Addendum #1 is issued by Maryland's state procurement system for the Patapsco Valley State Parks Pickall Shelter Renovations project, specifically modifying the original solicitation (eMMA# BPM049103). The addendum extends the bid due date to May 15, 2025, and amends key aspects of the project's scope of work, materials specifications, and method of work. Specifically, the contractor is now required to dig out remaining wood post remnants in the concrete slab up to 8 inches deep and fill to grade with pre-mixed concrete rated at SHA MIX 33, 3,500 psi, as specified in the State Highway Administration's latest construction materials standards.
The addendum does not introduce new pricing terms, set-asides, or funding details, but rather provides technical clarifications to the existing renovation project. The modifications suggest a refined approach to structural repairs for thirteen shelters in the Pickall Area of Patapsco Valley State Park, ensuring more precise requirements for concrete removal and replacement. The amendment maintains the project's core objective of replacing rotted wood columns while providing more specific guidance to potential contractors on the exact methods and materials to be used in the renovation process.
Text of this file
ADDENDUM #1 – eMMA# -BPM049103 Patapsco Valley State Parks Pickall Shelter Renovations
The due date for this solicitation has been extended. The bid due date is now May 15, 2025.
Amend Scope of Work, A. 2 to read:
ADD: g. The Contractor shall dig out the remaining wood post remnants in the concrete slab up to 8” deep and fill up to grade with concrete Amend Materials & Supplies. 2. Specifics to add:
ADD: r. Concrete shall be pre-mixed Concrete: Shall be rated at SHA MIX 33, 3,500 psi, as specified in the latest edition of the State Highway Administration Standard Specifications for Construction Materials Amend Method of work. b. Specifics d.i.:
ADD: i. The Contractor shall dig out the remaining wood post remnants in the concrete slab up to 8” deep and fill up to grate with concrete.
END OF AMENDMENT #1
Other files
| File | Type | Posted |
|---|---|---|
| EC25-09-020-67 Addendum #2 5.8.25.rtf | RTF text file | |
| EC25-09-020-67 Addendum #1 5.7.25.rtf | RTF text file | |
| EC25-09-020-67 Addendum #2 5.8.25.rtf | RTF text file | |
| EC25-09-020-67 Addendum #2 5.8.25.rtf | RTF text file | |
| EC25-09-020-67 Addendum #1 5.7.25.rtf | RTF text file | |
| EC25-09-020-67 Addendum #1 5.7.25.rtf | RTF text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
File details come from the government source that posted it. Updated .