EBS SF1449_SPE60421C9302.pdf

PDF 1 MB Posted

Attached to
DLA Americas Bulk Petroleum Supply Manage Support Services
Solicitation number
SP0604-21-R-0402
Issued by

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Please wait...

If this message is not eventually replaced by the proper contents of the document, your PDF viewer may not be able to display this type of document.

You can upgrade to the latest version of Adobe Reader for Windows®, Mac, or Linux® by visiting http://www.adobe.com/go/reader_download.

For more assistance with Adobe Reader visit http://www.adobe.com/go/acrreader.

Windows is either a registered trademark or a trademark of Microsoft Corporation in the United States and/or other countries. Mac is a trademark of Apple Inc., registered in the United States and other countries. Linux is the registered trademark of Linus Torvalds in the U.S. and other countries.

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND

DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY

ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED

29. AWARD OF CONTRACT: REF. OFFER

16. ADMINISTERED BY CODE

7. FOR SOLICITATION

INFORMATION CALL:

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS

OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, & 30

1. REQUISITION NUMBER

0085969705

2. CONTRACT NO.

SPE604-21-C-9302

3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY CODE SPE604

DLA ENERGY

INSTALLATION ENERGY

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

USA

Local Admin: Ryan Whaley DRW0055 Tel: 703-767-2438 Email: Ryan.Whaley@dla.mil

10. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR:

SMALL BUSINESS

HUBZONE SMALL

BUSINESS

WOMEN-OWNED SMALL BUSINESS

(WOSB) ELIGIBLE UNDER THE WOMEN-OWNED

SMALL BUSINESS PROGRAM

8 (A)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

NAICS: 541611

SIZE STANDARD:

11. DELIVERY FOR FOB DESTINA-

TION UNLESS BLOCK IS

MARKED

12. DISCOUNT TERMS

Net 30 days

13a. THIS CONTRACT IS A

RATED ORDER UNDER

DPAS (15 CFR 700)

13b. RATING

14. METHOD OF SOLICITATION

RFQ IFB RFP

15. DELIVER TO CODE SPE604

SEE BLOCK 9

Criticality: C PAS : None

17a. CONTRACTOR/ CODE

OFFEROR

FACILITY

CODE

SPE6046A8Q2

LYNCH CONSULTANTS, LLC

1820 FORT MYER DR STE 610

ARLINGTON VA 22209-1807

USA

TELEPHONE NO. 5408343490

18a. PAYMENT WILL BE MADE BY CODE SL4701

DEF FIN AND ACCOUNTING SVC

BSM

P O BOX 182317

COLUMBUS OH 43218-2317

USA

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED.

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

25. ACCOUNTING AND APPROPRIATION DATA

AA: 97X4930 5CFX 2000030 001 2510 S33189 $940357.20

26. TOTAL AWARD AMOUNT (For Govt. Use Only)

$940,357.20

27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1, 52.212-4. FAR 52.212-3 AND 52.212-5 ARE ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED.

30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

30b. NAME AND TITLE OF SIGNER (Type or Print) 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER (Type or Print) 31c. DATE SIGNED

2021-Mar-10

SEE SCHEDULE

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

SEE SCHEDULE

STANDARD FORM 1449 (REV.

Prescribed by GSA - FAR (48 CFR) 53.212

SEE ADDENDUM

See Schedule

DATED . YOUR OFFER ON SOLICITATION (BLOCK 5),

INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE SET FORTH ,

HEREIN IS ACCEPTED AS TO ITEMS:

EDWOSB

Patrick Lynch - Managing Partner 08/26/2021

Ryan M. Whaley, DLA-Energy Contracting Officer

2021 AUG 30

15404

Stamp

32a. QUANTITY IN COLUMN 21 HAS BEEN

ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED:RECEIVED INSPECTED

COMPLETE PARTIAL FINAL

STANDARD FORM 1449 (REV. 2/2012)

36. PAYMENT

PARTIAL FINAL

19.

ITEM NO.

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

32b. SIGNATURE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT

REPRESENTATIVE

32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE

32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE

33. SHIP NUMBER 34. VOUCHER NUMBER 35. AMOUNT VERIFIED

CORRECT FOR

37. CHECK NUMBER

38. S/R ACCOUNT NO. 39. S/R VOUCHER NUMBER 40. PAID BY

42a. RECEIVED BY (Print) 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE

42b. RECEIVED AT (Location)

42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS

41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT

CONTINUATION SHEET REFERENCE NO. OF DOCUMENT BEING CONTINUED:

CONTINUED ON NEXT PAGE

PAGE 3 OF 12 PAGES

SECTION B

SUPPLIES/SERVICES: R408-V20000379

ITEM DESCRIPTION:

See Attached Statement of Work.

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT .

0001 R408-V20000379 12.000 EA $ 78,363.10 $ 940,357.20

CLIN 0001 Support Services

PREP FOR DELIVERY:

See Attached Statement of Work.

SPE604

INSTALLATION ENERGY

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

US

SPE604

INSTALLATION ENERGY

8725 JOHN J. KINGMAN ROAD

FORT BELVOIR VA 22060

US

GOVT USE

External External External Customer RDD/ ITEM PR PRLI PR PRLI Material Need Ship Date .

