This is Amendment No. 1 to an Invitation for Bid issued by the Colorado Division of Reclamation, Mining & Safety for the Echo Canyon Project (2017-1573). The amendment provides clarifications and revisions to the original bid documents for mine closure work located in Lake County. The project encompasses the installation of corrugated steel pipe (CSP) closures, grated adit closures with bat gates, polyurethane foam shaft closures, and hand backfill at seven mine features (203, 205, 207, 208, 214, 215, and 224), with Feature 217 moved to an additional safety closure classification as non-guaranteed work. Key revisions include standardized CSP installation specifications of seven feet into the opening with three feet outside for Features 203, 207, and 208; installation of dual six-inch drains with screens and controlled water release procedures for Features 207 and 208; modification of Feature 224 dimensions to six feet by six feet; authorization to use two five-foot pipe sections banded and welded together for CSP closures; and treatment of trees removed on-site by bucking into four to six-foot lengths and scattering. The bid deadline is 4:00 p.m. on Tuesday, July 11, 2017, with submission required through Colorado VSS (Vendor Self Service) or by mail/fax to Teresa Ryan at the Division office. Bidders were required to acknowledge receipt and acceptance of the amendment on the bid form and submit the revised bid schedule.
The revised bid schedule identifies four main cost categories: Mobilization/Demobilization (one lump sum), Safety, Health & Environmental Action Plan (one lump sum), Install Mine Closures (total from detailed feature breakdown), and Additional Steel Grating (25 square feet). The mine closure line items include Feature 203 (36-inch CSP with bat gate), Feature 205 (grated adit closure with bat gate), Feature 207 (48-inch CSP with bat gate and access door), Feature 208 (36-inch CSP with bat gate), Feature 214 (polyurethane foam, 8 cubic yards), Feature 215 (grated shaft closure), Feature 224 (grated adit closure with bat gate), and the non-guaranteed Feature 217 (hand backfill). All work is funded by Lake County OSM (Orphaned Sites Mitigation) resources. Contractors were required to complete all line items and return all pages of the bid schedule without amendment, with pricing submitted for each feature as specified in the revised schedule.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Echo Canyon Project_Part3.pdf | ||
| Echo Canyon Project_Part1.pdf | ||
| Echo Canyon Project_Part2.pdf | ||
| Attendees Echo Canyon Project Pre-Bid Mtg.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1313 Sherman Street, Room 215, Denver, CO 80203 P 303.866.3567 F 303.832.8106 http://mining.state.co.us John W. Hickenlooper, Governor | Robert Randall, Executive Director | Virginia Brannon, Director
DATE: June 28, 2017
TO: All Bidders on the Echo Canyon Project
FROM: Craig Bissonnette, Division of Reclamation, Mining & Safety
RE: Amendment No. 1 to 2017-1573
Thank you for your attendance at the Pre-Bid Meeting. The following clarifications and amendments should be noted and incorporated into the bid documents:
1. Feature 203 – Revised Work Description: The corrugated steel pipe (CSP) will be installed seven (7) feet into the opening with three (3) feet outside. All other specifications remain the same.
2. Feature 207 – Revised Work Description: The CSP will be installed seven (7) feet into the opening with three (3) feet outside. Two (2) six (6) inch drains will be installed under the CSP. Both drains will require screens as described in the specifications. The trapped water will be slowly drained over several phases to ensure a controlled release of water prior to installing safety closure. All other specifications remain the same.
3. Feature 208 - Revised Work Description: The CSP will be installed seven (7) feet into the opening with three (3) feet outside. Two (2) six (6) inch drains will be installed under the CSP. Both drains will require screens as described in the specifications. The trapped water will be slowly drained over several phases to ensure a controlled release of water prior to installing safety closure. All other specifications remain the same.
4. Feature 217 – This feature is not guaranteed and has been moved to Additional Safety Closure.
5. Feature 224 – The dimensions of this feature have been changed to six (6) feet by six (6) feet. All other specifications remain the same.
6. For CSP closures, two (2) five (5) foot sections of pipe may be used and banded together.
If two sections of pipe are used, CONTRACTOR must weld fasteners on band.
7. Any trees removed around the project site will be bucked into 4’-6’ lengths and scattered.
The bid submittal for this project is no later than 4:00 p.m. on Tuesday, July 11, 2017. Please use the REVISED Bid Schedule included with this amendment when submitting your bid.
All terms and conditions of the Invitation for Bid other than as changed by this amendment remain the same.
Receipt and acceptance of this amendment shall be acknowledged on the bid form and by submitting the REVISED Bid Schedule.
http://mining.state.co.us/
3/12/13
Return by July 11, 2017 at 4:00 P.M. to: Receipt of Addenda Nos._________ is hereby acknowledged
Submit Bids Electronically at Colorado VSS (Vendor Self Service) https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService, or Mail; Fax to:
Teresa Ryan Division of Reclamation, Mining and Safety 1313 Sherman St., #215 Denver, CO 80203 Fax (303) 832-8106
Echo Canyon Project REVISED Bid Schedule
June 28, 2017 2017-1573
Contractor_____________________________________ Date__________________________
Signature _____________________________ Phone___________________________
Address _______________________________________________________________
DO NOT AMEND ANY PART OF THIS BID SCHEDULE
ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED
ALL LINES ITEMS MUST BE COMPLETED
Page 1 of 2 Pages
ITEM DESCRIPTION QTY UNIT UNIT PRICE AMOUNT
1.0 Mobilization/Demobilization 1 Lump
Sum N/A $
2.0 Safety, Health & Environmental
Action Plan (SHEAP) 1 Lump
Sum N/A
3.0 Install Mine Closures
(Total from Page 2) 1 Lump
Sum N/A
ADDITIONAL BID ITEMS – NOT GUARUNTEED
4.0 Install Add’l Steel Grating 25 Square
Feet $ $
GRAND TOTAL $
https://codpa-vss.hostams.com/webapp/PRDVSS1X1/AltSelfService
3/12/13
Echo Canyon Project REVISED Bid Schedule
June 28, 2017 2017-1573
Item 2 - Install Mine Closures:
ID
Feature
Closure Work
Bid Amount
County
Funding
203 Adit 36” CSP w/ Bat Gate $ Lake OSM
205 Adit Grated Adit Closure w/ Bat Gate $ Lake OSM
207 Adit 48” CSP w/ Bat Gate & Access Door $ Lake OSM
208 Adit 36” CSP w/ Bat Gate $ Lake OSM
214 Shaft Polyurethane Foam (8CY) $ Lake OSM
215 Shaft Grated Shaft Closure $ Lake OSM
224 Adit Grated Adit Closure w/ Bat Gate $ Lake OSM
ADDITIONAL SAFETY CLOSURE – NOT GUARANTEED
217 Adit Hand Backfill $ Lake OSM
Total (Enter here and on Page 1 of Bid Schedule, Item 3.0) $
DO NOT AMEND ANY PART OF THIS BID SCHEDULE
ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED
ALL LINES ITEMS MUST BE COMPLETED
Page 2 of 2 Pages
| Echo Canyon - Amendment#1 |
| Echo Canyon - REVISED Bid Schedule |
| Contractor_____________________________________ Date__________________________ |
| DO NOT AMEND ANY PART OF THIS BID SCHEDULE |
| ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED |
| DO NOT AMEND ANY PART OF THIS BID SCHEDULE |
| ALL PAGES OF THIS BID SCHEDULE MUST BE RETURNED |
| Page 2 of 2 Pages |
File details come from the government source that posted it. Updated .