
Feature ID: 203 Type of Feature: Adit Present Size Opening: 3ft by 4ft Condition: Partially Collapsed Lining: Rock Depth of Opening: Unknown Drainage Present: No Closure Method: 36” CSP with Bat Gate, per SWS 10 & 13
Work Description: Install a ten (10) foot long, thirty-six (36) inch corrugated steel pipe (CSP) adit closure with bat gate in accordance with Standard Work Specification (SWS) 10 and Standard Drawing No. 5 and Bat Gate Alternative, SWS 13 and Standard Drawing No. 6-2. Install the CSP eight (8) feet into the opening with two (2) feet outside. Opening will need to be excavated prior to closure installation. Closure will be backfilled with onsite material with the front three feet (3’) consisting of concreted durable rock. An access door or drain pipe is not required for this closure.
SEDIMENT CONTROL: None required unless substantial ground disturbance occurs.
Feature ID: 205
Present Size Opening: 6ft by 4ft Condition: Intact Lining: Rock + Timber Depth of Opening: 75’ Drainage Present: No Closure Method: Grated Adit Closure with Bat Gate, per SWS 11 & 13
Work Description: Install a steel grated adit closure with bat gate in accordance with SWS 11 and Standard Drawing No. 6-1 and bat gate alternative, SWS 13 and Standard Drawing No. 6-2.
Note: Timbered portal structure will remain in place. An access door or drain pipe is not required for this closure. SEDIMENT CONTROL: None required unless substantial ground disturbance occurs.
Feature ID: 207
Present Size Opening: 7ft by 7ft Condition: Intact Lining: Rock & Timber Depth of Opening: 100’ + Drainage Present: No Closure Method: 48” CSP with Bat Gate and Drain Pipe, per SWS 10 & 13
Work Description: Install a ten (10) foot long, forty-eight (48) inch corrugated steel pipe adit closure with bat gate and access door in accordance with SWS 10 and Standard Drawing No. 5 and Bat Gate Alternative, SWS 13 and Standard Drawing No. 6-2. Feature will need to be cleared of timbers and excavated to open it up prior to closure installation. Closure will be backfilled with onsite material with the front three feet (3’) consisting of concreted durable rock. Mine feature is draining. A six (6) inch diameter drain pipe will be installed under the CSP and extend five (5) feet beyond each end of the pipe. Drain pipe shall be twenty (20) feet in length. A simple screen composed of two (2) horizontal bars and two (2) vertical bars will be fabricated from #4 rebar (or similar) and attached to the outside end of the drain pipe. SEDIMENT CONTROL: None required unless substantial ground disturbance occurs.
Feature ID: 208
Present Size Opening: 6ft by 5ft Condition: Partially Collapsed Lining: Rock & Timber Depth of Opening: Unknown Drainage Present: Yes Closure Method: 36” CSP with Bat Gate and Drain Pipe, per SWS 10 & 13
Work Description: Install a ten (10) foot long, thirty-six (36) inch corrugated steel pipe adit closure with bat gate in accordance with SWS 10 and Standard Drawing No. 5 and Bat Gate Alternative, SWS 13 and Standard Drawing No. 6-2. Feature will need to be cleared of timbers and excavated to open it up prior to closure installation. Closure will be backfilled with onsite material with the front three feet (3’) consisting of concreted durable rock. Mine feature is draining. A six (6) inch diameter drain pipe will be installed under the CSP and extend five (5) feet beyond each end of the pipe. Drain pipe shall be twenty (20) feet in length. A simple screen composed of two (2) horizontal bars and two (2) vertical bars will be fabricated from #4 rebar and attached to the outside end of the drain pipe. An access door is not required for this closure.
SEDIMENT CONTROL: None required unless substantial ground disturbance occurs.
Feature ID: 214 Type of Feature: Shaft Present Size Opening: 4ft by 10ft Condition: Intact Lining: Rock & Timber Depth of Opening: 20’ Drainage Present: No Closure Method: Polyurethane Foam, per SWS 9
Work Description: Remove loose timbers from the shaft. Install a polyurethane foam (PUF) shaft closure is accordance with SWS 9. Set bottom form at a depth of eight (8) feet below ground surface and install PUF to a thickness of five (5) feet. Backfill the remaining three (3) feet with onsite material. Eight (8) cubic yards of PUF is required for this closure. CONTRACTOR shall take measures to prevent PUF from getting on the wooden structure or surrounding ground surface.