0001 0085969705 0001 N/A N/A N/A N/A

SOURCE SELECTION INFORMATION- IAW FAR 2.101 AND 3.104

Table of Contents

SECTION B – SUPPLES OR SERVICES AND PRICES/COSTS

SECTION C - PERFORMANCE WORK STATEMENT

SECTION I - CLAUSES

SECTION J - ATTACHMENTS

SECTION B – SCHEDULE

The requirements in the Performance Work Statement (PWS) herein shall be priced pursuant to the indicated Firm- Fixed Price (FFP) contract line item numbers (CLINS) specified in Table 1 below.

2.1 SCHEDULE OF SERVICES TO BE FURNISHED

Table 1-Price Schedule

ITEM

NO.

SUPPLIES/SERVICE QUANTITY UNIT UNIT PRICE AMOUNT

Base Period; Support Services 1 September 2021 Through 31 August

12 EA

$78,363.10 $940,357.20

Option Year 1; Support Services 01 September 2022 Through 31 August

$79,852.00 $958,224.00

Option Year 2; Support Services 01 September 2023 Through 31 August

$81,369.19 $976,430.28

Option Year 3; Support Services 01 September 2024 Through 31 August

$82,915.20 $994,982.40 0005 Option Year 4; Support Services

01 September 2025 Through 31 August

$84,490.59 $1,013,887.08 Total $4,883,880.96

Period of Performance CLIN 0001- (Base Period) 1 September 2021 Through 31 August 2022 CLIN 0002- (Option Period 1) 1 September 2022 Through 31 August 2023 CLIN 0003- (Option Period 2) 1 September 2023 Through 31 August 2024 CLIN 0004- (Option Period 3) 1 September 2024 Through 31 August 2025 CLIN 0005- (Option Period 4) 1 September 2025 Through 31 August 2026

SECTION C - PERFORMANCE WORK STATEMENT

2.1 INTRODUCTION

DLA Energy Americas serves within the Defense Logistics Agency (DLA) and DLA Energy, as a wholesale and retail level distributor of petroleum products, lubricating oils, and fuel additives to customers throughout the United States, the Caribbean, and Central America. DLA Energy Americas’ mission is to ensure our customers receive an uninterrupted inventory of on- specification fuel to execute and sustain their peacetime and wartime missions, and provide efficient and economical support of assigned supplies and services to authorized customers within assigned CONUS and OCONUS areas during both peace and contingency operations. To accomplish this mission, DLA Energy Americas oversees fuels accounting for over 420 Defense Working Capital Fund (DWCF) capitalized fuel locations. In addition, DLA Energy Americas manages approximately 1,228 non-capitalized customer accounts.

2.1.1 BACKGROUND

In light of this critical mission, DLA Energy has taken several steps to ensure that the goals, performance metrics, and strategic direction of the organization are aligned with its mission. DLA Energy Americas regions are responsible for accountability and oversight of the Defense Working Capital Fund (DWCF) petroleum products and ensuring petroleum products distributed to non-capitalized customers is properly accounted for. DLA Energy Americas regions support bulk petroleum supply management from the source of supply to the point of customer acceptance. DLA Energy Americas is revising its organizational structure to better provide direct support for Inventory Reconciliation, Accountability and the Auditability mission and to ensure audit readiness.

2.1.2 PERFORMANCE OBJECTIVE

DLA Energy Americas regions have a requirement for technical support to provide timely and accurate review of inventory accounts and transaction data details, including verification of completeness of transactional data in Fuels Manager Defense. Work includes working closely with DLA Energy headquarters and DLA Energy America’s capitalized and non-capitalized customers. The contractor is required to have daily interaction with Responsible Officers, Terminal Managers, and Fuel Accountants to ensure accurate and timely daily and monthly fuel account reconciliation for approximately 420 capitalized fuel locations, which include approximately 1,228 active product accounts. DLA Energy Policy P-43 will be strictly adhered to when accomplishing work and describes the duties that must be performed for daily, monthly, and end-of-year reconciliation; transaction reject solving; gain/loss control and analysis; in transit Movements Under Investigation program; Unmatched Movements program;

invoice resolution; unliquidated obligation (ULO) and unfulfilled customer orders (UFCO), and form (end of month reconciliation, automatic tank gauge checklist, regrades, determinable loss, etc.) collection and upload into the Webtool electronic system. Monthly metrics will be used to monitor areas which require further concentration to ensure mission success.

2.1.3 APPLICABLE DOCUMENTS

2.1.3.1 DoD Manual 4140.25, DoD Management of Energy Commodities, March 2, 2018

Vol 2: Record Retention and Forms Management, August 31, 2018 Vol 10: Sales Accountability and Document Management, April 4, 2019 https://www.esd.whs.mil/Directives/issuances/dodm/

2.1.3.2 DLA Energy P-Documents (Policy and Procedures) P-7 and P-43 https://dla.deps.mil/sites/dlaenergy/scm/SitePages/Publications.aspx

2.2 SCOPE OF WORK

The contractor shall provide the appropriate personnel required to effectively meet mission critical requirements and assist Government resources in the following technical areas: (1) Inventory Reconciliation (Daily, Monthly, EOY) and Fuel Manager Defense account ledger monitoring including transaction reject solving and operational gain/loss control; (2) Receiving Reports and Invoice Resolution

(3) Movements Under Investigation packages, solving Unmatched Movements, Unliquidated Obligations, and Unfulfilled Customer Orders, (4) Help Desk ticket coordination, (5) Configuration, Report and Analysis Support (6) Audit support to include form collection and posting, and (8) Program and Contract Management

High-level objectives and responsibilities are described below. High-level objectives are not unique to one specific task and may be represented across multiple tasks. Specific tasks are listed in Section 2.3 - Performance Requirements.

