EC25-09-020-67 Addendum #1 5.7.25.rtf

RTF text file 50 KB Posted

Attached to
Task Order - Patapsco Valley State Parks Pickall Shelter Renovations
Solicitation number
BPM049103
Issued by
Howard County, Edgemont CDP, Maryland

About this file

Addendum #1 for eMMA# BPM049103 is a contract modification issued by Maryland's state parks system for the Patapsco Valley State Parks Pickall Shelter Renovations project. The addendum extends the bid due date to May 15, 2025, and introduces amendments to the original solicitation's scope of work, materials specifications, and method of work. Specifically, the changes include requirements for the contractor to remove remaining wood post remnants from concrete slabs up to 8 inches deep and fill the areas with pre-mixed SHA MIX 33 concrete rated at 3,500 psi.

The addendum does not introduce new pricing terms, set-asides, or funding details beyond the technical modifications. The amendment appears to be a standard procedural update to clarify technical specifications and extend the bid submission timeline, ensuring potential contractors have precise instructions for the shelter renovation work. The modifications suggest a focus on structural integrity and standardized construction materials for the thirteen shelters located in the Pickall Area of Patapsco Valley State Park, with an emphasis on precise concrete and structural rehabilitation requirements.

Text of this file

ADDENDUM #1 – eMMA# -BPM049103 Patapsco Valley State Parks Pickall Shelter Renovations

The due date for this solicitation has been extended. The bid due date is now May 15, 2025.

Amend Scope of Work, A. 2 to read:

ADD: g. The Contractor shall dig out the remaining wood post remnants in the concrete slab up to 8” deep and fill up to grade with concrete Amend Materials & Supplies. 2. Specifics to add:

ADD: r. Concrete shall be pre-mixed Concrete: Shall be rated at SHA MIX 33, 3,500 psi, as specified in the latest edition of the State Highway Administration Standard Specifications for Construction Materials Amend Method of work. b. Specifics d.i.:

ADD: i. The Contractor shall dig out the remaining wood post remnants in the concrete slab up to 8” deep and fill up to grate with concrete.

END OF AMENDMENT #1

Other files

File Type Posted
EC25-09-020-67 Addendum #2 5.8.25.rtf RTF text file
EC25-09-020-67 Addendum #1 5.7.25.rtf RTF text file
EC25-09-020-67 Addendum #1 5.7.25.rtf RTF text file
EC25-09-020-67 Addendum #2 5.8.25.rtf RTF text file
EC25-09-020-67 Addendum #2 5.8.25.rtf RTF text file
EC25-09-020-67 Addendum #1 5.7.25.rtf RTF text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

File details come from the government source that posted it. Updated .