Any timbers removed will be placed neatly to the side. SEDIMENT CONTROL: None required
Feature ID: 215 Type of Feature: Shaft Present Size Opening: 10ft by 10ft Condition: Intact Lining: Rock & Timber Depth of Opening: 20’ Drainage Present: No Closure Method: Steel Grated Shaft Closure, per SWS 8
Work Description: Install a steel grated shaft closure in accordance with SWS 8 and Standard Drawing No. 4. Closure will require a W4x13 steel beam to reduce the span. Please see grated shaft closure design specifications for further details. SEDIMENT CONTROL: None required
Feature ID: 217
Present Size Opening: 3ft by 4ft Condition: Partially Collapsed Lining: Rock & Timber Depth of Opening: 150’ Drainage Present: No Closure Method: Hand Backfill, per SWS 2
Work Description: Backfill the feature by hand using onsite materials in accordance with SWS
2. Rip rap is not required for this closure. SEDIMENT CONTROL: Disturbed ground will be intensely roughened as described above.
NOTE: Feature is only accessible by foot and requires a roughly two (2) mile hike that gains 2,000’ in elevation to reach.
Feature ID: 224
Present Size Opening: 6ft by 4ft Condition: Intact Lining: Rock & Timber Depth of Opening: 75’ Drainage Present: No Closure Method: Grated Adit Closure with Bat Gate, per SWS 11 & 13
Work Description: Install a steel grated adit closure with bat gate in accordance with SWS 11 and Standard Drawing No. 6-1 and Bat Gate Alternative, SWS 13 and Standard Drawing No. 6-2.
Timbered portal structure will remain in place. An access door or drain pipe is not required for this closure. SEDIMENT CONTROL: None required unless substantial ground disturbance occurs.
Measurement and Payment There will be no measurement for payment made for this bid item. Payment will be made on a lump sum basis for each closure according to the lump sum price in the Bid Schedule under Item
3.0. The cost for revegetating disturbed areas must be included in the bid for the closure of each mine feature. The price bid shall include all costs for labor, materials, equipment, revegetation, sediment control and all other items necessary and incidental to complete the tasks as described.
ADDITIONAL BID ITEMS
There are included on the Bid Schedule, several additional bid items. These bid items are not guaranteed, and will be used only in the event that conditions change on site, and only after approved by the PROJECT MANAGER.
Item 4.0: Provide and Install Additional Steel Grating If required, this item is for providing and installing up to an additional twenty-five (25) square feet of steel grating as directed by the PROJECT MANAGER. Additional grating shall be installed in accordance with SWS 8. This Item is NOT GUARANTEED.
Measurement and Payment Payment for this task will be made at the unit price per square feet established under Item 4.0 of the Bid Schedule and will be made at the completion of the task and upon approval by the PROJECT MANAGER. The price for providing and placing additional steel grating shall include all costs for labor, materials, equipment and all other items necessary and incidental to complete the tasks as described in Item 4.0.
PROJECT OBSERVATION
The PROJECT MANAGER will be at the project site periodically to monitor construction activities and ensure that each work item is completed and constructed to design specifications.
The PROJECT MANAGER will be available during regular business hours (8:00 A.M. to 5:00 P.M.) on weekdays. Inspections will not be scheduled on weekend days or holidays without prior approval of the PROJECT MANAGER. It is the Contractor's responsibility to schedule inspections with the Project Manager so as not to delay the work. The following items must be observed and approved by the PROJECT MANAGER before proceeding with additional work:
1. Grated Closures: Anchor bar depth and placement must be inspected before installation of the grating.
2. PUF Closures: Depth to bottom form must be verified prior to installing PUF. PUF plug installation must be inspected prior to backfilling.