2.2.1 In-depth knowledge of petroleum supply chain management and policies, inventory accountability and reconciliations, resolution of receiving reports and associated invoice reconciliation and ability to perform detailed analysis either independently or in a team environment.

2.2.2 Broad knowledge and understanding of DoD fuel operations or commercial fuel operations.

2.2.3 In-depth knowledge of how Defense Working Capital Fund (DWCF) inventory transactions interface with DWCF financial ledgers.

2.2.4 Knowledge and understanding of DOD Energy Policies and DoD Energy bulk and ground fuel contract delivery determination clauses.

2.2.5 Basic understanding of general accounting principles and inventory process controls.

2.2.6 Provides advisory and assistance to DLA Energy capitalized and non-capitalized customers.

2.3 PERFORMANCE REQUIREMENTS

This section of the Performance Work Statement defines the performance requirements and the performance results the government intends to measure the contractor’s performance against. These performance requirements address the full scope of this contract and support the higher- level objectives stated in paragraph 2.2 above. All Contractor employees must meet the requirements for an information technology (IT) non-critical sensitive level background investigation.

2.3.1 Task 1 – Inventory Reconciliation Document Review

Task 1 Background: Monitor inventory records (transactions) between Fuels Manager Defense / Enterprise Business System and inventory movement related action(s) as they pertain to product account reconciliation(s). The DLA Energy Americas regions are responsible for ensuring customer ledgers are reconciled in Fuels Manager Defense. HQ Energy Inventory Accountability reconciles the Enterprise Business System. Inventory reconciliation pertains to each Defense Fuel Support Point’s (DFSP) individual product accounts and related transaction details. DFSPs are responsible for daily, monthly and end of Fiscal Year reconciliation. DLA Energy’s function of this process is to provide oversight, support, and guidance, recommendations and resolution assistance to aide in the account reconciliation.

2.3.1.1 Daily Analysis / Document upload: Complete an analysis of documents that require uploading into the Webtool program. Communicate with DLA Energy Region office point of contact (POC) when necessary for guidance and direction. Secure missing documentation from site or Region Resolution Specialist and review it for accuracy and completeness and upload document in Webtool program making the necessary annotations/notes in the Webtool notes area and select the appropriate drop down if applicable.

2.3.1.2 Inventory Products and Grade Codes: The contractor shall conduct daily inventory account analysis and shall identify potential product(s), which are no longer necessary (static).

When a product is identified as unnecessary or static, the contractor shall notify and coordinate with DLA Energy Region POC on the recommendation for closure. The contractor shall assist with analysis related to the new product grade code or product grade code closures.

2.3.1.3 Operating Gains and Losses: Secure and review the EOM DD Form 1348-8 for signatory authority, completeness, accuracy and to ensure any investigation findings are provided in the remarks section for any excessive gain or loss. If out of tolerance, the contractor shall review the investigation findings and/or causative research provided to ensure the explanation is viable, conforms to DLA Energy Policy and determine if a root cause was identified. The contractor shall track open-ended explanations or determinations, which forces an investigation to carry over into a following month. Notify DLA Energy-Region POC of all late submissions monthly as of the 20th of each Month.

2.3.1.3.1 Whenever a determination is made that a DD Form 200, Financial Liability Investigation of Property Loss, should be initiated or when the contractor suspects a cause to be theft, unauthorized use or willful misconduct, the contractor shall notify their Region POC immediately.

2.3.1.3.2 When determined that the form meets all criteria mentioned above the contractor shall then combine the EOM DD Form 1348-8 and required EOM checklist forms into a single PDF document with the EOM DD Form 1348-8 form being the first page of the combined PDF and upload it to the Webtool program.

2.3.1.4 Consecutive Letters: Monthly after End of month is processed for assigned sites the contractor shall review each assigned site to see if any consecutive letter is required to be sent out. Any site experiencing three consecutive out of tolerance gains or losses require a consecutive letter be generated and sent to the Responsible Officer or Terminal Manager of the site. When sending the letter provide the Responsible Officer or Terminal Manager a suspense.

The contractor shall follow up with sites that don’t respond in the allotted time provided. Once response is received, the contractor shall review the investigation findings and/or causative research provided to ensure the explanation is viable, conforms to DLA Energy Policy and determine if a root cause was identified. If responses do not identify the root cause the contractor shall return the form to the site for a better investigation. The contractor shall track open-ended explanations or determinations, which forces an investigation to carry over into a following month. If the response does identify a root cause the response will be uploaded in the Webtool program and closed out.

2.3.1.5 Appointment Letter: The contractor shall review all appointment letters (POCs/RO/PA/TM information) quarterly that are loaded into the DLA Energy Webtool to ensure they are current and correct. The contractor shall engage with their assigned sites or contracting officer representative whenever an appointment letter is within 30 days of its expiration date. When a new letter is received the contractor shall ensure that it is uploaded in the Webtool and information in the Webtool is updated in accordance with the information provided in the new appointment letter. If the new letter has a new appointee the contractor shall ensure that all required documentation for a change in Responsible Officer is obtained and uploaded in the Webtool program.

2.3.1.6 In addition to a quarterly review of Responsible Officer and Terminal manager appointments the contractor shall review contact information for each assigned site and ensure that the Inventory POC and Alternate Responsible Officer point of contact information is current and update it if it is not.

2.3.2 Task 2 – Receiving Report / Invoice Resolution

Task 2 Background: Defense Fuel Support Points that receive fuel via commercial vendor or refinery will have an invoice, from the vendor, that will be associated to the individual receipt of product or the receipt of product by multiple Defense Fuel Support Points. Tasks associated with the vendor invoicing, Residual Blocked Invoices, Failed Invoices and Goods Receipt (GR) Verification, will tie directly to the delivery/receipt of product and invoice submitted by the vendor. Residual Blocked Invoices are partially received product or invoiced quantity from Bill of Lading (BOL) that does not match the receipt annotated by the Defense Fuel Support Point.

Failed invoices are processed incorrectly; either by date of delivery, delivery location or delivery order number. Goods Receipt Verification are disputes in quantity invoiced by the vendor and the quantity received at the Defense Fuel Support Point. The tasks will require the review, analysis and tracking of subsequent payments to resolve processing and payment errors. Will be responsible for working with the applicable site to obtain required supporting documentation.

2.3.2.1 Residual Blocked Invoices: DLA Energy Regional Offices are responsible for validating invoices. If determined that the GR is correct, assist the site with correcting the GR (receipt). If a blocked invoice is listed in the Webtool program then the contractor shall obtain the Bill of Lading or source documents for their receipt. Once obtained the contractor shall upload it into the Webtool program and enter applicable notes that describe whether or not the GR was processed correctly. The Contractor shall engage when the invoices appear in the Webtool program and help resolve system invoice problems prior to the invoice reaching penalty.

2.3.2.1.1 Refer to applicable Desk Guides for assistance in resolving actions.

2.3.2.2 Failed Invoices: The contractor shall obtain the Bill of Lading or source documents for their receipt. Once obtained the contractor shall upload it into the Webtool program and enter applicable notes that describe whether or not the GR was processed correctly. Provide resolution for invoices that failed to process.

2.3.2.2.1 Requirements and actions to resolve refer to applicable Desk Guides for assistance.

2.3.3 Task 3 - Unmatched Movements (Receipts, Shipments, Open TD Shipments) and Movements Under Investigation

Task 3 Background: An Unmatched Movement is a missing or misaligned movement (shipment or receipt) in-transit (from stock or procurement) record pending completion in EBS or reflecting errors in reporting. An Unmatched Movement exists when the shipment and receipt document numbers for a particular movement do not match and when the movement is not in Transportation & Distribution (TD) Shipment 6 Status. Open TD shipments are shipments that are tied to a specific nomination that were either processed incorrectly or additional shipments are tied to the same nomination and have not been completed. Movements Under Investigation (MUI) pertain to all items under Task 2 and are movements that were processed that result in an excess gain or loss of .005 or greater between the applicable shipment and receipt associated with the movement and requires additional investigation and analysis to reconcile the product movement.

2.3.3.1 MUIs: Contractor shall assist DLA Energy Americas Region POC’s in monitoring all EBS MUIs. Will also assist to ensure appropriate actions are initiated and/or documented to evidence the completion of an investigation along with resolving root causes. The contractor shall review MUI’s for assigned sites at least twice weekly. During review they will determine if the MUI is actually an MUI or a processing error. If it is a processing error then they will engage with the site to process the correction in FMD. If it is an MUI the contractor shall secure Transportation Discrepancy Report (TDR) from the site and will review the investigation findings and/or causative research provided to ensure the explanation is viable, conforms to DLA Energy Policy and determine if a root cause was identified. Once review is complete they will upload the TDR in the Webtool program. Once the end of month has passed the contractor shall group TDRs by site and initiate a grouped MUI workflow. They then will compile a consolidated monthly MUI memo based on instructions provided by contractor Region POC. Once MUI memo is complete it will be uploaded into the proper workflow and then routed to the assigned RS for review and forwarding to the Supervisor.

2.3.3.1.1 Refer to applicable Desk Guides for assistance in resolving actions.

2.3.3.2 Open TD Shipments: Contractor shall assist DLA Energy Americas with TD Shipment investigation, analysis and resolution. The “Unmatched Movements EBS” function in the Webtool program shall be used to document all associated details related to corrective actions is required.

2.3.3.2.1 Refer to applicable Desk Guides for assistance in resolving actions.

2.3.4 Task 4 – Audit Support

Task 4 Background: Audit support will be requirements for the annual Independent Public Accountants (IPA) throughout the inventory validation requirement, normally three to four months. Additional support may be required during different phases of the audit depending on the requirements and needs of the division. Support may include, but not limited to, follow up requests from auditors, process walkthroughs and internal DLA Energy audit testing.

2.3.4.1 Audit EM Team Member: Assist team with collection of evidential matter (EM) for audit purposes. Work directly with the sites to collect the proper EM to include Bills of Lading, meter tickets, DD Form 250, DD Form 2921, DD Form 1348, DD Form 1898, etc. Review source documentation for completeness and accuracy in addition to saving/uploading documents to DACS RM/applicable share drives and providing updates to Team Lead as required. Assisting with specific follow-up requests may be required outside of the IPA audit timeframe (i.e.

additional data and or explanations requested by auditors, provide input when compiling post-audit out brief material).