3. Surface Roughening: Initiation of intense surface roughening.
3/12/13
Return by July 11, 2017 at 4:00 P.M. to: Receipt of Addenda Nos._________ is hereby acknowledged
Submit Bids Electronically at Colorado VSS (Vendor Self Service) https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService, or Mail; Fax to:
Teresa Ryan Division of Reclamation, Mining and Safety 1313 Sherman St., #215 Denver, CO 80203 Fax (303) 832-8106
Echo Canyon Project Bid Schedule 2017 - 1573
Contractor_____________________________________ Date__________________________
Signature _____________________________ Phone___________________________
Address _______________________________________________________________
DO NOT AMEND ANY PART OF THIS BID SCHEDULE
ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED
ALL LINES ITEMS MUST BE COMPLETED
Page 1 of 2 Pages
ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
1.0 Mobilization/Demobilization 1 Lump
Sum N/A $
2.0 Safety, Health & Environmental
Action Plan (SHEAP) 1 Lump
Sum N/A
3.0 Install Mine Closures
(Total from Page 2) 1 Lump
Sum N/A
ADDITIONAL BID ITEMS – NOT GUARUNTEED
4.0 Install Add’l Steel Grating 25 Square
Feet $ $
GRAND TOTAL $
https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService
3/12/13
Echo Canyon Project Bid Schedule 2017 - 1573
Item 3.0 - Install Mine Closures:
ID
Feature
Closure Work
Bid Amount
County
Funding
203 Adit 36” CSP w/ Bat Gate $ Lake OSM
205 Adit Grated Adit Closure w/ Bat Gate $ Lake OSM
207 Adit 48” CSP w/ Bat Gate & Access Door $ Lake OSM
208 Adit 36” CSP w/ Bat Gate $ Lake OSM
214 Shaft Polyurethane Foam (8CY) $ Lake OSM
215 Shaft Grated Shaft Closure $ Lake OSM
217 Adit Hand Backfill $ Lake OSM
224 Adit Grated Adit Closure w/ Bat Gate $ Lake OSM
Total (Enter here and on Page 1 of Bid Schedule, Item 3.0) $
DO NOT AMEND ANY PART OF THIS BID SCHEDULE
ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED
ALL LINES ITEMS MUST BE COMPLETED
Page 2 of 2 Pages
State Form SBP-6.14 Rev. 9/2006
STATE OF COLORADO
OFFICE OF THE STATE ARCHITECT
STATE BUILDINGS PROGRAMS
BID BOND
Institution/Agency:
Project No./Name:
KNOW ALL MEN BY THESE PRESENTS:
WHEREAS, hereinafter called the “PRINCIPAL”, is submitting a PROPOSAL for the above described project, to the STATE OF COLORADO, hereinafter called the “OBLIGEE”.
WHEREAS, the Advertisement for Bids has required as a condition of receiving the Proposals that the Principal submit with the PROPOSAL GUARANTY in an amount not less than five per cent (5%) of the Proposal, which sum it is specifically agreed is to be forfeited as Liquidated Damages in the event that the Principal defaults in his obligation as hereinafter specified, and, in pursuance of which Requirement, this Bid is made, executed and delivered.
NOW THEREFORE, the Principal and a corporation of the State of , duly authorized to transact business in Colorado, as Surety, are held and firmly bound unto the Obligee, in the sum of five per cent (5%) of the Principal’s total bid price, lawful money of the United States for the payment of which sum, well and truly to be made to the Obligee, we bind ourselves, our heirs, executors, administrators, successors and assigns, jointly and severally, firmly by these presents.
FURTHER THAT, a condition of the obligation that the Principal shall maintain his Proposal in full force and effect for thirty (30) days after the opening of the proposals for the project, or, if the Principal’s Proposal is accepted, the Principal shall, within the prescribed time, execute the required Agreement, furnish the required Performance Bond, Labor and Material Payment Bond, Insurance Policy, and Certificates of Insurance, then this obligation shall be null and void, otherwise it shall remain in full force and effect, and subject to forfeiture upon demand as Liquidated Damages.
IN WITNESS WHEREOF said Principal and Surety have executed this Bond, this day of , A.D., 20 .
(Corporate Seal) THE PRINCIPAL
Company Name
ATTEST
Address (including city, state and zip) Secretary Phone number:
Name (Print) Signature
Name (Print) and Title
SIGNATURES If the “Principal” is doing business as a Corporation, the Bid Bond shall be signed by an officer, i.e., President or Vice President. The signature of the officer shall be attested to by the Secretary and properly sealed.
If the “Principal” is an individual or a partnership, the Bid Bond shall so indicate and be properly signed.
(Corporate Seal) THE SURETY
By __________________________________________ Secretary Attorney-in-Fact
THIS BOND MUST BE ACCOMPANIED BY POWER OF ATTORNEY, EFFECTIVELY DATED.
FAILURE TO PROVIDE A PROPERLY EXECUTED BID BOND WITH A PROPERLY EXECUTED POWER OF
ATTORNEY WILL RESULT IN THE BIDDER’S PROPOSAL BEING DEEMED NON-RESPONSIVE.