2.3.5 Task 6 - Program and Contract Management

Task 6 Performance: The Contractor shall perform Program Management and Contract Management duties in support of this contract:

2.3.5.1 The contractor shall provide the necessary resources to effectively oversee the performance of all requirements as defined herein. Within this responsibility, the contractor shall develop and implement a quality control and management oversight plan to effectively manage the staff and the performance per the performance standards established herein.

2.3.5.2 The Contractor shall develop and deliver a monthly status report (MSR) per CDRL A0013 detailing the accomplishment to date, projected activities and a schedule to accomplish those projected activities. This report shall also project the availability of Contractor resources and include copies of completed work products. This report shall be provided electronically to the COR by the 10th working day of each month. If DLA Energy Americas office determines reports are insufficient, the contactor shall revise the report to acceptable levels and resubmit them within 4 days. Performance measures for this requirement are defined in the Performance Requirements Summary (PRS) in Table 2.5.4 below and include timeliness of staff on-boarding, timeliness of deliverables, and consistently meeting performance measures in other performance measures within this contract.

2.3.5.3 The Contractor shall meet at a minimum each month with the CO or their designee and other Government representatives, at the discretion of the CO or designee, to review Contract performance. There may be conditions where the Contractor shall meet more than once in a month due to unanticipated circumstances.

2.3.5.4 The Contractor shall, within ten (10) business days following the contract award date, attend a Kick-Off Meeting to review contract goals and objectives, and to discuss technical requirements, administrative matters, security requirements, project transition, Government Furnished Information/Materials/Equipment (GFI/GFM/GFE), the milestone schedule, review cycles, and invoicing.

2.3.5.4.1 The contractor shall prepare and present their plan for performing the tasks and schedules. The meeting shall be attended by the CO, the COR and Technical Staff and all contractor key personnel and shall be held at the Government facility.

2.3.5.4.2 The Contractor shall develop a kick-off meeting agenda and presentation slides summarizing the contract management and implementation plan and contractor staffing. The agenda shall be delivered five (5) days prior to the proposed kick-off meeting for Government review.

2.3.5.5 The Contractor shall designate and provide a contract Program Manager. The program manager is a person, designated in writing by the Contractor, who has complete authority to act for the Contractor in every detail during the term of the Contract. The Program Manager shall have the authority to accept notices of deductions, inspection reports and all other correspondence on behalf of the Contractor. The Program Manager can be dual-hatted and also serve as one of the analysts. This position would be located in the DLA Energy Americas East offices in Houston, Texas.

2.3.5.6 Transition-in Performance: The contractor shall plan for and execute a transition-in strategy to provide for the on-boarding of appropriately qualified personnel, with the required DoD security clearances and certificates, needed to support a smooth and seamless transition to “full performance” within 60 calendar days of contract award. Transition-in includes all staffing activities, as well as the necessary knowledge transfer and capture to ensure “work-in-progress” is smoothly transitioned, and mission support is not interrupted. Performance measures for the first 60 days will be recorded and reported for monitoring purposes, but will not be used as performance indicators until the completion of the 3rd month of performance. The exception to this suspension of performance measures will be measures associated with this transition-in requirement. The performance measure for this requirement is defined in the PRS below and focuses on the on-boarding of support staff per the transition-in plan included in the contractor proposal.

2.3.5.7 Transition-out Performance: The contractor shall plan for and support the smooth and seamless transition-out at the end of the performance period. The contractor shall develop and deliver a transition-out plan (CDRL A0016) defining their knowledge transfer plan with specific emphasis on transiting work-in-progress. The contractor shall coordinate with the incoming workforce (government or contactor) as necessary to enable a seamless transition with minimum interruption of mission support. The contractor shall remain accountable for performance consistent with the PRS below until the end of the contract period of performance.

2.4 DELIVERABLES:

2.4.1 The below table represents all deliverables due by the Contractor to the Government after contract award. The reference provided in Table 2.4.1 represents the section of the RFP, or resultant contract that outlines the requirement specifically. The “Deliverable Column” represents the title / type of the item or product due and what format it shall be provided. The frequency and due date is when it is the responsibility of the Contractor to deliver to the COR, or other designated representative as specified in the referenced requirement section.

The report and its recommendations shall become the property of the Government. All audits, review of records, preparation and report submittals forwarded to the Government for approval will be completed within a period not to exceed one (1) year.

Table 2.4.1: Contract Deliverables Requirements List (CDRL)

CDRL # PWS Section Deliverable/Event Objective/ Description Delivery Timing

Task ONE – Inventory Reconciliation Document Review

A0001 2.3.1 Maintain analysis and missing document status

Create file and maintain list of outstanding documents requiring upload with status of any document consider aged.

Monthly

Task TWO – Receiving Report / Invoice Resolution

A0002 2.3.2.1 Residual/Failed Invoice Report

Compile and provide report to region POC of aged unresolved invoices requiring documents from customers/partners.

As assigned

Task THREE – Unmatched Movements (Open TD Shipments) and MUIs

A0003 2.3.3 Slide deck that contains weekly metric and key issues

Compile metrics and slide deck and provide to region POC and COR. Report format will be provided.

Weekly or

ADHOC

A0004 2.3.3 Completeness of Shipments Status Report

Compile report and provide to region POC and COR. Report format will be provided.