As of 8/16/2012
LIST OF EQUIPMENT OFFERED
Under the headings below, list all equipment which you offer to perform the work described in the Bid. Please see “List of Equipment Offered” in the Special Conditions.
ITEM
MAKE
MODEL NUMBER
SERIAL NUMBER
YEAR
MANUFACTURED
THIS PAGE MUST BE RETURNED WITH YOUR BID
OR THE BID MAY BE CONSIDERED NON-RESPONSIVE
PAGE 1 OF 1 PAGE
Colorado Division of Reclamation, Mining and Safety SPECIFIC CONDITIONS
SHEAP
As of 06/08/09 Page 1
STANDARD WORK SPECIFICATIONS
SAFETY, HEALTH, & ENVIRONMENTAL ACTION PLAN RESPONSE ITEMS
The following is a summary list of items that must be addressed in writing by the CONTRACTOR. All items that are checked (X) apply to the work to be performed and must be addressed in a written plan. Each employee is to read and sign the plan as part of the project orientation prior to starting work on the project.
A. SITE ACCESS
No person may enter the job site without first receiving hazard training from CONTRACTOR’S safety representative. X
CONTRACTOR employees are required to travel to and from their work areas by designated routes. X
All CONTRACTOR equipment is subject to a safety inspection before entering the job site.
B. PART 48 TRAINING REQUIREMENTS
Each CONTRACTOR employee shall receive orientation training, provided by the CONTRACTOR, comprised of all aspects of the contract's Safety, Health and Environmental Action Plan (SHEAP).
X
C. SUBSTANCE ABUSE SCREENING
Alcohol and drugs are not allowed on the job site. X
D. PROACTIVE SAFETY
The CONTRACTOR shall designate one person to be the safety representative responsible for safety and health at the work site. X
The CONTRACTOR shall conduct safety meetings at least weekly. X All safety meetings shall be documented and include the date, subject matter, trainer and all participants signatures. X
Daily pre-job safety talks shall be given by the CONTRACTOR . X Any change in the daily work plan shall be communicated by the CONTRACTOR to all affected personnel. X
The CONTRACTOR shall conduct daily work area inspections. X These inspections shall be documented in an approved book.
E. GENERAL SAFETY STANDARDS
Horseplay will not be tolerated. X Safety glasses, steel toe boots and hard hats are required to be worn at all times. This equipment must meet ANSI standards. X
Safety glasses and a face shield or goggles are required when performing any work that generates or could generate flying debris or when this type of work is being performed.
As of 06/08/09 Page 2
Trenches and other excavations more than three feet deep must be properly shored or laid back to a 1:1 slope before personnel are allowed to enter. X
Procedures for night work shall be established and adequate illumination shall be provided.
During drilling and underground work, a recently calibrated multi gas tester with audible alarm (measuring O2 , CO, H2S) shall be used at all times. A record shall be kept of tests.
An MSHA 40 hour underground mine safety training certificate, or a current Underground Miner training certificate, is required for each employee working underground.
Self-rescuers must be worn during underground work.
Rubber boots or waders shall be provided for each employee working in wet conditions.
Temperature sensors shall be provided at work locations.
Other safety requirements: Be alert and considerate of hikers. X
F. ACCIDENT REPORTING
All accidents and injuries must be immediately reported to the Colorado Division of Reclamation, Mining and Safety project manager. X
The CONTRACTOR shall investigate all such occurrences and develop an action plan to prevent their recurrence. X
All investigations shall be documented. X
G. FIRST AID
First aid kits meeting MSHA (CFR 75.1713-7 or 77.1707) requirements shall be maintained in a sanitary condition and placed at all work sites. X
H. COMMUNICATIONS
All work areas shall have a method to communicate with other personnel at all time. Personnel will never be allowed to work alone without a secure means of communication and periodic checks by another party.
X
All communications will be positive in nature. A response is required.
Provide an equipment spotter equipped with a radio.
I. EQUIPMENT OPERATION
Seatbelts shall be used at all times. X Equipment always has the right-of-way. X Safe parking procedures (chock blocks, etc.) shall be used at all times. X All lights, horns, brakes, wipers, back-up alarms and other safety equipment shall be fully operational at all times. X
As of 06/08/09 Page 3
Each piece of equipment shall have at least one portable fire extinguisher. X All mobile equipment, with the exception of pickup trucks with unrestricted rear view, will be equipped with back-up alarms. X
Mobile equipment shall be equipped with roll-over-protection (ROPS) and/or falling object protection structures (FOPS) as required by MSHA regulations. X
All machinery shall be secured to ensure zero mechanical potential prior to work being performed on the machinery. X
Equipment shall be maintained in safe condition. X Provide a driller’s safety platform.
Inspect hydraulic and pneumatic lines and couplings daily.
Provide whip checks for all airline connections.
J. ELECTRICAL SAFETY
Electrical lock and tag procedures are to be used at all times.
Be aware when working in the vicinity of overhead electrical transmission lines. X
K. SAFE WORK IN ELEVATED AREAS
Fall Protection shall be a full body harness and shock-absorbing lanyard. X Wire rope lanyards are required for cutting and welding operations. X All personnel are to be tied off if working where a fall hazard exists. X Ladder work procedures shall include set up, tie off, inspection and protection from overhead electrical hazards. Only non-conductive ladders are to be used.
L. SCAFFOLDS
Scaffold use requires an approved plan.
M. AERIAL LIFTS
Personnel must be tied off at all times when working in man baskets.
Provide rigging and signaling procedures for helicopter work.
N. CRANE REQUIREMENTS
Inspection and annual certification records must be provided.
Proper Rigging Procedures and inspection of lifting devices shall be standardized.
Tag lines shall be used at all times.
As of 06/08/09 Page 4
Ground persons shall be used at all times.
Signals shall be standardized and used at all times.
Overhead line clearances shall be checked before working.
O. HEALTH CONSIDERATIONS
Sanitary bathroom facilities shall be provided and maintained. X Sanitary potable water facilities shall be provided and maintained. X Inhalation hazards shall be minimized at all times through engineering and administrative controls. X
Dust. X Gases. X Vapors. X Paint.
Engine exhaust. X Solvents.
Oxygen deficiency.
Welding fumes. X Ventilation and respiratory protection plan.
Lead and chromate paints are prohibited.
Other health hazards specific to this job:
P. ENVIRONMENTAL: LIQUID WASTES
Methods approved by Colorado Division of Reclamation, Mining and Safety shall be used to eliminate the possibility of water pollution caused by spills of materials and sedimentation run-off.
X
Methods approved by Colorado Division of Reclamation, Mining and Safety shall be used to prevent spill hazards at bulk storage areas for fuels, oils, or other fluids.
X
All used fluids will be drained into clearly marked DOT containers. X Under no circumstances will fluids be allowed to drain onto the ground.
X
Equipment fueling and service procedures will not be performed on topsoil. X EPA Prevention and Control Procedures are to be followed in the event of an accidental spill. X
All employees shall be trained by the CONTRACTOR in spill prevention, cleanup and disposal of all wastes.
As of 06/08/09 Page 5
All spills must be reported to Colorado Division of Reclamation, Mining and Safety Personnel Immediately. X
Reportable spills will be handled by the CONTRACTOR in accordance with State of Colorado And EPA regulations. X
Q. ENVIRONMENTAL: SOLID, NON-HAZARDOUS WASTES
Construction debris and excess materials shall be disposed of in a container clearly marked "TRASH".
Trash containers must be covered at all times to prevent wind-blown litter. X Employees must be instructed by the CONTRACTOR in procedures used to segregate hazardous and non-hazardous wastes.
All disposal activities must comply with federal and state regulations. X
R. ENVIRONMENTAL: HAZARDOUS WASTES
Contractor is responsible for all sampling, testing, and analysis of unknown waste streams.
Disposal of hazardous waste is the responsibility of the CONTRACTOR . X Contractor generated wastes such as equipment/machine oils, fuels, oily debris, residue paints, solvents, and containers containing same shall be cleaned and disposed of in compliance with all local, state, and federal regulations.
X
All containers will have CONTRACTOR 's name clearly marked on the containers.
Aerosol cans, oily rags, solvents and waste lubricants shall be segregated into separate containers.
All drums will be stored in an upright positon, on pallets or similar device to facilitate observation for leaks, corrosion or damage. X
All products used on job site must be approved by Colorado Division of Reclamation, Mining and Safety prior to their use and an MSDS kept at the site.
S. FIRE PROTECTION
Specific procedures must be developed by the CONTRACTOR to ensure that fire hazards are addressed and controlled. X
Use, storage and segregation of flammable and combustible materials must be in accordance with NFPA regulations. X
Contractor will immediately notify Colorado Division of Reclamation, Mining and Safety project manager of any fire emergency. X
Provision for fire response must be addressed in plan approved by Colorado Division of Reclamation, Mining and Safety.
Hot Work Procedures will be used to ensure welding, cutting and grinding safety. X
These procedures shall include grinding, welding and cutting safety, bottle handling and storage, training for employees expected to perform welding and cutting, fire watch procedures, and personnel protection during these operations.
As of 06/08/09 Page 6
Compressed gas cylinders must be stored in upright position, secured to prevent falling, regulators guarded on all sides. X
Oxygen and Acetylene cylinders not in use must be shut off, pressure bled from hoses, regulators. X
Fire extinguishers must provided for all mobile equipment and at all areas where hot work is being performed. X
Fire extinguishers must be maintained and inspected in accordance with MSHA/OSHA regulations on/in all mobile equipment. X
T. HANTA VIRUS
Demolition of abandoned buildings involves the disruption of mice habitat, which has the potential of harboring the hanta virus. A concentrated chlorine solution (50/50 chlorox/water) is known to be effective in killing the virus. The concentrated spray should be directed at groupings of mice feces and urine areas. The CONTRACTOR is strongly advised to spray down buildings targeted for demolition prior to initiating demolition activities. Precautions against producing dust should be taken in areas where there is a high possibility of liberating hanta virus into the air.
U. WHITE-NOSE SYNDROME (WNS)
White-nose syndrome (WNS) is a malady of unknown origin that has killed hundreds of thousands of bats across the northeast United States and continues unchecked. Evidence suggests that the disease can be transported from site-to-site on boots, clothes, and gear of mine workers. Therefore, the following actions are required to reduce the risks of spreading
WNS.
1. Workers in and around mines will use clothing, boots, and gear that has NEVER been used in caves or mines in affected or adjacent states.
2. Following completion of work , all equipment, gear, boots, and clothing will be thoroughly decontaminated following the protocols below:
Step #1: Upon exiting a mine:
• Thoroughly scrape or brush off any dirt and mud from clothes, boots, and gear and place them in a sealed plastic bag or plastic container with lid to be cleaned and disinfected off site. It is important to keep clean clothing, gear, and boots isolated from potentially contaminated items at all times until they have been properly decontaminated.
• Outer clothing should be removed prior to entering a vehicle after/between a site visit. A clean change of clothing is recommended. Surface cleaning of exposed skin (arms, face, neck, hands, etc.) with antibacterial hand sanitizer (i.e. Purell®) should occur prior to entering the vehicle’s cab.
Step #2: Upon return to shop or office / Prior to entering another mine:
• For clothing – Wash all clothing and appropriate equipment in washing machine using the hottest cycle possible for material and conventional detergents. Laboratory testing has found Woolite® fabric wash to be the best surfactant for clothing. Rinse thoroughly, and then follow by soaking with household bleach solution diluted to 1 part bleach to 9 parts water in a tub or plastic container. Soak for 10 minutes, then rinse with clean water and air dry.
• For submersible gear (i.e. soft-sided gear) – Disinfect any equipment that can be submersed in a solution of household bleach diluted to 1 part bleach to 9 parts water in a
As of 06/08/09 Page 7 tub or plastic container or 3% concentration of Lysol® All-purpose Professional Cleaner or the antibacterial form of Formula 409®. Keep submersed for 10 minutes, then rinse with clean water and air dry.
• For non-submersible gear (i.e. hard-sided gear) – Disinfect any equipment that cannot be submersed by applying an appropriate and compatible disinfectant to the outside surface by using 3% concentration of Lysol® All-purpose Professional Cleaner, Lysol® disinfecting wipes or the antibacterial form of Formula 409®; or use household bleach solution diluted to 1 part bleach to 9 parts water. Keep on surface for 10 minutes, then rinse with clean water and air dry.
• For boots – Boots need to be carefully scrubbed and rinsed so that all soil and organic material is removed. Rubber and leather boots, including soles and leather uppers, must then be disinfected with an appropriate disinfectant such as 3 Lysol® All-purpose Professional Cleaner or the antibacterial form of Formula 409® household bleach)solution diluted to 1 part bleach to 9 parts water. Keep on surface for 10 minutes, then rinse with clean water and air dry.
• For ropes and harnesses – This equipment should be dedicated to one mine.
Decontamination of vertical equipment is recommended.
This is the start of the file's text. The full file is on GovTribe.