Weekly

A0005 2.3.3 Ongoing Concerns Compile notes for ongoing issues with MUI’s and open TD shipments. Provide to Region Leads and COR. Report format will be provided.

Weekly

Task FOUR – Audit Support

A0006 2.3.4 Transaction Level Data

Provide DFSP SAP and or EBS transactional data.

A0007 2.3.5.1 PIEE, Wide Area Work Flow (WAWF) receiving reports and invoices

Compile and provide receiving reports and invoices as required for assigned transactions.

Task SIX– Program and Contract Management

A0013 2.3.6.2 Monthly Status Report (MSR)

Provides summary of the status of activities and plans for the completed month.

Monthly – no later than 10th day of each month

A0014 2.3.6.4 Kick-Off/Post Award Meeting Agenda and Presentation

Introductions, review and discussions.

No later than 10 days after date of award

A0015 2.3.6.4.2 Staffing Plan Present all Key and non-key personnel planned to be staffed for contract

No later than 5 award or 5 days prior to the Kick- Off/Post Award meeting

A0016 2.3.6.7 Transition Out Performance Plan

Support knowledge transfer and smooth transition at the end of the contract.

60 days prior to the expiration of the contract

A0017 2.5 Quality Control Plan

Management oversight, and Risk management plan for managing performance

No later than 10 award

2.5 QUALITY CONTROL/GOVERNMENT REMEDIES

2.5.1 The Contractor shall develop and maintain an effective quality control program to ensure services are performed in accordance with the PWS. The Contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Contractor‘s quality control program is the means to which the Contractor can quantifiably ensure compliance to the requirement of the resultant contract. Refer to Section 2.4 for a complete list of deliverables that correspond to all paragraphs below unless specified as “none” in Table 2.4.1, Deliverables:

2.5.2 The CO, COR, and/or other Government personnel, as appropriate, will meet monthly with the Contractor to review the Contractor's performance. At these meetings, the applicable Government personnel will apprise the Contractor of how the Government views the Contractor's performance, and the Contractor shall apprise the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

2.5.3 The service requirements are summarized into performance objectives that relate directly to mission-essential items. The performance threshold briefly describes the minimum acceptable levels of service required for each task or deliverable. These thresholds are critical to mission success.

Table 2.5.4 Performance Requirements Summary (PRS):

PWS

Paragraph

Performance Objective

Performance Metric

Acceptable Quality Level

(AQL)

Method of Surveillance

2.3.6 Provide necessary

resources and quality control and management plan for effective execution of contract requirements

A rating of “Very Good” for Quality of resources to include timeliness of on-boarding, staffing effectiveness, timeliness and quality of deliverables and meeting of objectives.

No more than one instance where the contractor earned less than satisfactory rating from end users

COR surveillance through end user surveys monthly

2.3.6.4 Program and

Contract Management – attend Kick-

Meeting

Timeliness of Kick-Off/Post Award meeting relative to the start date of the performance period of the contract

Conduct Kick-meeting within 10 days from the first day of the contract.

One Time Surveillance

2.3.6.5 Program

Management – designate and provide a Program Manager for the duration of the contract

Timeliness of the availability of the Program Manager relative to the start date of the of the contract

Program Manager to be designated and available on the first day of contract. No more than 2 days without a designated Program Manger

2.3.6.5 Respond to

communication inquiries within 1-business day

Resolve issues and problems in a timely, professional manner.

A rating of “Very Good” for interaction between the Contractor and the Government where the contractor earned less than satisfactory

2.3.6.6 At contract

initiation, the contractor shall ensure planned personnel are appropriately pre-screened and on-boarded to DLA per the proposed Staffing Plan.

Staff Transition Metric = number of planned staff positions fully on-boarded at DLA Energy / number of staff positions scheduled to be on-boarded at the end of the performance period.

1st Month

AQL>85%

2nd Month

AQL>95%

3rd Month

AQL>98%

Data will be collected form the MSR and compared to the Staffing Plan in the proposal. Metrics will be as the cut-off date of the MSR.

Metric can be validated using the DLA security records.

COR surveillance monthly

2.3.6.6 After the initial

transition period, the contractor shall ensure staffing is available as required to meet performance requirements and unplanned staff vacancies are held at a minimum

Key Personnel Availability Metric = number of Key Personnel staff positions filled / number of Key Personnel established in the

PWS

Non-Key Personnel Availability Metric = number of staff positions reporting / number of staff in staffing plan

Metric begins after the transition period

AQL for Key Personnel >100%

AQL for Non- Key Personnel >90%

Data will be collected from the MSR and will be as of the cur-off date of the MSR for each period.

2.3.6.7 Plan for and support

the smooth and seamless transition-out at the end of the

A rating of “Very Good” for Quality of Transition Plan

Zero instances where the contractor earned less than satisfactory end user surveys

One Time Surveillance

2.4.1 Deliver required

reports.

All deliverables/reports contain all required information.

where the contractor failed to deliver required reports with all required information

2.4.1 Timeliness, Accuracy, Completeness

All deliverables submitted shall be timely, accurate, and free of grammatical and spelling errors, clear, concise and complete.

where the contractor earned less than satisfactory

2.5 Ensure services are

in compliance IAW with the PWS

Provide timely notification on items requiring government action.

contractor failed to notify government

2.5 Ensure services are

performed IAW with the PWS

Provide timely notification on items requiring government action.

contractor failed to notify government

2.6 KEY PERSONNEL

2.6.1 The Contractor must propose a minimum of three (3) “Key Personnel” with the skillset, working knowledge, necessary qualifications and Subject Matter Experts (SME) to effectively perform the scope of work for this PWS. Key Personnel proposed shall fully meet or possess the respective qualifications, experience level, degrees and/or certifications for which they are proposed by the Contractor at the time proposals are submitted. The following three (3) personnel are considered Key: Program Manager, Contract Manager and Senior Analyst.

2.6.1.1 Program Manager (or equivalent Labor Category with the requisite experience and education)

2.6.1.1.1 Experience and Skill set required:

1. Demonstrated experience in leading a team and project management

2. Demonstrated experience in the DoD fuel community and DFSP operations to include, shipments, receipts, sales, inventory. 6 years minimum

3. Demonstrated experience and knowledge of DoD or Civilian Energy Policy and Procedures. DLA experience will be considered a strength.

4. Personnel with integral and demonstrated knowledge of EBS will be considered as a strength

5. Knowledge of DLA Energy HQ and Region organizational structure will be considered as a strength.

6. Demonstrated experience of compiling reports, metrics data, and other administrative functions, including skills and experience in building and maintaining effective working relationships with a wide array of government or non-government personnel and organizations, 3 years minimum

7. Microsoft Office skills and experience, 5 years minimum

8. Be eligible to obtain a Government Clearance, IT-II Investigation.

9. Speak, read and write the English language fluently.

10. Possess a Bachelor’s degree from an accredited educational institution.

2.6.1.2 Contract Manager (CM):

2.6.1.2.1 The Contractor shall designate a CM in its proposal. The CM has full authority to act on behalf of the Contractor on Contractual matters relating to the Contract. The individual’s point of contact information (name, telephone and email) must be submitted, as well as, point of contact information for an alternate or alternates that will act in the primary CM’s absence. The CM must be available via telephone or electronic mail during normal business hours, unless otherwise stated.

2.6.1.2.2 The Program Manager can also fill the role as the CM, but the role must clearly be annotated on the staffing plan.

2.6.1.3 Senior Analyst: (or equivalent Labor Category with the requisite experience and education) One (1) or more Full Time Equivalent (FTE)

2.6.1.3.1. Experience and Skill Set Required:

1. Demonstrated experience in leading a team and project.

2. Demonstrated experience in the DoD fuel community and DFSP operations to include, shipments, receipts, sales, inventory. 2 years minimum

3. Demonstrated experience and knowledge of DoD or Civilian Energy Policy and

4. Knowledge of DLA Energy HQ and Region organizational structure will be considered as a strength personnel with integral and demonstrated knowledge of EBS will be considered as a strength

5. Microsoft Office skills and experience, 5 years minimum

6. Be eligible to obtain a Government Clearance, IT-II Investigation.

7. Speak, read and write the English language fluently.

8. Possess a Bachelor’s degree from an accredited educational institution.

2.6.2 Resumes, degrees and certifications must be provided at proposal submission for key personnel illustrating the required security clearance, qualifications, and experience in performing the duties of the position.

2.6.3 The Contractor shall make no substitution of submitted and accepted key personnel unless the substitution is necessitated by illness, death, or termination of employment. The Contractor shall notify the Contracting Officer and COR within three business days after the occurrence of such an event and provide a detailed explanation of the circumstances necessitating the proposed substitution, complete resume for the proposed substitute and any additional information requested by the COR. Proposed substitute must have comparable qualifications to those of the person being replaced. The Contracting Officer will notify the Contractor of the acceptability of the substitute(s) within five business days after receipt of all requested information.

2.6.4 If the Contracting Officer determines that (1) suitable and timely replacement of key personnel who have been reassigned, terminated or have otherwise become unavailable for the contract work is not reasonably forthcoming or (2) the resultant substitution would be so substantial to impair the successful completion of the contract in accordance with the proposal accepted by the Government at the time of contract award, the Contracting Officer may (1) terminate the contract for cause/default or for the convenience of the Government, as appropriate or (2) at his/her discretion, if the Contracting officer finds the Contractor at fault for the condition, equitably adjust the contract price downward to compensate the Government for any resultant delay, loss or damages.

2.7 NON-KEY PERSONNEL REQUIREMENTS AND QUALIFICATIONS

2.7.1. The contractor team must demonstrate experience and operational skills, across the collective, non-key personnel staffing plan, to perform the following:

1. Demonstrated experience and knowledge of DoD or Civilian Energy Policy and

2. Resume demonstrates experience and/or knowledge of DoD Service Components and DFSP Operations.

3. Knowledge and functionality of the Fuels Manager Defense and Enterprise Business System.

4. Demonstrated ability to work effectively independently and in a team environment.

Demonstrated experience working within the Microsoft Office Suite.

5. Be eligible to obtain a Government Clearance, IT-II Investigation.

6. Speak, read and write the English language fluently.

7. Possess a Bachelor’s degree from an accredited educational institution or 4 years of relevant experience as noted in section 2.7.1

2.7.2. Resumes, degrees and certifications must be provided at proposal submission for non-key personnel illustrating the required security clearance, qualifications, and experience in performing the duties of the position. If the contractor requests to add new non-key personnel for the performance of this contract, the contractor must provide the resume(s) and copies of qualifications of the new personnel to the COR at least three (3) business days prior to that new employee’s commencement of performance for the Governments review and approval.

2.8 CONTRACTING OFFICER’S REPRESENTATIVE (COR)

DESIGNATION

2.8.1 After contract award, the Contracting Officer will appoint a COR and issue a COR Designation Letter stating the authority of the COR. The Contractor shall receive a copy of the written designation. Management of this task will primarily be performed by the COR. The COR will participate in project meetings, represent the CO in the technical phases of the work, and receive contract deliverables. The COR will provide technical assistance and clarification required for the performance of this task. The COR will not provide any supervision or instructional assistance to Contractor personnel.

2.8.2 The COR is not authorized to change any terms or conditions of the Contract or contract.

Changes in the contract requirements, price or terms and conditions shall only be made by the CO via properly executed modifications to the Contract or contract.

2.9 TECHNICAL DIRECTION

2.9.1 Performance of the work under this Contract shall be subject to the technical direction of the CO or COR. The term "technical direction" is defined to include, without limitation:

2.9.1.1 Directions to the Contractor which fill in details or otherwise serve to accomplish the

PWS.

2.9.1.2 Provision of written information to the Contractor which assists in the interpretation of drawings, specifications or technical portions of the work description.

2.9.1.3 Review and, where required by the Contract, approval of technical reports, drawings, specifications and technical information to be delivered by the Contractor to the Government under the Contract.

2.9.2 Technical direction must be within the scope of work stated in the Contract. The COR does not have the authority to, and may not, issue any technical direction which:

2.9.2.1 Constitutes an assignment of additional work outside the PWS.

2.9.2.2 Interferes with the Contractor's right to perform the terms and conditions of the Contract.

All technical directions shall be issued in writing by the CO or COR.

2.9.3 The Contractor shall proceed promptly with the performance of technical directions duly issued by the CO or COR in the manner prescribed by this article and within his authority under the provisions of this clause. If, in the opinion of the Contractor, any instruction or direction falls within one of the above categories, the Contractor shall not proceed but shall notify the CO in writing within five (5) working days after receipt of any such instruction or direction and shall request the Contracting Officer to modify the Contract accordingly. Upon receiving the notification from the Contractor, the Contracting Officer shall:

2.9.3.1 Advise the Contractor in writing within thirty (30) days after receipt of the Contractor’s letter that the technical direction is within the scope of the Contract effort and does not constitute a change under the "Changes" clause of the contract.

2.9.3.2 Advise the Contractor within a reasonable time that the Government will issue a written change order. A failure of the Contractor and Contracting Officer to agree that the technical direction is within the scope of the Contract, or a failure to agree upon the Contract action to be taken with respect thereto, shall be subject to the provisions of the clause entitled "Disputes - Alternate I" of the contract.

2.10 SUBCONTRACT MANAGEMENT

2.10.1 The contractor shall be responsible for any subcontract management necessary to integrate work, and shall be responsible and accountable for subcontractor performance on the requirements of this PWS. The contractor shall manage work distribution to ensure there are no

Organizational Conflict of Interest considerations.

2.11 TRAVEL and OTHER DIRECT COSTS

2.11.1 Travel is not anticipated. If travel is required it will be based on Agency requirements to locations outside of the Houston and Los Angeles Basin areas. The Contractor shall provide a detailed estimate of any desired travel in advance to the COR in writing via memorandum or email. All travel costs shall not exceed on a daily basis the maximum per diem rates in effect at the time of travel as set forth in the DoD Joint Travel Regulations. All travel shall be approved by the COR in writing via memorandum or e-mail prior to the contractor incurring any travel expenses and prior to any departure. Travel reimbursement will be for travel costs and per diem only in accordance with the Joint Travel Regulations and FAR 31.205-46. The Government will not reimburse local travel and related expenses to the vendor for daily travel to or from work at Houston, TX or Los Angeles Basin, CA.

2.11.2 Other Direct Costs (ODC) are not anticipated.

2.12 GOVERNMENT FURNISHED ITEMS

2.12.1 Government-Furnished Property (GFP):

Government-Furnished Property - The Government will provide computers, local area network (LAN) access, software, general administrative support equipment, and other material needed to perform the requirements of this PWS. The Government will also provide DoD remote access software on Government-furnished computers to enable access to unclassified DLA Energy systems and networks.

Use of Government-furnished computers and DoD remote access software will be in accordance with DoD and DLA Energy Telework policies and procedures.

The Government will not be responsible for operating, maintenance, or any other costs (e.g., utilities) whatsoever associated with the use of Government-furnished computers and DoD remote access software at the contractor’s facilities. GFP shall be used for official use and authorized purposes only. Family members and friends of employees or Service members are not authorized to use Government Furnished Equipment (GFE) and materials. GFP must be returned to the DoD Component at the conclusion of teleworking arrangements or at the Component’s request. Except for those items specifically stated to be Government furnished, the contractor shall furnish everything required to perform the requirements of this PWS.

2.12.2 Government-Furnished Information:

The Government will provide copies of, or access to, all required Government directives, publications and documentation, and will provide other necessary resources and information to accomplish the requirement. The Contractor must ensure protection, through completed non-disclosure statements, of the integrity and sensitivity of the information provided by DLA Energy or collected from any other source while performing under this requirement. All documents and technical data provided to the Contractor during the execution of this service are considered confidential and shall not become property of the Contractor, unless specifically authorized by DLA Energy.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .